21_-_Bidders_Library _LOSC _Boiler_PMI_-_PM040024.pdf
PDF 11 KB Posted
- Attached to
- Launch Operations Support Contract (LOSC)
- Solicitation number
- FA4610-15-R-0002
About this file
21 - Bidders Library LOSC Boiler PMI - PM040024
View the file
Other files
Show 40 more
Latest 50 of 128 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROGRAM-ID: MMB14P C A P E L L A PAGE 0001
REPORT-ID : MMB14P01 9/08/16
USER-ID : VBDPUTN MASTER PM INVENTORY LISTING 14:33:56
PMI Nbr: PM040024 Title: BOILER OPS & MAINTENANCE - (HOT WATER, >30PSI, <5MMBTUH, W) Prepared By: RECORD NOT FOUND Performing Org: V-1130 - HVAC CREW Skill: HVAC MECHANIC A Std Hrs: 6.0 Labor$: 522.20 Material$: 85.00 TOTAL$: 607.20 Method of Accomplishment: I (I=In-House, S=Subcontract, B=BPA, O=Others) Fund Source: NSCA PERMITS : ( ) Outage ( ) Access APPROVAL: ( ) Quality ( ) Safety
USAGE and/or CALENDAR TIME Estmd PM *NONE DA WK MO YR Step Hours Type Step Description 1 0001 .1 TD Notify Facility Manager and all relevant authorities, (e.g. Fire Dept., etc.), when applicable, of work to be accomplished.
1 0002 .2 TD PERFORM AS-FOUND INSPECTION. REVIEW OPERATION/ALARM HISTORY IN UNIT
CONTROLLER. CHECK FOR PROPER OPERATION, OPERATING MODE/SETTINGS, SYSTEM
CONDITION, AND PERFORMANCE.
1 0003 .3 TD PERFORM ROUTINE OPERATIONS: CHECK & RECORD GAUGES, INSPECT PLUMBING, VALVES, CONTROL LINKAGES, LIMIT/SAFETY/PRESSURE SWITCHES, CONTROLS, CHECK
FOR COMBUSTION INTAKE & EXHAUST AIR FLOW RESTRICTIONS.
1 0004 .2 TD CHECK AIR INTAKE FILTER. CLEAN, WASH OR REPLACE IF NECESSARY AND AS
EQUIPPED.
1 0005 .2 TD WIPE/VACCUM CLEAN EXTERIOR OF UNIT AND CLEAN/VACUUM MECHANICAL ROOM.
1 0006 .1 TD COMPARE SENSOR READINGS AT INTERFACE PANEL WTIH ANY INSTALLED SYSTEM
INSTALLED PRESSURE/TEMPERATURE GAUGES.
1 0007 .1 TD CHECK OPERATION OF BURNER CONTROL SYSTEM, AND VISUALLY CHECK BURNER FLAME.
1 0008 .2 TD CHECK CONDENSATE DRAINAGE FOR BLOCKAGES AND PROPER FLOW, IF EQUIPPED.
1 0009 .3 TD TEST UNIT SAFETIES AND LOW WATER CUTOFF FOR PROPER OPERATION
1 0010 .1 TD CHECK POWER & CONTROL WIRING, CONNECTIONS, & COMPONENTS. CLEAN CABINETS
WITH COMBINATION OF VACUUM, COMRPESSED AIR, AND/OR LINT-FREE RAGS.
TIGHTEN TERMINALS AS NEC'Y.
1 0011 .1 TD CHECK ALL ASSOCIATED VALVES & EXERCISE TO ENSURE PROPER OPERATION
1 0012 .1 TD INSPECT ENTIRE UNIT FOR RUST, CORROSION, CRACKS, PINHOLES, ETC. SPOT
TREAT CORROSION, TIGHTEN, CLEAN, AND/OR OPEN CORRECTIVE ACTION WORK ORDER
AS NECESSARY.
1 0013 .1 TD ANNUAL MAINTENANCE:
HAVE O&M MANUAL ON HAND WHILE PERFORMING ANNUAL MAINTENANCE.
1 0014 .1 TD TURN OFF THE GAS SUPPLY & ALLOW UNIT TO COOL
1 0015 .2 TD CLEAN INTERIOR AND EXTERIOR OF THE UNIT
1 0016 .2 TD INSPECT INTERIOR FOR DAMAGES TO THE FIREBOX, BURNER, FLUE, DEFECTIVE
TUBES, LEAKS, CRACKS, GASKETS, FIREBRICK, ETC.
1 0017 .2 TD INSPECT THE UNIT FOR WATER LEAKS. BRUSH CLEAN WATER SIDE SURFACES, REMOVE
ALL HEAD PLATES AND INSPECT TUBES, INSPECT WATER COLUMNS
1 0018 .1 TD CHECK CONDITION OF SITE GAUGE AND INSPECTION PORT GLASS.
1 0019 .1 TD INSPECT RELIEF VALVE, TRAPS, STEAM LINES (IF EQUIPPED). EXERCISE RELIEF
VALVE (LIFT CHECK) NOTING ANY EXCESSIVE OR LIGHT AMOUNT OF FORCE REQUIRED
TO LIFT.
1 0020 .2 TD CLEAN ALL RUST, CORROSION, ETC FROM UNIT. SPOT TREAT AS NEC'Y USING TEMP
RATED PAINT FOR SURFACE BEING TREATED.
1 0021 .3 TD USING A COMBINATION OF BRUSH AND VACUUM, CLEAN FIREBOX, BURNER, & FLUE.
1 0022 .1 TD MAKE ANY ADJUSTMENTS AND/OR MINOR REPAIRS AS NECESSARY
1 0023 .1 TD DRAIN, FLUSH, AND REFILL FEEDWATER TANK (IF EQUIPPED)
1 0024 .1 TD RESTORE POWER AND TURN ON GAS SUPPLY TO THE UNIT AND VERIFY PROPER
OPERATION
PROGRAM-ID: MMB14P C A P E L L A PAGE 0002
REPORT-ID : MMB14P01 9/08/16
USER-ID : VBDPUTN MASTER PM INVENTORY LISTING 14:33:56
PMI Nbr: PM040024 Title: BOILER OPS & MAINTENANCE - (HOT WATER, >30PSI, <5MMBTUH, W) Prepared By: RECORD NOT FOUND
USAGE and/or CALENDAR TIME Estmd PM *NONE DA WK MO YR Step Hours Type Step Description
1 0025 .1 TD ADJUST MAIN AND/OR PILOT BURNERS AS NECESSARY
1 0026 .1 TD SIMULATE TEST OF SYSTEM SAFETIES, LOW WATER CUT-OFF, FLAME FAILURE, &
HIGH/LOW LIMITS.
1 0027 .1 TD FOR BUILDINGS 1819 AND 8510, RECORD FUEL USAGE AND REPORT TO CHI
ENVIRONMENTAL.
1 0028 .1 TD MEASURE AND RECORD PRESSURE READINGS
1 0029 .1 TD PERFORM THE ANNUAL SPIN TEST FOR FUEL METERS IF EQUIPPED WITH EXTERNAL
MEANS.
1 0030 .1 TD VERIFY SYSTEM HAS BEEN PROPERLY CONFIGURED & RESTORED, AND IS OPERATING
NORMALLY.
1 0031 .1 TD Notify Facility Manager and all relevant authorities, (e.g. Fire Dept., etc), when applicable, of work accomplished and any pertinent information regarding the facility.
1 0032 .1 TD Notify Work Control Center of any follow up work required.
FREQUENCY SUMMARY:
Estmd Nbr of Frequency/Description Hours Workers Reg Hrs OT Hrs Tvl Hrs TOTAL WBS Number
WEEKLY 2.0 1 2.0 .0 .0 2.0 3.4.1
MONTHLY .6 1 1.0 .0 .0 1.0 3.4.1
ANNUAL 2.0 1 3.0 .0 .0 3.0 3.4.1
SAFETY REQUIREMENTS:
STANDARD PPE.
VOLTAGE RATED TOOLS AND PPE WHEN WORKING ON ENERGIZED CIRCUITS.
FOLLOW PROPER LOCKOUT/TAGOUT PROCEDURES TO ISOLATE ENERGY SOURCES.
GENERAL NOTES:
TOOLS REQUIRED:
VACUUM, TUBE BRUSHES
STANDARD HAND TOOLS & MULTI-METERS
BILL OF MATERIALS (BASE):
Step Stock Nbr Req'd Qty Description Unit Price Extend Price
*** No Bill of Materials ***
BILL OF MATERIALS (Item Specific):
Step Cust Property Nbr Stock Nbr RAD Replacing Req'd Qty Description Unit Price Extend Price
*** No Item Spedific Bill of Materials ***
File details come from the government source that posted it. Updated .