CZQZ160015-10-E101-Proposed_Elec.pdf
PDF 257 KB Posted
- Attached to
- Repair Storm Damage Building 2379 Federal contract opportunity
- Solicitation number
- FA4855-16-B-0018
About this file
Proposed Elec
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-B-0018-0002.docx | DOCX document | |
| FA4855-16-B-0014-0002.docx | DOCX document | |
| SOW-_CZQZ16-0015_Repair_Storm_Damage_B2379.docx | DOCX document | |
| Pre-Bid_Response.doc | DOC document | |
| CZQZ160015-03-A101-Floor_Plan.pdf | ||
| SOMS_Building_2379_Storm_Damage | — | |
| Additional_Spec.pdf | ||
| CZQZ160015-04-A102-Roof_Plan.pdf | ||
| CZQZ160015-05-A201-Elevation_Plan.pdf | ||
| Attachment_9_CAFB_Electrical_Standards-2016.pdf | ||
| Attachment_8_CAFB_Labeling_Standards__2009_Rev1.pptx | PPTX presentation | |
| Attachment_6_CAFB_Hardware_Specifications_Guideline-_2011.pdf | ||
| FA4855-16-B-0018-0001.pdf | ||
| Attachment_5_CAFB_Architectural_Compatibility_Guide-2012.pdf | ||
| Attachment_7_CAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf | ||
| FA4855-16-B-0018_Solicitation.pdf | ||
| Attachment_4_SOMS.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_2_Specs.pdf | ||
| Attachment_1_SOW.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
T
M
M
MDP
SS-1
SSC-1
MDP
MDP
SWB-1
CA
NN
ON
A
FB
, N
EW
M
EX
IC
O
CI
VIL
E
NG
IN
EE
RIN
G
SQ
UA
DR
ON
OP
27 SOW
SP
27th
IAL
EC
W
IN
G
ERATION
SEQUENCE NO.
RE
VIS
IO
NS
DC HGFEA B
DC HGFEA B
OF
CA
NN
ON
A
IR
FO
RC
E
BA
SE
. C
LO
VIS
, C
UR
RY
C
OU
NT
Y, N
EW
M
EX
IC
O
SHEET NO.
S
PE
CI
AL
O
PE
RA
TI
ON
S
PR
OJ
EC
T
NU
MB
ER
CO
NC
EP
T
BY
DR
AW
N
BY
RE
VIE
WE
D
BY
RE
V
SY
MB
OL
CO
MM
EN
T
DE
SC
RIP
TIO
N
DA
TE
DA
TE
AP
PR
NO
T
FO
R
CO
NS
TR
UC
TI
ON
10 11
E-101
RP
R
ST
OR
M
DA
MA
GE
IN
Ju ly
AY
SO
N
CZ
QZ
PR
O
PO
S
E D
E
LE
C
TR
IC
A
L
PL
A N
RP
A
LR
E
FA
CI
LIT
Y, B
SCALE:1/8" = 1'-0"
ENLARGED PLAN - MEP1
FEATURES: 1-(LUMINAIRE)
LAMP TYPE: 250W INDUCTION LAMPS
PROFILE: 1 LAMP
SHIELDING: 5 mm (3/16") CLEAR
POLYCORBONATE
REFLECTOR: FACETED SPECULAR
ALUMINUM
BALLAST: HIGH POWER FACTOR,
CORE & COIL, CWA
OPTIONS: PROVIDE MOUNTING HARDWARE FOR LUMINAIRE
LAMP TYPE: INDUCTION: 250W
OTHER: TYPE III, DISTRIBUTIONS.
GENERAL DESCRIPTION
HOUSING: ONE PIECE EXTRUDED ALUMINUM, WELDED JOINTS. LENS HINGED &
HELD IN PLACE BY CAPTIVE SCREWS.
ELECTRICAL: COORDINATE BALLAST VOLTAGE WITH NEW TRANSFORMER AND LOAD CENTER PROVIDED.
FINISH: FIXTURE MOUNTING ARM, HOUSING, DOOR FRAMES, POLE & BASE TO
BE PAINTED TO MATCH EXISTING POLE.
TYPE:
IA TYPE III(ROADWAY)
MFR: EVERALST ESB EC 250W OR EQUAL
10 YEAR MFR WARRANTY
MOUNTING: EXTRUDED MOUNTING ARM FOR 25' RTS POLE
OTHER: FURNISH AND INSTALL NEW BRACKETS FOR EXISTING 25'
RTS POLE ON EXISTING FOOTING.
P A
P
BM
D
P
MECHANICAL ROOMMUTI-USE ROOMEXTERIOR
JJJ
OU-1
IU-1
MM
E
E
EUC TO T-2327
EXISTING DEMAND 75KVA X 1.25 = 117KVA
NEW DEMAND COOLING 12KVA
NEW DEMAND COOLING 10kW
COOLING LOADS HIGHER12KVA
EXISTING NEW SPECIAL PURPOSE RECEPTACLES WERE
CONNECTED TO MEET NFPA 70 REQUIREMENTS AND DID
NOT ADD TO THE EXISTING DEMAND LOADS.
#8#8
TO THERMOSTAT
4160Y/2400- 208Y/120V
200KVA
WP
129KVA = 357A @208Y/120V 3PH 4 W
THE EXISTING 600AMP SERVICE IS ADEQUATE.
EXISTING
NEW-WORK ELECTRICAL GENERAL NOTES:
NEW WORK ELECTRICAL KEYED NOTES:
NEW TYPE IA FIXTURES ON EXISTING POLE AS INDICATED ON DETAIL 2. REPLACE
EXISTING ARM BRACKETS AND PROVIDE NEW BRACKETS AS REQUIRED FOR
INSTALLATION OF NEW LUMINARIES. ENSURE POLE MOUNTING AND MEETS UFC
3-301-01 WIND LOAD SPECIFICATIONS.
NEW 15KVA, BUCK BOOST TRANSFORMER SUSPENDED FROM STRUCTURE WITH
ALL THREAD AND GALVANIZED METAL FRAMING RACK 208Y/120V - 240/120V
SIMILIAR TO GE 9T51B0152, WITH PRIMARY AND SECONDARY FUSING. SET TAP TO
250V.
NEW 240VOLT 1PH NEMA 1 30AF SWITCHES MOUNT ON GALVANIZED METAL
FRAMING RACK. PROVIDE NEW FUSES FOR CONNECTING OWNER FURNISHED
SPECIAL PURPOSE NEMA L6-30 RECEPTACLE.
ASTRONOMICAL TIME SWITCH MECH HELD ELCTRONIC OPERATION 208V, 20AMP
2P, NEMA-3R. PHOTOCELL ON/TIME SWITCH OFF.
EXISTING 600AMP/120Y/208 3P 4W PANEL TO REMAIN. PROVIDE 2- NEW GE TYPE
TEY 60/3P CIRCUIT BREAKERS FOR NEW BUCK BOOST TRANSFORMER AND HVAC
EQUIPMENT. CONNECT WITH 3#6,#10GND IN 1"C. ROUTE IN PLENUM AND
CONCEALED WHERE POSSIBLE.
CONNECT WITH 3#6,#10GND IN 1"C. ROUTE IN PLENUM AND CONCEALED WHERE
POSSIBLE.
NEW 240VOLT 3PH NEMA 1 60AF SWITCHES MOUNT ON GALVANIZED METAL
FRAMING RACK FOR BUCK BOOST PRIMARY.
CONNECT WITH 2#6,#10GND IN 1"C RGS
CONNECT WITH 2#10,#10GND IN 3/4"C RGS FOR NEW OWNER FURNISHED L30-6
RECEPTACLE. MOUNT RECEPTACLE AT 24" AFG U.O.N.
NEW 240VOLT 3PH NEMA 1 60AF SWITCHES MOUNT ON GALVANIZED METAL
FRAMING RACK FOR BUCK BOOST PRIMARY.
EXISTING SLAB ON GRADE.COORDINATE EXACT GROUNDING LOCATION ON
SITE.
NEW 240/3P 3 WIRE 60AF NEMA 1 DISCONNECT SWITCHES FOR HVAC
EQUIPMENT. HVAC SYSTEM INSTALLER TO PROVIDE CONTROLS SUCH PER
MECHANICAL SCHEDULE. HEATER AND COOLING SHALL NOT OPERATE AT THE
SAME TIME.CONNECT WITH 3#6,#10GND IN 1"C RGS U.O.N. COORDINATE WITH
M.F.R. INSTALLTION INSTRUCTIONS. PROVIDE 1" CONTROLS CONDUIT WITH
2#12 CONDUCTORS BETWEEN HVAC EQUIPMENT AND THERMOSTAT.
NEW 240/3P 3 WIRE 60A NF NEAM 3R DISCONNECT SWITCH FOR HVAC
EQUIPMENT. HVAC SYSTEM INSTALLER TO PROVIDE CONTROLS SUCH PER
MECHANICAL SCHEDULE. HEATER AND COOLING SHALL NOT OPERATE AT THE
SAME TIME.CONNECT WITH 3#6,#10GND IN 1"C RGS U.O.N. COORDINATE WITH
M.F.R. INSTALLTION INSTRUCTIONS. PROVIDE 1" CONTROLS CONDUIT WITH
2#12 CONDUCTORS BETWEEN HVAC EQUIPMENT AND THERMOSTAT.
ELECTRICAL AND HVAC CONNECTIONS SEE MECHANICAL PLANS FOR ACTUAL
LOCATIONS AND ELECTRICAL RISER DIAGRAM FOR DETAILS.
RELOCATE EXISTING 120V LAMP AND MODIFY SWITCH AND CIRCUIT AS
REQUIRED FOR INSTALLTION OF NEW CEILING GRID IN THIS AREA.
1. REFERENCE SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL ELECTRICAL
REQUIREMENTS.
2. EXISTING PANELBOARDS TO REMAIN. PROVIDE NEW CIRCUIT BREAKERS AS
INDICATED. ROUTE ALL BRANCH CIRCUITS CIRCUITS IN MIN 3/4" EMT IN PLENUM
SPACE AND PROPERLY SUPPORT PER NFPA 70 REQUIREMENTS. ETERIOR BRANCH
CIRCUITS SHALL BE MIN 3/4" RGS. U.O.N. BALANCE LOADS AS PRACTICLE AND
PROVIDE UPDATED PANEL SCHEDULES.
3. MINIMUM WIRING DEVICE BRANCH CIRCUIT SHALL BE 2#10,#10 GND IN 3/4" C
U.O.N.
4. EXTERIOR ELECTRICAL DEVICES SHALL BE NEMA 3R RATED.
SCALE:N.T.S.
ELECTRICAL ONE-LINE NEW WORK3
SCALE:N.T.S.
INDUCTION CUTOFF LUMINAIRE
POLE MOUNTED
Re vi ew ed a nd e di te d by
L t J es so p on
Ju ly
| Model |
| LOCATION PLAN |
File details come from the government source that posted it. Updated .