This document includes a federal contract opportunity notice and related work clearance request form. The contract opportunity notice is for a Multiple Award Construction Contract for Mountain Home Air Force Base, Idaho, with a contract ceiling of $90 million awarded via task orders ranging from $2,000 to $15 million. The North American Industry Classification System code is 236220, with an annual size standard of $36.5 million. The solicitation is expected to be issued on or around May 21, 2019 electronically on the Federal Business Opportunities website. The work clearance request form is used to coordinate utility and infrastructure work at Mountain Home Air Force Base requiring clearances from various base activities and units.

MACC SOW Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Mountain Home AFB MACC, newest first.
File Type Posted
Attachment_27_MHAFB-Dsize-ASBUILT_titleblock.dwg DWG drawing
Attachment_29_Ductwork_Drawing.pdf PDF
Attachment_26_Sample_Contract_Progress_Schedule.pdf PDF
Attachment_28_MHAFB-Dsize-PROJECT_coversheet.dwg DWG drawing
Q&A_Responses.docx DOCX document
Solicitation_Amendment_FA489719RA0040001_SF_30.pdf PDF
Attachment_25_Zones_and_Loads.pdf PDF
MACC_SITE_VISIT_presentation.pdf PDF
MACC_SITE_VISIT_sign_in_sheet.pdf PDF
SFS_FORM_30_MACC.pdf PDF
Attachment_20_-_WD_Highway_Elmore.pdf PDF
MACC_SOW_Atch_4_-_Contractor_HAZMAT_Reporting_Form.pdf PDF
Attachment_12_-_Determination_of_Responsibility.pdf PDF
Attachment_19_-_WD_Heavy_Elmore.pdf PDF
Attachment_15_-Schedule_of_Submittals_(Form_66).pdf PDF
MACC_SOW_Atch_2_-_Base_Civil_Engineer_Work_Clearance_Request_20160401.pdf PDF
Attachment_5-_Bid_Schedule.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6_-_AF3064_Contract_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_2_-_MACC_Statement_of_Work.pdf PDF
Attachment_13_-_TOPR.pdf PDF
Attachment_17__WD_Building-Sample_Project.pdf PDF
Solicitation_-_FA489719RA004.pdf PDF
Attachment_1_-_Sections_L_and_M.pdf PDF
Attachment_24_-_WD_Highway_Ada.pdf PDF
Attachment_18_-_WD_Residential_Elmore.pdf PDF
Attachment_21_-_WD_Residential_Ada.pdf PDF
Attachment_16_-_Bldg_927_Areas_of_Work.pdf PDF
Attachment_7_-_AF_Form_66_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment_10__-_Bonding_Information_Request.pdf PDF
Attachment_14_-_Project_New_Addition_As-builts_Part2.pdf PDF
Attachment_22_-_WD_Building_Ada.pdf PDF
Attachment_9_-_Past_Peformance_Information_Sheet.pdf PDF
Attachment_11_-_Financial_Information_Request.pdf PDF
Attachment_23_-_WD_Heavy_Ada.pdf PDF
MACC_SOW_Atch_5_-_Contractors_Monthly_Usage_Reporting_Form.pdf PDF
MACC_SOW_Atch_1_-_MHAFB_Temporary_Environmental_Controls_MHAFB_Env_Spec_20180628.pdf PDF
Attachment_4_-_AF_3052_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Attachment_14_-_Project_New_Addition_As-builts_Part1.pdf PDF
Attachment_3_-_Sample_Project_Statement_Of_Objectives_Bldg_927.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cass Shop

Geo Base

MXG (If in airfield area)- Maj Sullivan, CMSgt Long, SMSgt Darling; Bldg: 7270 Rm: 127; Ph: 5824

DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND

I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND

3. DATE CLEARANCE REQUIRED 4. DATE OF CLEARANCE

5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION

ORGANIZATION REMARKS (Use Reverse for additional comments) REVIEWER'S NAME AND INITIALS

8.

A. ELECTRICAL DISTRIBUTION

B A

S B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTIONV

I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G

I

G. PAVEMENTS/ GROUNDSN

E

E H. FIRE PROTECTION

R

I

I. ZONEN

G

J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

16. REQUESTED CLEARANCE APPROVED DISAPPROVED

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.AF FORM 103, 19940801 (IMT-V1)

To include Cathodic and WIMS cable: Ralph Dupres/Mark Butler Bldg 8210 Ph. 5538/5541

H/W & Chilled Water Lines & Ice Melt at 7502 Mr. Davis, Bldg 8210, Ph 2503

28 CES Utilities Shop (To include irrigation lines) Mr. Smith, Bldg 8210, Ph. 5395 or 6222

Mr. Spicer/Mr. Fairey Bldg 8210, Ph. 2507 or 5402

28 CES Utilities Shop Mr. Smith or Mr. Israel Bldg 8210, Ph. 5395 or 6222

Compliance - Mr. Johnson, Bldg 8225 Ph. 2692 Restoration - Ms. Jensen, Bldg 8225 Ph. 2685

Mr. Macy or Mr. Malone, Bldg 7612 Dock #52 Ph. 2209 This includes RIDS (R/W Ice Detection System)

Mr. Beck Bldg 7502, 385-7306 Mr. Hilton, Fire Dept., Ph. 385-7305

Bldg 8210 Ph. 385-5143 Mr. Davis

Mr.Pape (CEN) Bldg: 1st floor bldg 8225; Ph: 385-6420

SFS Desk 5-4001 (Resource Security office near south door) Bldg 4400 Lori Watson Ph# 5-2988

Mr. Smartt or Mr. Walter, Base Ops.

Bldg 7501 Ph. 385-7233

Bldg 4307 Ph. 385-8353

MSgt Martinez (If on Airfield, Call Before You Dig) Base Ops, Bldg 7501 Ph. 385-1052/4275/1065

Mid-Continent Cable Quest One Stop 800-781-7474 Confirmation #

Telephone Systems O & M Contractor 385-1543 Bldg #4307

Natural Gas Maint.Mr. Smith/Mr. Israel Bldg 8210 Ph. 6222 or 5395

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)