21_-_Bidders_Library _LOSC _Boiler_PMI_-_PM040024.pdf

PDF 11 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-15-R-0002
Issued by

About this file

21 - Bidders Library LOSC Boiler PMI - PM040024

View the file

Other files

File Type Posted
Released_ _Signed_FA4610-15-R-0002_Amend_0003.pdf PDF
FA4610-15-R-0002_Amend_0003.pdf PDF
8_-_Amend_0002_list_of_changes_9_26_16_R2.pdf PDF
6_-_Appendix_N_Equipment_List_for_Appendix_A_Bldgs_9_26_16.xlsx XLSX spreadsheet
7_-_3 _CDRL_A025_RCM_Plan.pdf PDF
2_-_0_RFP_Sol_FA4610-15-R-0002_9_26_16_Amend_0002.pdf PDF
7_-_2 _CDRL_A011_Quality_Management_Plan.pdf PDF
2_-_1_Sec_L_M _26_Sep_16.pdf PDF
8_-_Amend_0002_list_of_changes_9_26_16.pdf PDF
7_-_1 _CDRL_A009_Program_Management_Plan.pdf PDF
5_-_Appendix_I_-_Service_Summary_Items_ _Objectives.pdf PDF
4_-_Appendix_A_-_Building_Listing_13Sept16.xlsx XLSX spreadsheet
9_-_Atch_10 _DB_WD_CA1600023_(Rev_12).pdf PDF
1_-_Amendment_0002.pdf PDF
7_-_5 _CDRL_A008_P_E_Responsibility_List.pdf PDF
3_-_Atch_1__LOSC_PWS_9_27_16.pdf PDF
7_-_4 _CDRL_A029_System_Safety_Program_Plan.pdf PDF
QAs_LOSC_Ind_day_26_Sep_16_final.pdf PDF
26_-_Bidders_Library _Crane_Hook_Inspections_3.pdf PDF
25_-_Bidders_Library _Crane_Hook_Inspections_2.pdf PDF
24_-_Bidders_Library _Crane_Hook_Inspections_1.pdf PDF
27_-_Bidders_Library _Crane_Hook_Inspections_4.pdf PDF
1_-_List_of_Changes_to_L_M_9_13_16.pdf PDF
2_-_List_of_Changes_to_the_PWS_9_13_16.pdf PDF
23_-_LOSC_Industry_Day_Slides_18_Aug_16.pdf PDF
18_-_Atch_9 _CBA_WD_2005-3169 _2_pgs.pdf PDF
14_-_Atch_10 _DB_WD_CA160023 _rev_10.pdf PDF
5_-_Appendix_C _D _E _F _G.xlsx XLSX spreadsheet
20_-_Bidders_Library_LOSC_Workload_Data_r1.xlsx XLSX spreadsheet
1_-_Amend_0001_FA4610-15-R-0002.pdf PDF
7_-_Appendix_J_-_MDA_Launch_Communication_Systems.xlsx XLSX spreadsheet
12_-_Amendment_0001 _Atch_2 _CDRLs _A003 _A008 _A009 _A011 _A025_A029.pdf PDF
19_-_Atch_10 _DB_WD_CA160023 _rev_10.pdf PDF
22_-_Appendix_A_-_Building_Listing_13Sept16.xlsx XLSX spreadsheet
15_-_Atch_14 _LOSC_QASP_19_Aug_16_fixed_pg_numbers.pdf PDF
3_-_Atch_1_DRAFT_LOSC_PWS_9_12_16.pdf PDF
16_-_Atch_9 _CBA _2005-3169 _with_Appendix_A _51_pgs _redacted.pdf PDF
4_-_Appendix_B_-_Equip_List_Other_Than_Appendix_A_Bldgs.xlsx XLSX spreadsheet
10_-_Appendix_N_Equipment_List_for_Appendix_A_Bldgs.xlsx XLSX spreadsheet
17_-_Atch_9 _APPENDIX_B_-_Wage_Rate_Tables_(2014-2019)_Redacted _2_pgs.pdf PDF
List_of_Documents_posted_to_FBO_Solicitation.pdf PDF
13-1 _Amendment_0001 _Atch_4 _LOSC_DD254_Continuation_Page.pdf PDF
9_-_Appendix_M_Real_Property_Report.xlsx XLSX spreadsheet
2_-1 _Sec_L_M_12_Sep_16_lh_ntc_r2.pdf PDF
8_-_Appendix_L_-_Government_Furnished_Equipment.xlsx XLSX spreadsheet
13_-_Amendment_0001 _Atch_4 _LOSC_Solicitation_FA4610-15-R-0002_DD254_7Sep16.pdf PDF
11_-_Appendix_O_-_Glossary.pdf PDF
2_-_Final_RFP_Solicitation_FA4610-15-R-0002_12_Sep_16.pdf PDF
6_-_Appendix_I_-_Service_Summary_Items_Objectives.pdf PDF
Atch_3_DIDs _LOSC.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRAM-ID: MMB14P C A P E L L A PAGE 0001

REPORT-ID : MMB14P01 9/08/16

USER-ID : VBDPUTN MASTER PM INVENTORY LISTING 14:33:56

PMI Nbr: PM040024 Title: BOILER OPS & MAINTENANCE - (HOT WATER, >30PSI, <5MMBTUH, W) Prepared By: RECORD NOT FOUND Performing Org: V-1130 - HVAC CREW Skill: HVAC MECHANIC A Std Hrs: 6.0 Labor$: 522.20 Material$: 85.00 TOTAL$: 607.20 Method of Accomplishment: I (I=In-House, S=Subcontract, B=BPA, O=Others) Fund Source: NSCA PERMITS : ( ) Outage ( ) Access APPROVAL: ( ) Quality ( ) Safety

USAGE and/or CALENDAR TIME Estmd PM *NONE DA WK MO YR Step Hours Type Step Description 1 0001 .1 TD Notify Facility Manager and all relevant authorities, (e.g. Fire Dept., etc.), when applicable, of work to be accomplished.

1 0002 .2 TD PERFORM AS-FOUND INSPECTION. REVIEW OPERATION/ALARM HISTORY IN UNIT

CONTROLLER. CHECK FOR PROPER OPERATION, OPERATING MODE/SETTINGS, SYSTEM

CONDITION, AND PERFORMANCE.

1 0003 .3 TD PERFORM ROUTINE OPERATIONS: CHECK & RECORD GAUGES, INSPECT PLUMBING, VALVES, CONTROL LINKAGES, LIMIT/SAFETY/PRESSURE SWITCHES, CONTROLS, CHECK

FOR COMBUSTION INTAKE & EXHAUST AIR FLOW RESTRICTIONS.

1 0004 .2 TD CHECK AIR INTAKE FILTER. CLEAN, WASH OR REPLACE IF NECESSARY AND AS

EQUIPPED.

1 0005 .2 TD WIPE/VACCUM CLEAN EXTERIOR OF UNIT AND CLEAN/VACUUM MECHANICAL ROOM.

1 0006 .1 TD COMPARE SENSOR READINGS AT INTERFACE PANEL WTIH ANY INSTALLED SYSTEM

INSTALLED PRESSURE/TEMPERATURE GAUGES.

1 0007 .1 TD CHECK OPERATION OF BURNER CONTROL SYSTEM, AND VISUALLY CHECK BURNER FLAME.

1 0008 .2 TD CHECK CONDENSATE DRAINAGE FOR BLOCKAGES AND PROPER FLOW, IF EQUIPPED.

1 0009 .3 TD TEST UNIT SAFETIES AND LOW WATER CUTOFF FOR PROPER OPERATION

1 0010 .1 TD CHECK POWER & CONTROL WIRING, CONNECTIONS, & COMPONENTS. CLEAN CABINETS

WITH COMBINATION OF VACUUM, COMRPESSED AIR, AND/OR LINT-FREE RAGS.

TIGHTEN TERMINALS AS NEC'Y.

1 0011 .1 TD CHECK ALL ASSOCIATED VALVES & EXERCISE TO ENSURE PROPER OPERATION

1 0012 .1 TD INSPECT ENTIRE UNIT FOR RUST, CORROSION, CRACKS, PINHOLES, ETC. SPOT

TREAT CORROSION, TIGHTEN, CLEAN, AND/OR OPEN CORRECTIVE ACTION WORK ORDER

AS NECESSARY.

1 0013 .1 TD ANNUAL MAINTENANCE:

HAVE O&M MANUAL ON HAND WHILE PERFORMING ANNUAL MAINTENANCE.

1 0014 .1 TD TURN OFF THE GAS SUPPLY & ALLOW UNIT TO COOL

1 0015 .2 TD CLEAN INTERIOR AND EXTERIOR OF THE UNIT

1 0016 .2 TD INSPECT INTERIOR FOR DAMAGES TO THE FIREBOX, BURNER, FLUE, DEFECTIVE

TUBES, LEAKS, CRACKS, GASKETS, FIREBRICK, ETC.

1 0017 .2 TD INSPECT THE UNIT FOR WATER LEAKS. BRUSH CLEAN WATER SIDE SURFACES, REMOVE

ALL HEAD PLATES AND INSPECT TUBES, INSPECT WATER COLUMNS

1 0018 .1 TD CHECK CONDITION OF SITE GAUGE AND INSPECTION PORT GLASS.

1 0019 .1 TD INSPECT RELIEF VALVE, TRAPS, STEAM LINES (IF EQUIPPED). EXERCISE RELIEF

VALVE (LIFT CHECK) NOTING ANY EXCESSIVE OR LIGHT AMOUNT OF FORCE REQUIRED

TO LIFT.

1 0020 .2 TD CLEAN ALL RUST, CORROSION, ETC FROM UNIT. SPOT TREAT AS NEC'Y USING TEMP

RATED PAINT FOR SURFACE BEING TREATED.

1 0021 .3 TD USING A COMBINATION OF BRUSH AND VACUUM, CLEAN FIREBOX, BURNER, & FLUE.

1 0022 .1 TD MAKE ANY ADJUSTMENTS AND/OR MINOR REPAIRS AS NECESSARY

1 0023 .1 TD DRAIN, FLUSH, AND REFILL FEEDWATER TANK (IF EQUIPPED)

1 0024 .1 TD RESTORE POWER AND TURN ON GAS SUPPLY TO THE UNIT AND VERIFY PROPER

OPERATION

PROGRAM-ID: MMB14P C A P E L L A PAGE 0002

REPORT-ID : MMB14P01 9/08/16

USER-ID : VBDPUTN MASTER PM INVENTORY LISTING 14:33:56

PMI Nbr: PM040024 Title: BOILER OPS & MAINTENANCE - (HOT WATER, >30PSI, <5MMBTUH, W) Prepared By: RECORD NOT FOUND

USAGE and/or CALENDAR TIME Estmd PM *NONE DA WK MO YR Step Hours Type Step Description

1 0025 .1 TD ADJUST MAIN AND/OR PILOT BURNERS AS NECESSARY

1 0026 .1 TD SIMULATE TEST OF SYSTEM SAFETIES, LOW WATER CUT-OFF, FLAME FAILURE, &

HIGH/LOW LIMITS.

1 0027 .1 TD FOR BUILDINGS 1819 AND 8510, RECORD FUEL USAGE AND REPORT TO CHI

ENVIRONMENTAL.

1 0028 .1 TD MEASURE AND RECORD PRESSURE READINGS

1 0029 .1 TD PERFORM THE ANNUAL SPIN TEST FOR FUEL METERS IF EQUIPPED WITH EXTERNAL

MEANS.

1 0030 .1 TD VERIFY SYSTEM HAS BEEN PROPERLY CONFIGURED & RESTORED, AND IS OPERATING

NORMALLY.

1 0031 .1 TD Notify Facility Manager and all relevant authorities, (e.g. Fire Dept., etc), when applicable, of work accomplished and any pertinent information regarding the facility.

1 0032 .1 TD Notify Work Control Center of any follow up work required.

FREQUENCY SUMMARY:

Estmd Nbr of Frequency/Description Hours Workers Reg Hrs OT Hrs Tvl Hrs TOTAL WBS Number

WEEKLY 2.0 1 2.0 .0 .0 2.0 3.4.1

MONTHLY .6 1 1.0 .0 .0 1.0 3.4.1

ANNUAL 2.0 1 3.0 .0 .0 3.0 3.4.1

SAFETY REQUIREMENTS:

STANDARD PPE.

VOLTAGE RATED TOOLS AND PPE WHEN WORKING ON ENERGIZED CIRCUITS.

FOLLOW PROPER LOCKOUT/TAGOUT PROCEDURES TO ISOLATE ENERGY SOURCES.

GENERAL NOTES:

TOOLS REQUIRED:

VACUUM, TUBE BRUSHES

STANDARD HAND TOOLS & MULTI-METERS

BILL OF MATERIALS (BASE):

Step Stock Nbr Req'd Qty Description Unit Price Extend Price

*** No Bill of Materials ***

BILL OF MATERIALS (Item Specific):

Step Cust Property Nbr Stock Nbr RAD Replacing Req'd Qty Description Unit Price Extend Price

*** No Item Spedific Bill of Materials ***

File details come from the government source that posted it. Updated .