CZQZ160015-04-A102-Roof_Plan.pdf
PDF 132 KB Posted
- Attached to
- Repair Storm Damage Building 2379 Federal contract opportunity
- Solicitation number
- FA4855-16-B-0018
About this file
Roof Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-B-0018-0002.docx | DOCX document | |
| FA4855-16-B-0014-0002.docx | DOCX document | |
| SOW-_CZQZ16-0015_Repair_Storm_Damage_B2379.docx | DOCX document | |
| Pre-Bid_Response.doc | DOC document | |
| CZQZ160015-10-E101-Proposed_Elec.pdf | ||
| CZQZ160015-03-A101-Floor_Plan.pdf | ||
| SOMS_Building_2379_Storm_Damage | — | |
| Additional_Spec.pdf | ||
| CZQZ160015-05-A201-Elevation_Plan.pdf | ||
| Attachment_9_CAFB_Electrical_Standards-2016.pdf | ||
| Attachment_8_CAFB_Labeling_Standards__2009_Rev1.pptx | PPTX presentation | |
| Attachment_6_CAFB_Hardware_Specifications_Guideline-_2011.pdf | ||
| FA4855-16-B-0018-0001.pdf | ||
| Attachment_5_CAFB_Architectural_Compatibility_Guide-2012.pdf | ||
| Attachment_7_CAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf | ||
| FA4855-16-B-0018_Solicitation.pdf | ||
| Attachment_4_SOMS.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_2_Specs.pdf | ||
| Attachment_1_SOW.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
73'-8"
52'-4"
CA
NN
ON
A
FB
, N
EW
M
EX
IC
O
CI
VIL
E
NG
IN
EE
RIN
G
SQ
UA
DR
ON
OP
27 SOW
SP
27th
IAL
EC
W
IN
G
ERATION
SEQUENCE NO.
RE
VIS
IO
NS
DC HGFEA B
DC HGFEA B
OF
CA
NN
ON
A
IR
FO
RC
E
BA
SE
. C
LO
VIS
, C
UR
RY
C
OU
NT
Y, N
EW
M
EX
IC
O
SHEET NO.
S
PE
CI
AL
O
PE
RA
TI
ON
S
PR
OJ
EC
T
NU
MB
ER
CO
NC
EP
T
BY
DR
AW
N
BY
RE
VIE
WE
D
BY
RE
V
SY
MB
OL
CO
MM
EN
T
DE
SC
RIP
TIO
N
DA
TE
DA
TE
AP
PR
NO
T
FO
R
CO
NS
TR
UC
TI
ON
04 11
A-102
RP
R
ST
OR
M
DA
MA
GE
IN
Ju ly
AY
SO
N
AY
SO
N
CZ
QZ
R O
O F
PL
A
N
RP
A
LR
E
FA
CI
LIT
Y, B
SCALE:1/4" = 1'-0"
ROOF PLAN1
REMOVE EXISTING RIDGE CAP AND REPLACE WITH NEW RIDGE CAP IN
ORDER TO PROVIDE COMPLETE WEATHER-TIGHT SEAL. NEW RIDGE
CAP SHALL BE 22 GAUGE AND SHALL BE INSTALLED PER
MANUFACTURE'S RECOMMENDATION.
REMOVE EXISTING RAKE FLASHING ON THE NORTH AND SOUTH END
OF THE STRUCTURE AND REPLACE WITH NEW RAKE FLASHING TO
PROVIDE A WEATHER-TIGHT SEAL. NEW RAKE FLASHING SHALL BE 22
GAUGE AND SHALL BE INSTALLED PER MANUFACTURE'S
RECOMMENDATIONS.
REPLACE EXISTING GUTTER AND DOWNSPOUT SYSTEM ON THE EAST
AND WEST ENDS OF THE STRUCTURE. GUTTER/ DOWNSPOUT SYSTEM
SHALL BE 22 GAUGE AND SHALL BE INSTALLED PER MANUFACTURE'S
RECOMMENDATION.
INSTALL DRIP EDGE FLASHING ALONG THE ENTIRE LENGTH OF THE
GUTTER SYSTEM.
REMOVE AND REPLACE EXISTING PENETRATION FLASHING TO
ACHIEVE A WEATHER-TIGHT SEAL. NEW PENETRATION FLASHING
SHALL BE SPECIFICALLY FOR METAL ROOF USE.
DIRECT NEW DOWNSPOUT TO DRAIN TOWARDS EXISTING TRENCH
DRAIN ON THE NORTH END OF THE BUILDING
KEYED NOTES
Re vi ew ed a nd e di te d by
L t J es so p on
Ju ly
| Model |
| LOCATION PLAN |
File details come from the government source that posted it. Updated .