8 - Amend 0002 List of Changes
View the file
Other files
Show 40 more
Latest 50 of 128 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA4610-15-R-0002, LOSC, List of Changes in Documents, Amendment 0002
# Document Changes
1. RFP, Sections A-M, 22 Sep 16 Section A, Number of pages changed from 91 to 100
2. Block 9, offers due date is changed from 04 Oct 16 to 14 Oct 16
3. Pg 48, Section I Contract Clauses added 52.203-14, 52.204-2, 52.204-2 Alt II, 52.215-2, Alt II & Alt III,
4. Pg 50, added clause 52.233-1, Alt I
5. Pg 51, added clauses 252.203-7998 (Dev), 252.204-7005, 252.222-7006.
Deleted clause 252.244-7000.
6. Pg 57, added clause 52.222-35.
7. Pg 58, added clause 52.222-36.
8. Pg 76, added clause 5352.204-9000
9. Pg 77, added clause 5352.223-9000
10. Pg 78, added clauses 5352.223-9001, 5352.242-9000
11. Pg 79, added clause 5352.242-9001
12. Pg 81, Section J, Atch 1, date for PWS changed from 9/12/16 to 9/16/16
13. Pg 82, Section K, added clause 52.204-17
14. Pg 83, added clause 52.204-8
15. Pg 98, Section L, deleted clause 52.222-46; added clause 252.209-7992 (Dev)
16. All pages, added Amendment 0002 with the page numbering
17. Sections L&M, 26 Sep 16 Para L-4.2, ** Page limit………., deleted Property Management Plan.
18. Para L-6.2 Deleted “A Technical Reference Library has been set up at Vandenberg AFB. The Technical Reference Library contains an in depth paper on the South Vandenberg Power Plant (SVPP) and additional information concerning equipment and specifications listed under paragraph L-6.6, Sub Factor 2— Operations Approach.”
19. Para L-6.4.2(2), changed “….please provide a subcontractor plan.” to “…..please submit your subcontractor’s information, if applicable.”
20. Added Amendment 0002 to footer
21. Atch 1, PWS, 22 Sep 16 Cover Page: Updated date from 15 August to 27 Sept 2.3.7: Removed reference to contract Work Request 2.6.2: Updated ISO reference to 9001-2015 5.1: Typo corrected 6.13.1: Updated acronym from Interim to Integrated 6.13.4: Corrected numbering, previously had two 6.13.3s 6.14.5: Corrected numbering, previously was 6.15.5
7.2 Section: Updated Title, restructured sub-numbering scheme to better clarify requirements 7.2.1.1: Added MDA specific Response and Restoral times
Solicitation FA4610-15-R-0002, LOSC, List of Changes in Documents, Amendment 0002
# Document Changes
7.2.1.8: Added IMDS requirement 7.2.1.9: Removed photography support 8.2: Removed GMD quality program requirement 8.8.1.2: Removed BOSWAM reference 8.8.2: Removed ‘and cost’ requirement 9.1: Removed old PTO references, added PTO 13968
22. Atch 2, CDRLs A009, submission date changed from 15 May to 60 DAC
23. A011, first submission has been changed from See Block 16 to 60 DAC with a frequency of One time and revisions.
24. A025, Block 12 has been revised from See Block 16 to 365 Days After Contract (award). Blk 16, Blk 8, has been updated to remove the inadvertent reference to the EPP.
25. A029, frequency has been changed from Weekly to One time and revisions
26. A008, Block 11 changed from 30 Jun to N/A.
27. Appendix A Updated cover page date, removed B974, removed repetitive listings of 763, removed B1777 from CLIN 1
28. Appendix I Updated cover page date, updated PWS para reference for performance objective B, C, D, E, F, G, and H
29. Appendix N Cypress Ridge asset was moved from Appendix N to Appendix B.
All Ewa Beach references were removed.
Lions Hd was relocated from Appendix N to Appendix B.
Miguelito Canyon Antenna support structure and wind hut were relocated from appendi N to appendix B.
Molokai Station was removed from Appendix N.
Oak Mountain facilities not listed in Appendix A were moved to Appendix B.
Point Conception asset was removed from Appendix N, already listed in B.
Purisma Point removed from Appendix N, already listed in B.
San Luis Light Station was removed from Appendix N, already listed in B.
All B731 assets moved from Appendix N to Appendix B.
Tran Peak assets moved from Appendix N to Appendix B.
X-37 Mob Recov Ops Cnter moved from Appendix N to appendix B.
Removed Load Weight Yard and SLC-3 “Facility” from Appendix N