CZQZ160015-10-E101-Proposed_Elec.pdf

PDF 257 KB Posted

Attached to
Repair Storm Damage Building 2379 Federal contract opportunity
Solicitation number
FA4855-16-B-0018
Issued by
Department of the Air Force Special Operations Command

About this file

Proposed Elec

View the file

Other files for this federal contract opportunity

Other files attached to Repair Storm Damage Building 2379, newest first.
File Type Posted
FA4855-16-B-0018-0002.docx DOCX document
FA4855-16-B-0014-0002.docx DOCX document
SOW-_CZQZ16-0015_Repair_Storm_Damage_B2379.docx DOCX document
Pre-Bid_Response.doc DOC document
CZQZ160015-03-A101-Floor_Plan.pdf PDF
SOMS_Building_2379_Storm_Damage —
Additional_Spec.pdf PDF
CZQZ160015-04-A102-Roof_Plan.pdf PDF
CZQZ160015-05-A201-Elevation_Plan.pdf PDF
Attachment_9_CAFB_Electrical_Standards-2016.pdf PDF
Attachment_8_CAFB_Labeling_Standards__2009_Rev1.pptx PPTX presentation
Attachment_6_CAFB_Hardware_Specifications_Guideline-_2011.pdf PDF
FA4855-16-B-0018-0001.pdf PDF
Attachment_5_CAFB_Architectural_Compatibility_Guide-2012.pdf PDF
Attachment_7_CAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf PDF
FA4855-16-B-0018_Solicitation.pdf PDF
Attachment_4_SOMS.pdf PDF
Attachment_3_Drawings.pdf PDF
Attachment_2_Specs.pdf PDF
Attachment_1_SOW.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

T

M

M

MDP

SS-1

SSC-1

MDP

MDP

SWB-1

CA

NN

ON

A

FB

, N

EW

M

EX

IC

O

CI

VIL

E

NG

IN

EE

RIN

G

SQ

UA

DR

ON

OP

27 SOW

SP

27th

IAL

EC

W

IN

G

ERATION

SEQUENCE NO.

RE

VIS

IO

NS

DC HGFEA B

DC HGFEA B

OF

CA

NN

ON

A

IR

FO

RC

E

BA

SE

. C

LO

VIS

, C

UR

RY

C

OU

NT

Y, N

EW

M

EX

IC

O

SHEET NO.

S

PE

CI

AL

O

PE

RA

TI

ON

S

PR

OJ

EC

T

NU

MB

ER

CO

NC

EP

T

BY

DR

AW

N

BY

RE

VIE

WE

D

BY

RE

V

SY

MB

OL

CO

MM

EN

T

DE

SC

RIP

TIO

N

DA

TE

DA

TE

AP

PR

NO

T

FO

R

CO

NS

TR

UC

TI

ON

10 11

E-101

RP

R

ST

OR

M

DA

MA

GE

IN

Ju ly

AY

SO

N

CZ

QZ

PR

O

PO

S

E D

E

LE

C

TR

IC

A

L

PL

A N

RP

A

LR

E

FA

CI

LIT

Y, B

SCALE:1/8" = 1'-0"

ENLARGED PLAN - MEP1

FEATURES: 1-(LUMINAIRE)

LAMP TYPE: 250W INDUCTION LAMPS

PROFILE: 1 LAMP

SHIELDING: 5 mm (3/16") CLEAR

POLYCORBONATE

REFLECTOR: FACETED SPECULAR

ALUMINUM

BALLAST: HIGH POWER FACTOR,

CORE & COIL, CWA

OPTIONS: PROVIDE MOUNTING HARDWARE FOR LUMINAIRE

LAMP TYPE: INDUCTION: 250W

OTHER: TYPE III, DISTRIBUTIONS.

GENERAL DESCRIPTION

HOUSING: ONE PIECE EXTRUDED ALUMINUM, WELDED JOINTS. LENS HINGED &

HELD IN PLACE BY CAPTIVE SCREWS.

ELECTRICAL: COORDINATE BALLAST VOLTAGE WITH NEW TRANSFORMER AND LOAD CENTER PROVIDED.

FINISH: FIXTURE MOUNTING ARM, HOUSING, DOOR FRAMES, POLE & BASE TO

BE PAINTED TO MATCH EXISTING POLE.

TYPE:

IA TYPE III(ROADWAY)

MFR: EVERALST ESB EC 250W OR EQUAL

10 YEAR MFR WARRANTY

MOUNTING: EXTRUDED MOUNTING ARM FOR 25' RTS POLE

OTHER: FURNISH AND INSTALL NEW BRACKETS FOR EXISTING 25'

RTS POLE ON EXISTING FOOTING.

P A

P

BM

D

P

MECHANICAL ROOMMUTI-USE ROOMEXTERIOR

JJJ

OU-1

IU-1

MM

E

E

EUC TO T-2327

EXISTING DEMAND 75KVA X 1.25 = 117KVA

NEW DEMAND COOLING 12KVA

NEW DEMAND COOLING 10kW

COOLING LOADS HIGHER12KVA

EXISTING NEW SPECIAL PURPOSE RECEPTACLES WERE

CONNECTED TO MEET NFPA 70 REQUIREMENTS AND DID

NOT ADD TO THE EXISTING DEMAND LOADS.

#8#8

TO THERMOSTAT

4160Y/2400- 208Y/120V

200KVA

WP

129KVA = 357A @208Y/120V 3PH 4 W

THE EXISTING 600AMP SERVICE IS ADEQUATE.

EXISTING

NEW-WORK ELECTRICAL GENERAL NOTES:

NEW WORK ELECTRICAL KEYED NOTES:

NEW TYPE IA FIXTURES ON EXISTING POLE AS INDICATED ON DETAIL 2. REPLACE

EXISTING ARM BRACKETS AND PROVIDE NEW BRACKETS AS REQUIRED FOR

INSTALLATION OF NEW LUMINARIES. ENSURE POLE MOUNTING AND MEETS UFC

3-301-01 WIND LOAD SPECIFICATIONS.

NEW 15KVA, BUCK BOOST TRANSFORMER SUSPENDED FROM STRUCTURE WITH

ALL THREAD AND GALVANIZED METAL FRAMING RACK 208Y/120V - 240/120V

SIMILIAR TO GE 9T51B0152, WITH PRIMARY AND SECONDARY FUSING. SET TAP TO

250V.

NEW 240VOLT 1PH NEMA 1 30AF SWITCHES MOUNT ON GALVANIZED METAL

FRAMING RACK. PROVIDE NEW FUSES FOR CONNECTING OWNER FURNISHED

SPECIAL PURPOSE NEMA L6-30 RECEPTACLE.

ASTRONOMICAL TIME SWITCH MECH HELD ELCTRONIC OPERATION 208V, 20AMP

2P, NEMA-3R. PHOTOCELL ON/TIME SWITCH OFF.

EXISTING 600AMP/120Y/208 3P 4W PANEL TO REMAIN. PROVIDE 2- NEW GE TYPE

TEY 60/3P CIRCUIT BREAKERS FOR NEW BUCK BOOST TRANSFORMER AND HVAC

EQUIPMENT. CONNECT WITH 3#6,#10GND IN 1"C. ROUTE IN PLENUM AND

CONCEALED WHERE POSSIBLE.

CONNECT WITH 3#6,#10GND IN 1"C. ROUTE IN PLENUM AND CONCEALED WHERE

POSSIBLE.

NEW 240VOLT 3PH NEMA 1 60AF SWITCHES MOUNT ON GALVANIZED METAL

FRAMING RACK FOR BUCK BOOST PRIMARY.

CONNECT WITH 2#6,#10GND IN 1"C RGS

CONNECT WITH 2#10,#10GND IN 3/4"C RGS FOR NEW OWNER FURNISHED L30-6

RECEPTACLE. MOUNT RECEPTACLE AT 24" AFG U.O.N.

NEW 240VOLT 3PH NEMA 1 60AF SWITCHES MOUNT ON GALVANIZED METAL

FRAMING RACK FOR BUCK BOOST PRIMARY.

EXISTING SLAB ON GRADE.COORDINATE EXACT GROUNDING LOCATION ON

SITE.

NEW 240/3P 3 WIRE 60AF NEMA 1 DISCONNECT SWITCHES FOR HVAC

EQUIPMENT. HVAC SYSTEM INSTALLER TO PROVIDE CONTROLS SUCH PER

MECHANICAL SCHEDULE. HEATER AND COOLING SHALL NOT OPERATE AT THE

SAME TIME.CONNECT WITH 3#6,#10GND IN 1"C RGS U.O.N. COORDINATE WITH

M.F.R. INSTALLTION INSTRUCTIONS. PROVIDE 1" CONTROLS CONDUIT WITH

2#12 CONDUCTORS BETWEEN HVAC EQUIPMENT AND THERMOSTAT.

NEW 240/3P 3 WIRE 60A NF NEAM 3R DISCONNECT SWITCH FOR HVAC

EQUIPMENT. HVAC SYSTEM INSTALLER TO PROVIDE CONTROLS SUCH PER

MECHANICAL SCHEDULE. HEATER AND COOLING SHALL NOT OPERATE AT THE

SAME TIME.CONNECT WITH 3#6,#10GND IN 1"C RGS U.O.N. COORDINATE WITH

M.F.R. INSTALLTION INSTRUCTIONS. PROVIDE 1" CONTROLS CONDUIT WITH

2#12 CONDUCTORS BETWEEN HVAC EQUIPMENT AND THERMOSTAT.

ELECTRICAL AND HVAC CONNECTIONS SEE MECHANICAL PLANS FOR ACTUAL

LOCATIONS AND ELECTRICAL RISER DIAGRAM FOR DETAILS.

RELOCATE EXISTING 120V LAMP AND MODIFY SWITCH AND CIRCUIT AS

REQUIRED FOR INSTALLTION OF NEW CEILING GRID IN THIS AREA.

1. REFERENCE SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL ELECTRICAL

REQUIREMENTS.

2. EXISTING PANELBOARDS TO REMAIN. PROVIDE NEW CIRCUIT BREAKERS AS

INDICATED. ROUTE ALL BRANCH CIRCUITS CIRCUITS IN MIN 3/4" EMT IN PLENUM

SPACE AND PROPERLY SUPPORT PER NFPA 70 REQUIREMENTS. ETERIOR BRANCH

CIRCUITS SHALL BE MIN 3/4" RGS. U.O.N. BALANCE LOADS AS PRACTICLE AND

PROVIDE UPDATED PANEL SCHEDULES.

3. MINIMUM WIRING DEVICE BRANCH CIRCUIT SHALL BE 2#10,#10 GND IN 3/4" C

U.O.N.

4. EXTERIOR ELECTRICAL DEVICES SHALL BE NEMA 3R RATED.

SCALE:N.T.S.

ELECTRICAL ONE-LINE NEW WORK3

SCALE:N.T.S.

INDUCTION CUTOFF LUMINAIRE

POLE MOUNTED

Re vi ew ed a nd e di te d by

L t J es so p on

Ju ly

Model
LOCATION PLAN

File details come from the government source that posted it. Updated .