This Task Order Proposal Request (TOPR) outlines requirements for a design/build project to repair electrical and HVAC systems at Facility 927 at Mountain Home Air Force Base in Idaho. Key details include:

  • The project scope involves repairing electrical and HVAC systems at a PMEL facility. Site visits will be held on specific dates with questions due by a specified date. 65% design proposals are due by a specified date.

  • Design/construction timelines are outlined with 35%, 65%, 95% and 100% design due within a specified number of calendar days of the design notice to proceed. Price proposals are due by a specified date. Construction is to be completed within 210 calendar days of the construction notice to proceed.

  • The estimated project value is between $250,000 and $500,000. Proposals must be submitted by a specified acceptance date. The contract will be awarded to the lowest price technically acceptable offer using firm fixed price terms.

Attachment 13

View the file

Other files for this federal contract opportunity

Other files attached to Mountain Home AFB MACC, newest first.
File Type Posted
Attachment_28_MHAFB-Dsize-PROJECT_coversheet.dwg DWG drawing
Solicitation_Amendment_FA489719RA0040001_SF_30.pdf PDF
Attachment_25_Zones_and_Loads.pdf PDF
Q&A_Responses.docx DOCX document
Attachment_27_MHAFB-Dsize-ASBUILT_titleblock.dwg DWG drawing
Attachment_29_Ductwork_Drawing.pdf PDF
Attachment_26_Sample_Contract_Progress_Schedule.pdf PDF
MACC_SITE_VISIT_presentation.pdf PDF
MACC_SITE_VISIT_sign_in_sheet.pdf PDF
SFS_FORM_30_MACC.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6_-_AF3064_Contract_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_2_-_MACC_Statement_of_Work.pdf PDF
Attachment_17__WD_Building-Sample_Project.pdf PDF
Solicitation_-_FA489719RA004.pdf PDF
Attachment_23_-_WD_Heavy_Ada.pdf PDF
MACC_SOW_Atch_5_-_Contractors_Monthly_Usage_Reporting_Form.pdf PDF
MACC_SOW_Atch_1_-_MHAFB_Temporary_Environmental_Controls_MHAFB_Env_Spec_20180628.pdf PDF
Attachment_4_-_AF_3052_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Attachment_14_-_Project_New_Addition_As-builts_Part1.pdf PDF
Attachment_3_-_Sample_Project_Statement_Of_Objectives_Bldg_927.pdf PDF
Attachment_1_-_Sections_L_and_M.pdf PDF
Attachment_24_-_WD_Highway_Ada.pdf PDF
MACC_SOW_Atch_3_-AF_Form_103_Work__BCE_Clearance_Request.pdf PDF
Attachment_18_-_WD_Residential_Elmore.pdf PDF
Attachment_21_-_WD_Residential_Ada.pdf PDF
Attachment_16_-_Bldg_927_Areas_of_Work.pdf PDF
Attachment_7_-_AF_Form_66_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment_10__-_Bonding_Information_Request.pdf PDF
Attachment_14_-_Project_New_Addition_As-builts_Part2.pdf PDF
Attachment_22_-_WD_Building_Ada.pdf PDF
Attachment_9_-_Past_Peformance_Information_Sheet.pdf PDF
Attachment_11_-_Financial_Information_Request.pdf PDF
Attachment_20_-_WD_Highway_Elmore.pdf PDF
MACC_SOW_Atch_4_-_Contractor_HAZMAT_Reporting_Form.pdf PDF
Attachment_12_-_Determination_of_Responsibility.pdf PDF
Attachment_19_-_WD_Heavy_Elmore.pdf PDF
Attachment_15_-Schedule_of_Submittals_(Form_66).pdf PDF
MACC_SOW_Atch_2_-_Base_Civil_Engineer_Work_Clearance_Request_20160401.pdf PDF
Attachment_5-_Bid_Schedule.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER PROPOSAL REQUEST (TOPR)

Mountain Home AFB Multiple Award Construction Contract (MACC)

Issued By: 366th Financial Acquisition Squadron/PKB 4 April 2019 512 Gunfighter Ave Mountain Home AFB, ID 83648

Point of Contact: Kevin Kirkendall, (208) 828-3116, kevin.kirkendall.3@us.af.mil

PROJECT NUMBER: QYZH 16-0012

PROJECT TITLE: Repair Electrical and HVAC, Facility 927, Mountain Home AFB, ID

STATEMENT OF WORK: Furnish all plant, labor, equipment, materials, tools and other items required to complete this project in accordance with the Statement of Objectives (SOO), attached documents, Wage Determination ID180020, dated 09/07/2018 and all other the terms and conditions of the basic contract. This Design/Build project is to Repair Electrical and HVAC, PMEL, in Facility 927.

SITE VISIT/PRE-PROPOSAL MEETING: The site visit is scheduled for XXX at XXX.

XXX

366 Gunfighter Ave, Ste 498 Mountain Home AFB, ID

Questions following the site visit are due to the Contracting Office not later than XXX.

SUBMISSION OF 65% DESIGN PROPOSALS: A 65% design proposal will be due to the Contracting Officer on XXX. The contractor shall use the provided drawings, and the information included in the SOO.

DESIGN PERFORMANCE PERIOD: The Government is proposing the following timetable for the Design/Construction requirement:

35% Design: XX calendar days following issuance of the Design Notice to Proceed (NTP).

65% Design: XX calendar days following issuance of the Design Notice to Proceed (NTP).

95% Design: XX calendar days following issuance of the Design Notice to Proceed (NTP).

100% Design: XX calendar days following issuance of the Design Notice to Proceed (NTP).

SUBMISSION OF PRICE PROPOSALS: Price proposals for this project are due to the Contracting Office on XXX.

PERFORMANCE PERIOD:

Construction: 210 calendar days following the issuance of the Construction Notice to Proceed

MAGNITUDE OF CONSTRUCTION PROJECT: Estimated between $250,000 and $500,000.

PROPOSAL ACCEPTANCE PERIOD: Government acceptance will occur on or before 30 Sept 2019.

PROPOSAL PREPARATION INSTRUCTIONS: Reference MACC Statement of Work dated 13 Mar 2019.

BASIS OF AWARD: In accordance with Section M. award will be made to the Lowest Price Technically Acceptable.

Only one task order will be awarded for this project.

FA4897-19-R-A004

Attachment 13 mailto:kevin.kirkendall.3@us.af.mil

TERMS AND CONDITIONS SPECIFIC TO THIS PROJECT:

NOTICE TO PROCEED: Other than submittal of payment and performance bonds, the Contractor shall not proceed with performance of this project until the Contractor receives a Notice to Proceed from the Contracting Officer. Notice to Proceed will be issued within thirty (30) days of award and work will begin within ten (10) calendar days after issuance of the Notice to Proceed.

PERFORMANCE AND PAYMENT BONDS: Payment and Performance Bonds will be required for this project.

Bonds are due no later than 10 calendar days after award.

WAGE RATES – The attached Davis Bacon wage decision applicable to this procurement is General Decision Number ID180020, Modification ID20170020, dated 09/07/2018 – Building.

LIQUIDATED DAMAGES: N/A

INVOICES: Invoices may be submitted for progress payments based on a percentage of work completed.

Invoices will be submitted electronically using Wide Area Flow (WAWF) procedures.

COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK:

The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives the Construction Notice to Proceed, prosecute the work diligently, and complete the entire work ready for use within the stated days after issuance of the Notice to Proceed.

ATTACHMENTS PROVIDED:

1. Statement of Objectives, QYZH 16-0012 (Attachment 3)

2. New Addition As-builts (Attachment 14)

3. Schedule of Submittals (Attachment 15)

4. Areas of Work (Attachment 16)

5. General Decision Number ID180020 (Attachment 17)

OFFEROR PLEASE

COMPLETE THE FOLLOWING:

COMPANY NAME: ___________________________________ DATE: ________________

OFFEROR'S SIGNATURE: ____________________________________________________

TITLE OF PERSON AUTHORIZED TO SIGN: _________________________________

FA4897-19-R-A004

Attachment 13

COMPANY NAME: ___________________________________ DATE: ________________
OFFEROR'S SIGNATURE: ____________________________________________________