Technical_Specifications_List_Rev_20180816.pdf
PDF 44 KB Posted
- Attached to
- Replace Chiller Pumps & Piping Bldg 4196 Federal contract opportunity
- Solicitation number
- FA301618R0068
About this file
Technical Specifications List Rev 20180816
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17 Apr 2018 Rev. 16 Aug 2018
Technical Specification List
NOTE: The design requirements listed in the SOW represent the minimum quality and quantity acceptable for the proposals and project submittals. Not all technical specifications identified below are included. Contractor shall be responsible for obtaining any documents not attached as part of this SOW but referenced as criteria for the project.
Referenced government/military criteria can be obtained from the following website:
http://www.wbdg.org/ccb/ccb.php. In the event of conflict between referenced standards, the most stringent requirements apply
02 41 00 Demolition and Deconstruction 02 82 13.00 Asbestos Abatement 02 82 14.00 10 Asbestos Hazard Control Activities 03 30 00 Cast-in-Place Concrete 03 30 00.00 10 Cast-in-Place Concrete 03 35 00.00 Concrete finishing 04 20 00 Unit Masonry 09 06 90 Color Schedule 22 00 00 Plumbing, General Purpose 23 05 15 Common Piping for HVAC 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 Thermal Insulation for Mechanical Systems 23 09 00 Instrumentation and Control for HVAC 23 09 13 Instrumentation and Control Devices for HVAC 23 09 13.34 40 Control Valves, Self-Contained 23 09 23 Heating, Ventilating and Air Conditioning (HVAC) Controls For
Fort Sam Houston (FSH) BACnet Direct Digital Controls (DDC) 23 09 33.00 40 Electric and Electronic Control System for HVAC 23 09 93 Sequences of Operation for HVAC Control 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems 25 10 10 Utility Monitoring and Control Systems (UMCS) Front End and
Integration 26 05 00.00 40 Common Work Results for Electrical 26 24 13 Switchboards 26 24 16.00 40 Panelboards http://www.wbdg.org/ccb/ccb.php
17 Apr 2018 Rev. 16 Aug 2018
26 29 23 Variable Frequency Drive Systems Under 600 Volts 31 00 00 Earthwork 31 11 00 Clearing and Grubbing 31 21 00 Piping; Off-Gas 31 23 00.00 20 Excavation and Fill 31 32 23 Foundation Drilling and Grouting 31 60 00 Foundation Preparation 31 62 13.13 Cast-In-Place Concrete Piles 31 23 00.00 20 Excavation and FILL 32 92 26 Sodding 32 93 00 Exterior Plants 33 11 00 Water Utility Distribution Piping 33 30 00 Sanitary Sewerage 33 40 00 Storm Drainage Utilities