This notice announces an upcoming solicitation for a Multiple Award Construction Contract at Mountain Home Air Force Base in Idaho. The contract will have a total ceiling of $90 million to be awarded across six contractors for construction projects ranging from $2,000 to $15 million each.

Requirements will include new construction, renovation, alteration, demolition, and repair work. Projects may involve design-build or design-bid-build approaches. Trades will include carpentry, roadwork, roofing, utilities installation, and other construction specialties. The period of performance will be five years with task orders issued on a firm-fixed-price basis.

The solicitation is expected to publish on May 21, 2019 on FBO. It will use the Lowest Price Technically Acceptable source selection method. Interested parties should monitor FBO for amendments and register there to receive notifications. Offerors must also be registered in SAM. The seed project involves work at Mountain Home Air Force Base in Idaho.

Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Mountain Home AFB MACC, newest first.
File Type Posted
Solicitation_Amendment_FA489719RA0040001_SF_30.pdf PDF
Attachment_25_Zones_and_Loads.pdf PDF
Attachment_28_MHAFB-Dsize-PROJECT_coversheet.dwg DWG drawing
Q&A_Responses.docx DOCX document
Attachment_27_MHAFB-Dsize-ASBUILT_titleblock.dwg DWG drawing
Attachment_29_Ductwork_Drawing.pdf PDF
Attachment_26_Sample_Contract_Progress_Schedule.pdf PDF
MACC_SITE_VISIT_presentation.pdf PDF
MACC_SITE_VISIT_sign_in_sheet.pdf PDF
SFS_FORM_30_MACC.pdf PDF
Attachment_23_-_WD_Heavy_Ada.pdf PDF
MACC_SOW_Atch_5_-_Contractors_Monthly_Usage_Reporting_Form.pdf PDF
MACC_SOW_Atch_1_-_MHAFB_Temporary_Environmental_Controls_MHAFB_Env_Spec_20180628.pdf PDF
Attachment_14_-_Project_New_Addition_As-builts_Part1.pdf PDF
Attachment_3_-_Sample_Project_Statement_Of_Objectives_Bldg_927.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6_-_AF3064_Contract_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_2_-_MACC_Statement_of_Work.pdf PDF
Attachment_13_-_TOPR.pdf PDF
Attachment_17__WD_Building-Sample_Project.pdf PDF
Solicitation_-_FA489719RA004.pdf PDF
Attachment_1_-_Sections_L_and_M.pdf PDF
Attachment_24_-_WD_Highway_Ada.pdf PDF
MACC_SOW_Atch_3_-AF_Form_103_Work__BCE_Clearance_Request.pdf PDF
Attachment_18_-_WD_Residential_Elmore.pdf PDF
Attachment_21_-_WD_Residential_Ada.pdf PDF
Attachment_16_-_Bldg_927_Areas_of_Work.pdf PDF
Attachment_7_-_AF_Form_66_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment_10__-_Bonding_Information_Request.pdf PDF
Attachment_14_-_Project_New_Addition_As-builts_Part2.pdf PDF
Attachment_22_-_WD_Building_Ada.pdf PDF
Attachment_9_-_Past_Peformance_Information_Sheet.pdf PDF
Attachment_11_-_Financial_Information_Request.pdf PDF
Attachment_20_-_WD_Highway_Elmore.pdf PDF
MACC_SOW_Atch_4_-_Contractor_HAZMAT_Reporting_Form.pdf PDF
Attachment_12_-_Determination_of_Responsibility.pdf PDF
Attachment_19_-_WD_Heavy_Elmore.pdf PDF
Attachment_15_-Schedule_of_Submittals_(Form_66).pdf PDF
MACC_SOW_Atch_2_-_Base_Civil_Engineer_Work_Clearance_Request_20160401.pdf PDF
Attachment_5-_Bid_Schedule.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
Fill Here
LOCATIONPROJECT NO.Fill Here
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTS28.7%50.00
DIVISION 02EXISTING CONDITIONS34.2%59.48
DIVISION 03CONCRETE WORK37.1%64.45FILL IN AS REQUIRED (this will link to the entire document)
DIVISION 04MASONRY0.0%- 0
DIVISION 05METALS0.0%- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITES0.0%- 0GC Overhead10.00%
DIVISION 07THERMAL AND MOISTURE PROTECTION0.0%- 0GC Profit15.00%
DIVISION 08OPENINGS0.0%- 0Sub Overhead5.00%
DIVISION 09FINISHES0.0%- 0Sub Profit11.00%
DIVISION 10SPECIALTIES0.0%- 0Sales Tax6.00%
DIVISION 11EQUIPMENT0.0%- 0Risk/Bonding2.00%
DIVISION 12FURNISHINGS0.0%- 0
DIVISION 13SPECIAL CONSTRUCTION0.0%- 0This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENT0.0%- 0
DIVISION 15RESERVED0.0%- 0
DIVISION 16RESERVED0.0%- 0
DIVISION 20RESERVED0.0%- 0
DIVISION 21FIRE SUPRESSION0.0%- 0
DIVISION 22PLUMBING0.0%- 0
DIVISION 23HEATING, VENTILATING AND A/C0.0%- 0
DIVISION 24RESERVED0.0%- 0
DIVISION 25INTEGRATED AUTOMATION0.0%- 0
DIVISION 26ELECTRICAL0.0%- 0
DIVISION 27COMMUNICATIONS0.0%- 0
DIVISION 28ELECTRONIC SAFETY AND SECURITY0.0%- 0
DIVISION 29RESERVED0.0%- 0
DIVISION 30RESERVED0.0%- 0
DIVISION 31EARTHWORK0.0%- 0
DIVISION 32EXTERIOR IMPROVEMENTS0.0%- 0
DIVISION 33UTILITIES0.0%- 0
DIVISION 34TRANSPORTATION0.0%- 0
DIVISION 35WATERWAYS AND MARINE CONSTRUCTION0.0%- 0
DIVISION 36RESERVED0.0%- 0
DIVISION 37RESERVED0.0%- 0
DIVISION 38RESERVED0.0%- 0
DIVISION 39RESERVED0.0%- 0
DIVISION 40PROCESS INTEGRATION0.0%- 0
DIVISION 41MATERIAL PROCESING AND HANDLING EQUIPMENT0.0%- 0
DIVISION 42PROCESS HEATING, COOLING AND DRYING EQUIPMENT0.0%- 0
DIVISION 43PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT0.0%- 0
DIVISION 44POLLUTION CONTROL EQUIPMENT0.0%- 0
DIVISION 45INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT0.0%- 0
DIVISION 46RESERVED0.0%- 0
DIVISION 47RESERVED0.0%- 0
DIVISION 48ELECTRICAL POWER GENERATION0.0%- 0
DIVISION 49RESERVED0.0%- 0
HARD COST TOTAL100%173.93
PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)10%17.39
SUBTOTAL191.32
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)15%28.70
SUBTOTAL220.02
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)2%4.40
CONTRACT TOTAL$ 224.42

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N davisjam:

Percentages listed are place fillers. Please complete as required

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input31.0010.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ 50.00

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead5.00%2.50
Sub-Contractor's Profit11.00%5.78
FL State Sales Tax6.00%1.20
TOTAL$ 59.48

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div3

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead10.00%5.00
Sub-Contractor's Profit15.00%8.25
FL State Sales Tax6.00%1.20
TOTAL$ 64.45

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div4

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div5

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div6

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div8

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div10

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div11

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div12

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div13

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div14

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div15

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div16

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div20

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div21

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div22

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div23

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div24

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div25

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div26

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div27

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div28

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div29

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div30

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div31

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div32

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div33

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div34

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div35

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
RESERVED$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div36

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div37

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div38

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div39

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div40

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS INTEGRATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div41

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MATERIAL PROCESING AND HANDLING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div42

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS HEATING, COOLING AND DRYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div43

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div44

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
CODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
POLLUTION CONTROL EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0