Attachment_2_-_Schedule_of_Material_Submittals_20180719.pdf

PDF 34 KB Posted

Attached to
Replace Chiller Pumps & Piping Bldg 4196 Federal contract opportunity
Solicitation number
FA301618R0068
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace Chiller Pumps & Piping Bldg 4196, newest first.
File Type Posted
Amendment_0003_22_Aug_18.pdf PDF
Utility_Drawings.zip ZIP file
Appendix_C_-_Conceptual_Drawings.zip ZIP file
DB_SOW_JBSF170263_Replace_Chiller_Pumps_and_Piping_B4196_Rev_1_20180816.pdf PDF
Technical_Specifications_List_Rev_20180816.pdf PDF
Amendment_0002_21_Aug_18.pdf PDF
Amendment_001.docx DOCX document
USACE_AHU-2.jpeg JPEG file
Chiller_B4196_Model_(1).pdf PDF
WaterMain_Routing_1_of_2.jpeg JPEG file
Water_Main_Routing_2_of_2.jpeg JPEG file
Site_Visit_Q_A's_Updates_8-13-18.pdf PDF
Sign-in_Sheet_30_July_18.pdf PDF
Appendix_H_-_Radioactive_Mat.pdf PDF
Appendix_G_-_ACM_LBP_Specs.pdf PDF
Appendix_J_-_AEC_CAD_StandardR5.pdf PDF
Appendix_A_-_Technical_Specs.pdf PDF
Appendix_B_-_Combined_File.pdf PDF
Appendix_I.pdf PDF
Appendix_K_Jan_2003.pdf PDF
Appendix_C_-_Mechanical_Rm_and_Cooling_Tower_2.pdf PDF
Appendix_E_-_Photos_19_July_18.pdf PDF
Appendix_L_Slide_Show__30July13_(2).pdf PDF
Appendix_F_-_Asbestos_and_Lead_Based_Paint_Survey.pdf PDF
Appendix_L_HAZMAT_Usage_Report_30July13_(1).pdf PDF
Attachment_3_-_Wage_Determination_TX180280_07_06_18.pdf PDF
FA301618R0068.pdf PDF
Attachment_1_-_DB_SOW_JBSF170263-Replace_Chiller,_Pumps_and_Piping,_B4196_Rev_201805.pdf PDF
Attachment_4_-_Past_Performance_Information_Sheet_19_July_18.docx DOCX document
Attachment_5_-_IMT3064_Progress_Schedule_-_19_July_18.xls XLS spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

1 Advanced Modeling Project execution Plan (DIV 01)

2 DCM Procedures (DIV 01) 3 3 Design and Code checklists (DIV 01) 3 4 Sustainable Design (DIV 01) 3 5 Design Submittals - Hard Copies 65%

(SOW Ref)

6 Design Submittals -CD/DVD 65% (SOW Ref)

7 Design Submittals - Hard Copies 95% (SOW Ref)

3 3 3

8 Design Submittals -CD/DVD 95% (SOW Ref)

3 3 3

9 Design Submittals - Hard Copies 100% (SOW Ref)

3 3 3 3 3

10 Design Submittals -CD/DVD 100% (SOW Ref)

3 3 3 3 3

11 Project Schedule; Bar Chart (DIV 01) 3

12 Project Contruction Schedule Updates

(DIV 01)

13 Progress Photos with Location Map (DIV 01)

14 Quality Control Reports (DIV 01) 3

15 Accident Prevention Plan (DIV 01) 3

16 List of Contact Personnel (DIV 01) 3

17 Personnel List (DIV 01) 3

18 Topographic Survey (SOW Ref) 3

19 Geotechnical Investigation (SOW Ref) 3

20 Survey Work Plan (DIV 01) 3

21 Survey Completion Notification (DIV 01) 3

22 Environmental Protection Plan (DIV 01) 3

23 Lead Hazard Control Plan (DIV 01) 3

24 Asbestos Hazard Plan (DIV 01) 3

25 Safety Data Sheets (SDS), (DIV 01) 3

26 Health and Safety Plan (DIV 01) 3

27 Safety & Health Phase Out Report 3

28 Backflow Preventer Test (DIV 01) 3 3

29 Traffic Control Plan (DIV 01) 3

30 Construction Site Plan (DIV 01) 3

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

C on tra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required

D at e R ec ei ve d in C on tra ct in g

Fi el d R ep or ts

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns

Project Number:

JBSF170263-63637

Project Title:

Replace Chiller, Pumps, and Piping, B4196

Solicitation / Contract Number:

TBD

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

R eq ui re d Su bm is si on

D at e

Item or Description of Item, Contract Reference, Type of Submittal

C er tif ic at e of C om pl ia nc e

Sh op

D ra w in gs

R et ur n

Su sp en se

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

C ol or S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

C at al og

D at a

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

C on tra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required

D at e R ec ei ve d in C on tra ct in g

Fi el d R ep or ts

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns

Project Number:

JBSF170263-63637

Project Title:

Replace Chiller, Pumps, and Piping, B4196

Solicitation / Contract Number:

TBD

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

R eq ui re d Su bm is si on

D at e

Item or Description of Item, Contract Reference, Type of Submittal

C er tif ic at e of C om pl ia nc e

Sh op

D ra w in gs

R et ur n

Su sp en se

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

C ol or S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

C at al og

D at a

31 Dust Control Plan & Procedures (DIV 01 & 02)

32 Biobased Products 3 3

33 SWPPP (DIV 01) 3

34 Quality Control Plan - Design (DIV 01) 3

35 Quality Control Plan - Construction (DIV 01)

36 License/ Permits (SOW Ref) 3

37 Demolition Plan (DIV 02) 3

38 Demolition Certificates (DIV 02) 3

39 Waste Manifest (DIV 01) 3

40 Proof of Qualification of crane Operators

(DIV 01)

41 Crane Critical Lift Plan (DIV 01) 3

42 Activity Hazard Analysis (DIV 01) 3

43 Test Reports (DIV 01) 3

44 Concrete Pre-Construction Submittals

(DIV 03)

45 Concrete Product Data Submittals (DIV 03)

3 3 3 3 3

46 Masonry Product Data Submittals (DIV 04)

3 3 3 3 3