Attch 3 CDRL A004 Program Mgmt Plan draft.pdf

PDF 55 KB Posted

Attached to
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation number
FA461027R0001
Issued by

About this file

The document provided is a corrupted or improperly rendered PDF file containing only Adobe Reader error messaging and troubleshooting instructions. No substantive contract opportunity information, solicitation details, statement of work, or procurement-related content is present. The file does not contain analyzable contract data and cannot be summarized for procurement details.

View the file

Other files

File Type Posted
FRAME Industry Day Brief.pptx PPTX presentation
FRAME Industry Day CRM 20261008.xlsx XLSX spreadsheet
FRAME RFP_GFP List_07Oct2026.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equip Usage Draft.pdf PDF
Attch 5 CBA IBEW 2024 12949 Appdx A redacted.pdf PDF
Attch 3 CDRL A017 Quality Mgmt Plan Draft.pdf PDF
Attch 7 SCA WD 2015-5637 (Rev 34).pdf PDF
Attch 3 CDRL A019 HMMP Report - Draft.pdf PDF
Attch 3 CDRL A002 Phase-Out Plan Draft.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Booklet Draft.pdf PDF
Attch 3 CDRL A026 Corr Prev Ctl Plan draft.pdf PDF
Attch 3 CDRL A015 Work Order Status Rpt Draft.pdf PDF
Attch 3 CDRL A028 Weekly MR Schedule Draft.pdf PDF
Attch 5 Appendix B Wage Rate Tables redacted.pdf PDF
Attch 3 CDRL A013 Accident Incdt Rpt Draft.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draft.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6).pdf PDF
Attch 10 CRM Template - draft.xlsx XLSX spreadsheet
Attch 3 CDRL A014 PE Resp List - Draft.pdf PDF
Attch 2 Apdx J Antenna Tower Resp List draft.docx DOCX document
Attch 2 Apdx H Environmental Reqs - draft.docx DOCX document
Attch 2 Apdx I PE Inventory - draft.xlsx XLSX spreadsheet
RFI Atch 4 Bldg 8500 Map.pptx PPTX presentation
Attch 3 CDRL A020 Asbestos Lead Abatemt Draft.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draft.pdf PDF
Attch 3 CDRL A008 GFP GFM Inv Rpt Draft.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29).pdf PDF
Attch 7 SCA WD 1986-0431 (Rev 68).pdf PDF
Attch 9 Section M - draft.docx DOCX document
Attch 3 CDRL A005 Program Mgmt Review Draft.pdf PDF
Attch 3 Consolidated DID Files draft.pdf PDF
Attch 3 CDRL A025 RCM Plan - Draft.pdf PDF
Attch 2 Appendix K L M N - draft.xlsx XLSX spreadsheet
Attch 1 FRAME PWS - draft.docx DOCX document
RFI Atch 3 Map to Bldg 8500.png PNG image
Attch 3 CDRL A024 Facility Asses Rpt Draft.pdf PDF
Attch 3 CDRL A022 Backflow Prev Sys Rpt Draft.pdf PDF
Attch 4 FRAME Incentive Plan - Draft.docx DOCX document
Attch 6 DB WD CA20260014 (Mod 5).pdf PDF
Attch 8 Section L - draft.docx DOCX document
Attch 3 CDRL A016 Daily MR Schedule Draft.pdf PDF
Attch 3 CDRL A018 Solid Waste Report - Draft.pdf PDF
Attch 3 CDRL A003 Data Management Plan Draft.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draft.pdf PDF
RFI Atch 1 Industry Day Agenda_22-23 September 2026.pdf PDF
Atch 4 Bldg 8500 Map.pptx PPTX presentation
Atch 3 Map to Bldg 8500.png PNG image
Atch 2 FRAME PWS - Draft (20260827).pdf PDF
Atch 1 Industry Day Agenda_22-23 September 2026.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of (Updated 20250617)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of (Updated 20250617)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List" delete continuation

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
A. CONTRACT LINE ITEM NUMBER:
exhibit:
C. CATEGORY: Select for "TDP.": 0
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 1
C. CATEGORY: Enter specification for "Other.": MGMT
System: Facility Readiness and Maintenance Execution
ContractNum:
Contractor:
1. DATA ITEM NUMBER: A004
titleDataItem: Program Management Plan (PMP)
subtitle: Program Management Plan
4. AUTHORITY (Data Acquisition Document Number): N/A
contractRef: PWS 2.1.3; 2.3.9
reqOffice: SLD 30/PM
7. DD 250 REQUIREMENT: N/A
8. APPROVAL CODE : A
9. DISTRIBUTION STATEMENT REQUIRED: D
freq: ONE/R
asOfDate: N/A
dateFirstSub: 60 DAC
dateSubseqSub: ASREQ
16. REMARKS: CDRL content:

1. General Format & Submittal: The risk-based Program Management Plan (PMP) shall be delivered electronically in standard, searchable PDF and Microsoft Word/Excel formats. The document must be sequentially numbered with an active Table of Contents.

2. Mandatory Content Requirements:

The PMP shall contain the following information:

SECTION I: INTRODUCTION AND MANAGEMENT APPROACH

- Purpose of the PMP and the contractor’s approach to delivering responsive, flexible, integrated, and customer-focused services in support of the Space Force mission, coordinated with SLD 30.

SECTION II: PROGRAM ORGANIZATION

- Organizational chart and narrative showing program office structure, lines of authority, reporting relationships, and interfaces with SLD 30/PM, 30 CONS, CORs, and key stakeholders. Detail shall be sufficient to show how the contractor will organize and manage contract performance.

- Roles, responsibilities, and authorities of management positions.

SECTION III: CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)

- Complete CWBS with description of each element and mapping to PWS sections and CLINs.

SECTION IV: WORK CONTROL AND EXECUTION

- End-to-end work control process (receive, prioritize, plan, schedule, execute, inspect, archive).

- How the contractor will implement the Emergency, Urgent, and Routine categories defined in the PWS and Service Summary.

SECTION V: MISSION SUPPORT PROCESSES

- Launch Readiness Process (PWS 2.1.4).

- Customer and Range coordination processes, including advance coordination with users and Range Scheduling (2 ROPS/DOS), customer communication, and participation in MFTs, PMRs, and other required meetings.

- Approach to scheduling and coordinating maintenance and repair work, including prioritization against mission requirements, integration with Range schedules, and production of the daily and weekly schedules required by the contract.

SECTION VI: TASK ORDER AND SUBCONTRACTOR MANAGEMENT

- Approach to developing, proposing, executing, and closing Task Orders.

- Teaming agreements, joint ventures, and major subcontractors; organizational relationships and authorities; subcontract administration, clause flow-down, and performance evaluation.

SECTION VII: RISK MANAGEMENT

- Contractor’s risk-based approach and processes for identifying, assessing, mitigating, and tracking program, technical, schedule, and cost risks.

Click to add continuation field for Remarks:
14. DISTRIBUTION - a. ADDRESSEE, new line: SLD 30/PM
15.TOTAL - Total draft copies is automatically calculated.: 0
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final reproducible copies is automatically calculated.: 0
priceGrp:
estTotalPrice:
remarks:

SECTION VIII: CONTINUITY OF OPERATIONS, LABOR STRIKE, AND CONTINGENCY PLANNING

- Procedures to prevent or minimize interruptions from union disputes, strikes, or labor stoppages.

- Communications with the Contracting Officer and law enforcement for picketing or labor-related incidents.

- High-level contingency plans for operational disruptions, resource shortages, and mission surges.

(Note: Mission Essential personnel continuity is covered in the separate Mission Essential Plan.)

SECTION IX: PROPERTY MANAGEMENT

- Property Management System approach for GFP, GFE, CAP, and GFM.

- Inventory, accountability, use, disposition, and LTDD reporting in accordance with applicable property clauses.

- Detailed desk-level procedures shall be maintained in the contractor’s internal system and made available for Government review.(Note: This section serves as the property management description in the absence of a separate Property Management Plan CDRL.)

Block 8: The Government will have fifteen (15) business days to review the initial submission of the PMP and provide comments. The Contractor shall address all comment, incorporate the need information, and submit the final version within ten (10) business days of receiving Government feedback. If USG comments are not received in this time period then the contractor must request guidance from the SLD 30/PM for disposition actions.

Block 13: Updates required only when significant changes occur, as determined by the Contractor or the Government, to program management processes or methodology.

Block 14a: All submissions in electronic format ONLY shall be delivered to the SLD 30/PM via e-mail to: SLD30.PM.FRAME@spaceforce.mil and appropriate stakeholders.

preparedBy:
J. SIGNATURE: H. SIGNATURE
J. SIGNATURE: J. SIGNATURE
J. SIGNATURE:
approvedBy:
Click to add additional data items.:
Click to delete additional data items.:

File details come from the government source that posted it. Updated .