26_-_Atch_12 _Sample_TA_Statement_of_Work_(SOW)_7_26_16.pdf

PDF 18 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-15-R-0002
Issued by

About this file

Atch 12 TA SOW Template

View the file

Other files

File Type Posted
Released_ _Signed_FA4610-15-R-0002_Amend_0003.pdf PDF
FA4610-15-R-0002_Amend_0003.pdf PDF
8_-_Amend_0002_list_of_changes_9_26_16_R2.pdf PDF
6_-_Appendix_N_Equipment_List_for_Appendix_A_Bldgs_9_26_16.xlsx XLSX spreadsheet
7_-_3 _CDRL_A025_RCM_Plan.pdf PDF
2_-_0_RFP_Sol_FA4610-15-R-0002_9_26_16_Amend_0002.pdf PDF
7_-_2 _CDRL_A011_Quality_Management_Plan.pdf PDF
2_-_1_Sec_L_M _26_Sep_16.pdf PDF
8_-_Amend_0002_list_of_changes_9_26_16.pdf PDF
7_-_1 _CDRL_A009_Program_Management_Plan.pdf PDF
5_-_Appendix_I_-_Service_Summary_Items_ _Objectives.pdf PDF
4_-_Appendix_A_-_Building_Listing_13Sept16.xlsx XLSX spreadsheet
9_-_Atch_10 _DB_WD_CA1600023_(Rev_12).pdf PDF
1_-_Amendment_0002.pdf PDF
7_-_5 _CDRL_A008_P_E_Responsibility_List.pdf PDF
3_-_Atch_1__LOSC_PWS_9_27_16.pdf PDF
7_-_4 _CDRL_A029_System_Safety_Program_Plan.pdf PDF
QAs_LOSC_Ind_day_26_Sep_16_final.pdf PDF
26_-_Bidders_Library _Crane_Hook_Inspections_3.pdf PDF
25_-_Bidders_Library _Crane_Hook_Inspections_2.pdf PDF
24_-_Bidders_Library _Crane_Hook_Inspections_1.pdf PDF
27_-_Bidders_Library _Crane_Hook_Inspections_4.pdf PDF
1_-_List_of_Changes_to_L_M_9_13_16.pdf PDF
2_-_List_of_Changes_to_the_PWS_9_13_16.pdf PDF
23_-_LOSC_Industry_Day_Slides_18_Aug_16.pdf PDF
18_-_Atch_9 _CBA_WD_2005-3169 _2_pgs.pdf PDF
14_-_Atch_10 _DB_WD_CA160023 _rev_10.pdf PDF
5_-_Appendix_C _D _E _F _G.xlsx XLSX spreadsheet
20_-_Bidders_Library_LOSC_Workload_Data_r1.xlsx XLSX spreadsheet
1_-_Amend_0001_FA4610-15-R-0002.pdf PDF
7_-_Appendix_J_-_MDA_Launch_Communication_Systems.xlsx XLSX spreadsheet
12_-_Amendment_0001 _Atch_2 _CDRLs _A003 _A008 _A009 _A011 _A025_A029.pdf PDF
19_-_Atch_10 _DB_WD_CA160023 _rev_10.pdf PDF
22_-_Appendix_A_-_Building_Listing_13Sept16.xlsx XLSX spreadsheet
15_-_Atch_14 _LOSC_QASP_19_Aug_16_fixed_pg_numbers.pdf PDF
3_-_Atch_1_DRAFT_LOSC_PWS_9_12_16.pdf PDF
16_-_Atch_9 _CBA _2005-3169 _with_Appendix_A _51_pgs _redacted.pdf PDF
4_-_Appendix_B_-_Equip_List_Other_Than_Appendix_A_Bldgs.xlsx XLSX spreadsheet
21_-_Bidders_Library _LOSC _Boiler_PMI_-_PM040024.pdf PDF
10_-_Appendix_N_Equipment_List_for_Appendix_A_Bldgs.xlsx XLSX spreadsheet
17_-_Atch_9 _APPENDIX_B_-_Wage_Rate_Tables_(2014-2019)_Redacted _2_pgs.pdf PDF
List_of_Documents_posted_to_FBO_Solicitation.pdf PDF
13-1 _Amendment_0001 _Atch_4 _LOSC_DD254_Continuation_Page.pdf PDF
9_-_Appendix_M_Real_Property_Report.xlsx XLSX spreadsheet
2_-1 _Sec_L_M_12_Sep_16_lh_ntc_r2.pdf PDF
8_-_Appendix_L_-_Government_Furnished_Equipment.xlsx XLSX spreadsheet
13_-_Amendment_0001 _Atch_4 _LOSC_Solicitation_FA4610-15-R-0002_DD254_7Sep16.pdf PDF
11_-_Appendix_O_-_Glossary.pdf PDF
2_-_Final_RFP_Solicitation_FA4610-15-R-0002_12_Sep_16.pdf PDF
6_-_Appendix_I_-_Service_Summary_Items_Objectives.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOSC Contract Number FA4610-16-C-XXXX

DATE

STATEMENT OF WORK (SOW)

For

ORGANIZATIONAL NAME

On

VANDENBERG AIR FORCE BASE, CALIFORNIA

Specifically

TAXXXX: Title of your request

1.0 BACKGROUND

Required section

2.0 SCOPE

Required section

3.0 PERIOD OF PERFORMANCE

3.1 Do not use specific dates if avoidable. Specific dates will require a revision if unobtainable.

Use 12 months, 90 days, …. from Authority to Proceed (ATP).

4.0 COST DATA

Not required

4.1 COST DATA is a mandate as part of the basic contract. Only unusual or specific user requirements should be included in this section.

5.0 TECHNICAL INTERCHANGE MEETINGS

Should be included

5.1 TIMs are scheduled by the contractor or requested by the customer when project problems require them, and for closeout/final walkdown.

5.2 Only include special requirements other than these. Examples are a TIM after completion of a specific milestone, or mid project, or upon receipt of IA accreditation, etc.

6.0 REQUIREMENTS

7.0 TRAINING

N/A unless required.

8.0 TESTING

Should be included

8.1 Testing is normally a part of install to verify that the system operates, meets the needs of the customer, and performs per specification.

8.2 Only include your requirements that are above and beyond this “normal” testing. Could include specific data that you want transmitted and verified, achieve a specific transfer rate, obtain specific data charts, etc.

9.0 VANDENBERG GOVERNMENT POINT OF CONTACT

The primary Project Manager for this effort is Mr. John Doe, YOUR UNIT, (805) YOUR PHONE, YOUR EMAIL@vandenberg.af.mil

The primary government Program Manager for this SOW is Mr. Casey Linehan,

(805) 606-3054, email: Casey.Linehan@us.af.mil.

The secondary government Program Manager for this SOW is Ms. Sharon Hedman,

(805) 606-2784, email: Sharon.Hedman@us.af.mil.

mailto:YOUR%20EMAIL@vandenberg.af.mil mailto:Casey.Linehan@us.af.mil mailto:Sharon.Hedman@us.af.mil

LOSC Contract Number FA4610-16-C-XXXX
DATE
STATEMENT OF WORK (SOW)
For
ORGANIZATIONAL NAME
On
VANDENBERG AIR FORCE BASE, CALIFORNIA
Specifically

File details come from the government source that posted it. Updated .