SOMS_Building_2379_Storm_Damage
28 KB Posted
- Attached to
- Repair Storm Damage Building 2379 Federal contract opportunity
- Solicitation number
- FA4855-16-B-0018
About this file
SOMS
Text of this file
Sheet1
| AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS | PROJECT # | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||||||||
| CZQZ16-0015 | Repair Storm Damage B2379 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||
| LINE NUMBER | ITEM, DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIF OF COMPLIANCE | SHOP DRAWINGS | SAMPLES / COLOR SELECT | TEST RESULTS | MANF'R RECOMMENDATIONS | MANF'R. WARRANTY | LICENSED APPLICATOR | MANUF'S TECHNICAL DATA | ELECTRONIC FILES (CD) | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | FOLLOW-UP | CONTRACTOR NOTIFIED: Approval Date | CONTRACTOR NOTIFIED: DisApproval Date | CONTRACTOR RE-SUBMITTAL | FINAL APPROVAL | REMARKS |
| 1 | Statement of Work §5 Meetings: Preconstruction Meeting Minutes | 1 | 3 | 5 working days after meeting is held | |||||||||||||||||
| 2 | Statement of Work §5 Meetings: Post Survey Briefing | 1 | 3 | 5 working days after meeting is held | |||||||||||||||||
| 3 | Statement of Work (SOW) §21.1 Constrution Schedule AF Form 3064 | 1 | 2 | 5 working days after meeting is held | |||||||||||||||||
| 4 | SECTION 01 01 00 Work §1.3 C. Clearance Request AF 103 | 1 | 3 | 10 working days prior to start of Construction | |||||||||||||||||
| 5 | SECTION 01 11 00 §1.4 Salvage Plan | 1 | 3 | 10 working days prior to start of Construction | |||||||||||||||||
| 6 | SECTION 01 30 00 §1.3 View Location Map | 1 | 3 | 10 working days prior to start of Construction | |||||||||||||||||
| 7 | SECTION 01 30 00 §1.4 Progress and Completion Pictures | 1 | 3 | Weekly, Throughout the Duration of the Project | |||||||||||||||||
| 8 | SECTION 01 30 00 §1.7.2 Superintendent Qualifications | 1 | 3 | 10 working days after Notice to proceed (NTP) | |||||||||||||||||
| 9 | SECTION 01 35 26 §1.7 Accident Prevention Plan (APP) | 1 | 3 | 15 working days prior to the date of Pre-Construction Meeting | |||||||||||||||||
| 10 | SECTION 01 35 26 §1.12.2 Accident Reports | 1 | 3 | NLT 5 working days after accident/near misses | |||||||||||||||||
| 11 | SECTION 01 35 40.00 20 §1.8 Environmental Protection Plan (EPP) | 1 | 3 | 10 working days after Notice to proceed (NTP) | |||||||||||||||||
| 12 | SECTION 01 35 40.00 20 §3.3 Field Quality Control Reports | 1 | 3 | 10 working days prior to start of Construction | |||||||||||||||||
| 13 | SECTION 01 35 40.00 20 §1.7 Material Safety Data Sheets (MSDS) | 1 | 3 | 10 working days prior to bring material on base | |||||||||||||||||
| 14 | SECTION 01 43 00 §1.1 Traffic Control for Airfield Safety | 1 | 3 | 15 working days after Notice to proceed (NTP) | |||||||||||||||||
| 15 | SECTION 01 45 00.00 10 §3.2 Contractor Quality Control Plan | 1 | 5 working days after Notice to proceed (NTP) | ||||||||||||||||||
| 16 | SECTION 01 74 19 §1.6 Waste Management Plan | 1 | 3 | 10 working days after Notice to proceed (NTP) | |||||||||||||||||
| 17 | SECTION 01 78 00 §3.1 As-built Drawings | 1 | 3 | 20 working days after the completion of construction | |||||||||||||||||
| 18 | SECTION 02 41 00 §1.2.1 Demolition Plan | 1 | 3 | 15 working days prior to start of Construction | |||||||||||||||||
| 19 | SECTION 02 41 00 §1.10 Existing Conditions | 1 | 3 | 15 working days prior to start of Construction | |||||||||||||||||
| 20 | SECTION 02 41 00 §1.6 Demolition Notification | 1 | 3 | 5 working days prior to start of Construction | |||||||||||||||||
| 21 | SECTION 07 60 00 §1.3 Flashing Shop drawing and manufacture information (gutters, downspouts, base flashing, flashing at penetrations, drip edge eave flashing | 3 | 3 | 1 | 3 | 10 working days prior to use of material | |||||||||||||||
| 22 | SECTION 07 92 00 §2.1 Sealants | 3 | 3 | 3 | 1 | 3 | 10 working days prior to use of material | ||||||||||||||
| 23 | SECTION 08 11 13 §2.1 Metal Door and Frame | 3 | 3 | 3 | 3 | 1 | 3 | 10 working days prior to use of material | |||||||||||||
| 24 | SECTION 08 91 00 §2.2- 2.3 Wall and Door Louvers | 3 | 1 | 3 | 10 working days prior to use of material | ||||||||||||||||
| 25 | SECTION 09 30 13 §2.1 Tile | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 26 | SECTION 09 30 13 §2.2- 2.3 Setting-BedTile | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 27 | SECTION 09 30 13 §2.2- 2.3 Mortar, Grout and Adhesive | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 28 | SECTION 09 51 00 §1.3 Shop Drawing | 3 | 1 | 3 | 10 working days prior to use of material | ||||||||||||||||
| 29 | SECTION 09 51 00 §2.1 Acoustical Ceiling System and Ceiling Tiles | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 30 | SECTION 09 65 00 §2.1 VCT TILES | 3 | 3 | 3 | 1 | 10 working days prior to use of material | |||||||||||||||
| 31 | SECTION 09 90 00 §1.3 Coating and Color | 1 | 3 | 10 working days prior to use of material | |||||||||||||||||
| 32 | SECTION 22 00 00 §3.2 Water Heaters and Hot Water Storage | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 33 | SECTION 23 00 00 §1.3 Air Handling Unit | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 34 | SECTION 23 00 00 §1.3 Room Fan-Coil Units | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 35 | SECTION 23 00 00 §1.3 Metal Ducts | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 36 | SECTION 23 00 00 §1.3 Supply Diffusers and Returns | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 37 | SECTION 23 07 00 §1.3 Duct and Pipe Insulation System | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 38 | SECTION 23 11 25 §1.3 Gas Pipe and Fittings | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 39 | SECTION 23 11 25 §1.3 Welders Qualifications | 1 | 3 | 10 working days prior to use of material | |||||||||||||||||
| 40 | SECTION 23 23 00 §2.2 Refrigerant piping material | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 41 | SECTION 23 23 00 §3.4 Refrigerant piping testing | 3 | 1 | 3 | 5 working days after intallation | ||||||||||||||||
| 42 | SECTION 26 00 00.00 20 §3.4 Electrical Shop Drawings | 3 | 1 | 3 | 10 working days after completion of work | ||||||||||||||||
| 43 | SECTION 26 05 19.00 10 §2 Insulated Conductor wire | 3 | 3 | 3 | 10 working days prior to use of material | ||||||||||||||||
| 44 | SECTION 26 08 00 §1.4.3 Accepatance testing and inspection | 3 | 1 | 3 | 10 working days after completion of work | ||||||||||||||||
| 45 | SECTION 26 20 00 §2.2 Conduit Fittings | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 46 | SECTION 26 20 00 §2.11 Circuit breakers | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 47 | SECTION 26 20 00 §2.9 Switches | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 48 | SECTION 26 56 00 §1.3 Photometric plan | 3 | 1 | 3 | 10 working days prior to use of material | ||||||||||||||||
| 49 | SECTION 26 56 00 §2.1.3 Induction Luminaires | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 50 | SECTION 26 56 00 §2.1.3 Luminaire ballasts | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 51 | SECTION 26 56 00 §2.2.1 Photo Cell | 3 | 3 | 3 | 3 | 10 working days prior to use of material | |||||||||||||||
| 52 | |||||||||||||||||||||
| 53 | |||||||||||||||||||||
| 54 | |||||||||||||||||||||
| 55 | |||||||||||||||||||||
| 56 | |||||||||||||||||||||
| 57 | |||||||||||||||||||||
| 58 | |||||||||||||||||||||
| 59 | |||||||||||||||||||||
| 60 | |||||||||||||||||||||
| 61 | |||||||||||||||||||||
| 62 | |||||||||||||||||||||
| 63 | |||||||||||||||||||||
| 64 | |||||||||||||||||||||
| 65 | |||||||||||||||||||||
| 66 | |||||||||||||||||||||
| 67 | |||||||||||||||||||||
| 68 | |||||||||||||||||||||
| 69 | |||||||||||||||||||||
| 70 | |||||||||||||||||||||
| 71 |
Sheet2
Sheet3
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-B-0018-0002.docx | DOCX document | |
| FA4855-16-B-0014-0002.docx | DOCX document | |
| CZQZ160015-10-E101-Proposed_Elec.pdf | ||
| CZQZ160015-03-A101-Floor_Plan.pdf | ||
| Additional_Spec.pdf | ||
| CZQZ160015-04-A102-Roof_Plan.pdf | ||
| CZQZ160015-05-A201-Elevation_Plan.pdf | ||
| SOW-_CZQZ16-0015_Repair_Storm_Damage_B2379.docx | DOCX document | |
| Pre-Bid_Response.doc | DOC document | |
| Attachment_6_CAFB_Hardware_Specifications_Guideline-_2011.pdf | ||
| FA4855-16-B-0018-0001.pdf | ||
| Attachment_5_CAFB_Architectural_Compatibility_Guide-2012.pdf | ||
| Attachment_7_CAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf | ||
| Attachment_9_CAFB_Electrical_Standards-2016.pdf | ||
| Attachment_8_CAFB_Labeling_Standards__2009_Rev1.pptx | PPTX presentation | |
| FA4855-16-B-0018_Solicitation.pdf | ||
| Attachment_4_SOMS.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_2_Specs.pdf | ||
| Attachment_1_SOW.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .