Industry_Q A_as_of_29_Oct_13.docx

DOCX document 16 KB Posted

Attached to
E-3 Mission Crew Training Federal contract opportunity
Solicitation number
FA4890-13-R-0122
Issued by
Department of the Air Force Air Combat Command

About this file

Industry Q A as of 29 Oct 13

View the file

Other files for this federal contract opportunity

Other files attached to E-3 Mission Crew Training, newest first.
File Type Posted
Corrective_Action-Award_Synopsis.doc DOC document
Amendment_0004.doc DOC document
Post_RFP_Industry_Q A_15_Jan_2014.pdf PDF
Amendment_0003.doc DOC document
Attachment_1_-_E-3_PWS_v1.2_dated_14_Jan_2014.doc DOC document
Post_RFP_Question_ _Answer_14_Jan_14.xlsx XLSX spreadsheet
Amendment_0002.doc DOC document
E-3_MCT_PWS_v1.2_Changes_14_Jan_14.doc DOC document
Industry_Q A_2_Jan_2014.pdf PDF
Amendment_0001.doc DOC document
Attachment_1_-_E-3_PWS_v1.51_dated_2_Jan_2014.doc DOC document
Attachment_5_-_E3_Style_Guide_Version_1.0__2_Jan_2014.docx DOCX document
Attachment_6_-_Course_Listing.pdf PDF
E-3_MCT_Notice_of_Forthcoming_Amendment_and_Extension.doc DOC document
Attch_3-Slides.pptx PPTX presentation
E-3_Pre-Proposal_minutes.pdf PDF
Attch_1-List_of_Attendees.pdf PDF
Attch_2-Q A.docx DOCX document
Attachment_4_-_E-3_MCT_QASP_18_Oct_13.pdf PDF
Attachment_2_-Final_Draft_DD254.pdf PDF
E-3_RFP_as_of_22_Nov_13_-_FBO.doc DOC document
Attachment_1_-_Final_E-3_MCT_PWS_as_of_20_Nov_2013.doc DOC document
E-3_MCT_Synopsis.doc DOC document
Attachment_3_-_E-3_MCT_CBA_and_WD.pdf PDF
PreProposal_Conference_Notice_6_Nov_13.doc DOC document
Attachment_1_-_Final_E-3_MCT_PWS_as_of_5_Nov_2013.doc DOC document
Draft_RFP_as_of_6_Nov_13.doc DOC document
Draft_E-3_MCT_PWS_as_of_29_Oct_2013.doc DOC document
22_Oct_13_Industry_Q A.docx DOCX document
Final_Draft_DD254_-_FA4890-13-R-0122_10_Oct_13.pdf PDF
DRAFT_RFP_as_of_17_Oct_13.doc DOC document
Attachment_1_-_E-3_MCT_PWS_16_Oct_13.doc DOC document
Industry_Q A_as_of_16_Oct_13.docx DOCX document
Interested_Parties.doc DOC document
Attachment_3_-_E-3_MCT_CBA_and_WD.pdf PDF
PreSolicitation_Notice.doc DOC document
Draft_E-3_Mission_Crew_Training_PWS_29_Aug_13.doc DOC document
Request_for_Industry_Comment_E-3_MTC.docx DOCX document
Draft_E-3_Mission_Crew_Training_PWS_25_Jul_13.doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for E-3 MCT Solicitation # FA4890-13-R-0122 Draft PWS 16 Oct 2013

a. PWS Table C1.3 entries for MIC and MLIC: IAW Table C1.1 there are 12 MIC classes/year for an annual student requirements of 240, or 20 (i.e., 240 divided by12) students per class.

Question: Should MIC Column H on Table C1.3 actually be 20 and column J actually be 10? If so, the K totals would be 3020.4 hours. Following the same logic the MLIC in column should read 16 instead of 20.

RESPONSE: The question is correct: “there are 12 MIC classes/year for an annual student requirements of 240, or 20 (i.e., 240 divided by12) students per class” for the academic phase but not all students are in the ATD phase. PFT schedule allocates 6 seats for Track 2 and 5 seats for Track 3.

There are 3 tracks to the MISSION CREW INSTRUCTOR UPGRADE Syllabus.

1) The first ATD session for everyone is a 3.0 hour session with a 1:4 ratio The second ATD session for everyone is a 3.0 hour session with a 1:2 ratio

2) Track 2 includes two ATD sessions and applies to upgrading Instructor Air Surveillance Technician (IAST), Instructor Senior Surveillance Technician (ISST) and Instructor Air Surveillance Officer (IASO). Duration is 19 training days divided into 4 GTDs and 15 FTDs.

3) Track 3 includes four ATD sessions and applies to upgrading Instructor Electronic Combat Officer (IECO) and Instructor Air Weapons Officer (IAWO).

Numbers in table C1.3 are worst case for MIC, only 2 of 3 tracks of students covering 5 crew positions require ATD training, therefore students per class is less than 20. MLIC does not require device training; however, the students per class was incorrect. Table has been corrected.

b. PWS Table C1.3 details the Training Device workload estimate for ‘Op intro’, but shows no entry in the ‘TTL Dir Hrs Yr’ Column (K).

Question: Is this an oversight?

RESPONSE: Missing hours for Op Intro, TTL Dir Hrs Yr Column (K) was an oversight. Table has been corrected.

File details come from the government source that posted it. Updated .