Atch 38_Nuclear Gauge Form 2

Text of this file

REQUEST FOR AUTHORIZATION TO BRING RADIOACTIVE MATERIALS (RAM) ONTO NELLIS AFB, CREECH AFB, OR THE NEVADA TEST AND TRAINING RANGE (NTTR)

1. NAME OF LICENSEE (person or firm proposing to conduct the activities described below)

2. TYPE OF REQUEST

|_| INITIAL |_| UPDATE

3. ADDRESS OF LICENSEE (mailing address or other location where licensee may be located)

4. LICENSEE CONTACT AND TITLE

5.
6. PHONE NUMBER

7. WORK CELL NUMBER

8. FAX NUMBER

9. LICENSEE RADIATION SAFETY OFFICER NAME

10. RSO PHONE NUMBER

11. LICENSEE EMAIL ADDRESS

12. ACTIVITES TO BE CONDUCTED ON THE INSTALLATION

|_| Well Logging |_| Leak Testing and/or Calibrations |_| Portable Gauges |_| Other (specify):

|_| Radiography

13. INSTALLATION WHERE ACTIVITIES WILL BE CONDUCTED

|_| Nellis AFB |_| Creech AFB

|_| NTTR

14. PRIMARY CONTRACTOR INFORMATION (Name, Address, City, State, Zip Code)

15. ACTUAL PHYSICAL ADDRESS OF WORK LOCATION (Provide GPS coordinates if known)

16. PRIMARY CONTRACTOR PHONE NUMBER
17. WORK LOCATION PHONE NUMBER

Office

Work Cell Office Work Cell

18. DATES FOR REQUEST AUTHORIZATION
19. NUMBER OF DAYS

20. ADD

21. DELETE

22. CONTRACT PROJECT NUMBER

FROM:

TO:

WEEKENDS

|_| YES |_| NO

LIST ADDITIONAL WORK SITES ON A SEPARATE SHEET(S) TO INCLUDE ALL INFORMATION CONTAINED IN ITEMS 12-21 ABOVE

23. PROVIDE A DESCRIPTION OF THE TYPE AND SCOPE OF THE ACTIVITIES TO BE PERFORMED

24. MANUFACTURER:

25. MODEL NO:

26. SERIAL NO:

27. RAM License Number:

28. STATE:
29. EXPIRATION DATE:

30. AUTHORIZED USERS: (Last Name, First Name) This request for authorization must be submitted to the Installation RSO at least 30 calendar days before bringing RAM onto the installation IAW AFI 40-201. Submission of this request for authorization with less than 30 days notice requires a signed letter by the requesting military organization addressing why the requirements of AFI 40-201 could not be met. The letter must also contain a signed acknowledgement from the requesting organization’s group commander.

In addition to this document the following information must be submitted as a part of the request for authorization:

· A copy of the USAF contract clause describing work to be performed at the installation and the inclusive dates of the work.

· A copy of a current NRC or Agreement State license

· Written authorization for the Installation RSO to conduct periodic assessments to ensure contractor personnel are complying with radiation safety practices to prevent exposures to USAF personnel and the general public, as well as, avoiding contamination of government property.

· Applicants holding a RAM license not issued by an Agreement State must also submit an approved NRC Form 241.

· A copy of training certificates for all authorized users listed on this document. Training should be commensurate with the hazard/material being used.

· A copy of a current leak test certificate which meets the requirements of the RAM license.

Failure to submit a complete package containing the aforementioned documents will result in automatic denial of the request.

NOTE: If locations, dates, and times cannot be provided as a result of them being undetermined, written or email notification will be provided to the Installation RSO not later than one day prior to bringing RAM onto the installation. The notification must contain the location, date, and time the activity is to be performed. Failure to comply with this requirement may result in rescinding of the authorization and notification to the NRC and/or State.

WARNING: False statements on this request for authorization to bring radioactive material onto Nellis AFB, Creech AFB, or the NTTR will result in immediate denial of this application or rescinding of your authorization if already issued. Additionally, notification will be made immediately to the Nuclear Regulatory Commission and/or the Agreement State jurisdictionally responsible for your license. Notification to the NRC or State may result in civil and/or criminal penalties.

Other files for this federal contract opportunity

Other files attached to Nellis AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
SYNOPSIS_OF_AWARD.docx DOCX document
AutoCADcombined.dwg DWG drawing
Atch_62__Nellis_Creech_AFB_Facility_Metering_Requirements.pdf PDF
Atch_60_ETL_07-04_AF_Carpet_Standard.pdf PDF
16RA100_Tech_QA_(Part_3).pdf PDF
Atch_61__AF_Facility_Metering_Policy.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision_2.pdf PDF
Atch_43_Schedule_of_Values_Template_UNLOCKED.xlsx XLSX spreadsheet
16RA100SignInRosters.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_48_Teaming_List.doc DOC document
16RA100_Q A_(Part_1).pdf PDF
FA4861-16-R-A100-0003_Amendment.pdf PDF
FA4861-16-R-A100-0001_Amendment.pdf PDF
Atch_25_3PH__CJE_CREECH_4in-Profile_A-size.pdf PDF
Atch_29_Trench_Sand.pdf PDF
Atch_46_WD_NV160022_201600603.pdf PDF
Atch_50_Subcontractor_Teaming_Partner_Consent_Form.doc DOC document
Atch_19_AFI_33-580_Spectrum_Management.pdf PDF
Atch_31_UM3-14-Profile_A-size.pdf PDF
Atch_45_WD_NV160004_20160603.pdf PDF
Atch_06_Engineering_Technical_Letter_20020627.pdf PDF
Atch_52_Past_Performance_Questionnaire.doc DOC document
Atch_41_AF_3064_Progress_Schedule.xfdl XFDL file
Atch_11_AFI_23-204_Material_Management.pdf PDF
Atch_40_AF_3052_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Atch_42_Contract_Progress_Report_Template.xfdl XFDL file
Atch_24_1PH_CJE-Profile_A-size.pdf PDF
Atch_55_Facility_Photos _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_16_AFI_32-7042_Waste_Management.pdf PDF
Atch_10_ACCMAN32-7051_hollomanafbsup_1.pdf PDF
Atch_02_Nellis_Creech_ID2_Handbook_201108.pdf PDF
Atch_12_AFI_32-1021_Planning_and_Programming_MILCON_Projects.pdf PDF
Atch_08_ACC_Architectural_and_Interior_Design_Stds_200201.pdf PDF
Atch_17_AFI_32-7086_Hazardous_Materials.pdf PDF
Atch_32_UM17-2_XFMR-Profile_A-size.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_18_NAFB_Plan_32-7086_Hazardous_Materials_Management_Plan.pdf PDF
Atch_51_Sample_Client_Authorization_Letter.doc DOC document
FA486116RA100_Solicitaion.pdf PDF
Atch_56_Asbestos_ _LBP_Reports _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_48_Teaming_List.doc DOC document
Atch_58_Bid_Schedule _RKMF_16-0062_Rpr_Courtroom _Bldg_16.doc DOC document
Atch_13_AFI_32-1024_Standard_Facility_Requirements.pdf PDF
Atch_23_(CREECH)_UR2_(S).pdf PDF
Atch_21_AFMAN_32-1084_Facility_Requirements.pdf PDF
Atch_33_UM33-Profile_A-size.pdf PDF
Atch_05_Environmental_Permit_ATP_Guidance.pdf PDF
Atch_36_NAFB_0-74_Range_Pass.pdf PDF
Atch_34_UM48-2_Multi-ground_rod-Profile_A-size.pdf PDF
Show all 50

Nellis AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .