7_-_4 _CDRL_A029_System_Safety_Program_Plan.pdf

PDF 191 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-15-R-0002
Issued by

About this file

Amend 0002 7 - 4 Atch 2 CDRL A029

View the file

Other files

File Type Posted
2_-_1_Sec_L_M _26_Sep_16.pdf PDF
9_-_Atch_10 _DB_WD_CA1600023_(Rev_12).pdf PDF
7_-_3 _CDRL_A025_RCM_Plan.pdf PDF
2_-_0_RFP_Sol_FA4610-15-R-0002_9_26_16_Amend_0002.pdf PDF
7_-_2 _CDRL_A011_Quality_Management_Plan.pdf PDF
7_-_1 _CDRL_A009_Program_Management_Plan.pdf PDF
5_-_Appendix_I_-_Service_Summary_Items_ _Objectives.pdf PDF
2_-_List_of_Changes_to_the_PWS_9_13_16.pdf PDF
7_-_Appendix_J_-_MDA_Launch_Communication_Systems.xlsx XLSX spreadsheet
4_-_Appendix_B_-_Equip_List_Other_Than_Appendix_A_Bldgs.xlsx XLSX spreadsheet
16_-_Atch_9 _CBA _2005-3169 _with_Appendix_A _51_pgs _redacted.pdf PDF
10_-_Appendix_N_Equipment_List_for_Appendix_A_Bldgs.xlsx XLSX spreadsheet
List_of_Documents_posted_to_FBO_Solicitation.pdf PDF
13-1 _Amendment_0001 _Atch_4 _LOSC_DD254_Continuation_Page.pdf PDF
20_-_Bidders_Library_LOSC_Workload_Data_r1.xlsx XLSX spreadsheet
12_-_Amendment_0001 _Atch_2 _CDRLs _A003 _A008 _A009 _A011 _A025_A029.pdf PDF
3_-_Atch_1_DRAFT_LOSC_PWS_9_12_16.pdf PDF
Atch_3_DIDs _LOSC.pdf PDF
3-PVVIR_144_4_15_2015.pdf PDF
6-CERS_10063651_Pillar_Pt_BusPlan.pdf PDF
4-PVVIR_156_5_28_2015.pdf PDF
2_-__Atch_1_LOSC_PWS_15Aug16.pdf PDF
20_-_Sec_J _Atch_8 _1986-0431.pdf PDF
21_-_Sec_J _Atch_9 _APPENDIX_A_-_Wage_Increases_(2014-2019).pdf PDF
1_-_Final_RFP_Solicitation_FA4610-15-R-0002_15_Aug_16.pdf PDF
7_-_Appendix_I_-_Service_Summary_Items_ _Objectives.pdf PDF
4_-_Appendix_B_-_Equip_List_Other_Than_Appendix_A_Bldgs.xlsx XLSX spreadsheet
5_-_Appendix_C _D _E _F _G.xlsx XLSX spreadsheet
21_-_Sec_J _Atch_9 _CBA_WD_2005-3169.pdf PDF
23_-_Sec_J _Atch_11_-_Mission_Essential_Contract_Services.pdf PDF
14_-_Sec_J _Atch_2_-_CDRLS_LOSC.pdf PDF
8_-_Appendix_J_-_MDA_Launch_Comm_Systems.pdf PDF
26_-_Atch_12 _Sample_TA_Statement_of_Work_(SOW)_7_26_16.pdf PDF
Appendix_L_-_Government_Furnished_Equipment_6_24_16.xlsx XLSX spreadsheet
Sec_J _Atch_2_-_Draft_CDRLS_LOSC.pdf PDF
Appendix_K_-_Acronyms_and_Abbreviations_6_24_16.docx DOCX document
Appendix_O_-_Glossary_6_24_16.docx DOCX document
Appendix_M_ _Real_Property_Report_6_24_16.xlsx XLSX spreadsheet
Appendix_C _D _E _F _G_6_24_16.xlsx XLSX spreadsheet
Atch_9 _CBA_WD_2005-3169.pdf PDF
Atch_9 _APPENDIX_B_-_Wage_Rate_Tables_(2014-2019)_Redacted.pdf PDF
Atch_9 _CBA _2014-2019_CBA_Redacted.pdf PDF
atch_7 _2005-2064.pdf PDF
atch_5 _2005-2154.pdf PDF
Atch_11_-_Mission_Essential_Contract_Services _03_May_16.pdf PDF
Draft_RFP _15R0002 __LOSC _27_Apr_16.pdf PDF
Appendix_K _Draft_Acronyms_and_Abbreviations _LOSC.docx DOCX document
Appendix_C _D _E _F_Draft_cranes_hoist_pvessels.xlsx XLSX spreadsheet
Appendix_B_Draft_Equip_List _LOSC.xlsx XLSX spreadsheet
DRAFT_LOSC_PWS_r4.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A029
title: System Safety Program Plan
sub:
auth:
ref: PWS 2.4.3
req_ofc: 30 SW/PMD
dd250: No
appcode: N/A
dist: F
freq: ONE/R
asof: N/A
firstsub: 30 DAC
subsub:
addressee1: 30 SW/PMD
draft1: 0
reg1: 1
repro1: 0
addressee2: 30 SW/SEA
draft2: 0
reg2: 1
repro2: 0
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: This CDRL should document the contractors System Safety Program Plan as required in section 2.5.2 of AFPSCMAN 91-710 V1.
group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: MISC
system:
ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .