CZQZ160015-05-A201-Elevation_Plan.pdf
PDF 2 MB Posted
- Attached to
- Repair Storm Damage Building 2379 Federal contract opportunity
- Solicitation number
- FA4855-16-B-0018
About this file
Elevation Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-B-0018-0002.docx | DOCX document | |
| FA4855-16-B-0014-0002.docx | DOCX document | |
| SOW-_CZQZ16-0015_Repair_Storm_Damage_B2379.docx | DOCX document | |
| Pre-Bid_Response.doc | DOC document | |
| CZQZ160015-10-E101-Proposed_Elec.pdf | ||
| CZQZ160015-03-A101-Floor_Plan.pdf | ||
| SOMS_Building_2379_Storm_Damage | — | |
| Additional_Spec.pdf | ||
| CZQZ160015-04-A102-Roof_Plan.pdf | ||
| Attachment_9_CAFB_Electrical_Standards-2016.pdf | ||
| Attachment_8_CAFB_Labeling_Standards__2009_Rev1.pptx | PPTX presentation | |
| Attachment_6_CAFB_Hardware_Specifications_Guideline-_2011.pdf | ||
| FA4855-16-B-0018-0001.pdf | ||
| Attachment_5_CAFB_Architectural_Compatibility_Guide-2012.pdf | ||
| Attachment_7_CAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf | ||
| FA4855-16-B-0018_Solicitation.pdf | ||
| Attachment_4_SOMS.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_2_Specs.pdf | ||
| Attachment_1_SOW.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA
NN
ON
A
FB
, N
EW
M
EX
IC
O
CI
VIL
E
NG
IN
EE
RIN
G
SQ
UA
DR
ON
OP
27 SOW
SP
27th
IAL
EC
W
IN
G
ERATION
SEQUENCE NO.
RE
VIS
IO
NS
DC HGFEA B
DC HGFEA B
OF
CA
NN
ON
A
IR
FO
RC
E
BA
SE
. C
LO
VIS
, C
UR
RY
C
OU
NT
Y, N
EW
M
EX
IC
O
SHEET NO.
S
PE
CI
AL
O
PE
RA
TI
ON
S
PR
OJ
EC
T
NU
MB
ER
CO
NC
EP
T
BY
DR
AW
N
BY
RE
VIE
WE
D
BY
RE
V
SY
MB
OL
CO
MM
EN
T
DE
SC
RIP
TIO
N
DA
TE
DA
TE
AP
PR
NO
T
FO
R
CO
NS
TR
UC
TI
ON
05 11
A-201
RP
R
ST
OR
M
DA
MA
GE
IN
Ju ly
AY
SO
N
AY
SO
N
CZ
QZ
E
LE
VA
TI
O N
P
LA
N
RP
A
LR
E
FA
CI
LIT
Y, B
SCALE:NOT TO SCALE
EAST ELEVATION1
SCALE:NOT TO SCALE
WEST ELEVATION2
SCALE:NOT TO SCALE
SOUTH ELEVATION3
SCALE:NOT TO SCALE
NORTH ELEVATION4
KEYED NOTES
REMOVE ALL OBSTRUCTION AROUND THE ENTIRE PERIMETER OF THE
STRUCTURE.
PRESSURE WASH ENTIRE PERIMETER OF THE BUILDING, ENSURING
BASE OF STRUCTURE IS ADEQUATELY PREP FOR SEALANT
APPLICATION.
APPLY SEALANT AROUND THE ENTIRE PERIMETER OF THE STRUCTURE
PER MANUFACTURE'S RECOMMENDED RATE OF APPLICATION.
APPLY SEALANT ON BOTH THE INSIDE AND OUTSIDE OF ALL EXTERIOR
WALLS INSIDE OF THE MAINTENANCE BAY (ROOM 101), TO ENSURE A
WATER-TIGHT SEAL.
REMOVE AND REPLACE EXISTING FOAM CLOSURE STRIP/SEALANT ON
THE METAL ROOF/ WALL PANEL INTERFACE AROUND THE ENTIRE
PERIMETER OF THE STRUCTURE.
1 2 3 4 5
1 2 3 4 5
1 2 3 4 5
Re vi ew ed a nd e di te d by
L t J es so p on
Ju ly
| Model |
| LOCATION PLAN |
File details come from the government source that posted it. Updated .