Appendix G - 502CES ACM LBP Spec Requirements
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS/ LEAD
502d CIVIL ENGINEER SQUADRON (CES}
Environmental Specifications Requirements
Site Specific Notification: (The following information must be included in all projects falling under the jurisdiction of the 502d CES).
Asbestos:
Licenses, Permits and Notification;
a. The contractor shall be responsible for completing the Department of State Health Services (DSHS) 10-day asbestos notification. Once notification package Is complete, It must be conveyed (original signature only) to (DSHS).
b. Once the DSHS notification has been completed and returned. The contractor must forward the notification to Fort Sam Houston's (FSH) Project Manager (PM). The (FSH) (PM) will then review the notification package for completeness and accuracy. The following minimum Information must be Included on Transmittal:
1. (FSH) (PM) contact information.
2. Project number.
3. Building# and address (demolition site),
4. Asbestos abatement contractor's contact Information.
c. The (FSH) (PM) will forward the notification package to the S02d Civil Engineer Squadron Environmental Offke at the following address:
S02d Ctvll Engineer Squadron Environmental Office 2250 Engineer Street, Suite 7 Fort Sam Houston, TX 78234-7740 Attn: Ms. Ingrid Rhodes
d. The notification package wlll be logged-in and routed to Mr. Leandro Quiroga (Mike)
(Asbestos and Lead Manager). If the asbestos notification package is found to be in error, the (FSH) (CES) (PM) wlll be notified that the package must be corrected and resubmitted. If the package is found to be complete and accurate, it will be signed off by the Asbestos and Lead Manager. The (FSH) (CES) (PM) will then be notified that the package Is ready for pick-up.
19 July 18
e. If start and completion dates are not met, the contractor will submit an amendment to the original state notification. The (CES/EO) wlll sign .ind the (PM) will return to the contractor.
f, The (FSH) (CES) (PM) will then forward documentation to the contractor. The contractor must deliver the signed Original asbestos notification package to DSHS In a manner, and within the time frame required by IAW TEXAS LAW
Asbestos:
Disposal Documentation;
a. The contractor shalt prepare the manifest for disposal.
b. The contractor shall prepare all waste profile documentation for the acceptance of waste into the disposal facility.
c. The profile sheet must be signed by the Fort Sam Houston (CES) Envlronmental Office
(EO).
d. The contractor shall use the FSH's Environmental Protection Agency (EPA) Identification and state registration numbers.
e. The manifest must be signed by the (FSH) (CES) Environmental personnel as the generator.
f. The manifest shall be returned to the (FSH) (CES)Environmental Office no later than 30-days after disposal materials have been shipped.
g. The original manifest must be malled to:
502d Civil Engineer Squadron
Environmental Office
2250 Engineer Street, Suite 7
Lead:
Fort Sam Houston, TX 78234•7740
h. The contractor's final clearance test results must be submitted to the (FSH) (CES) (EO) for review and approval prior to occupancy.
Disposal Documentation:
a. The contractor shall prepare the manifest for debris disposal, as required.
b. The contractor shall prepare all required waste profile documents for the disposal of waste Into the disposal facility. The profile sheets shall be signed by the Fort Sam
Houston's (CES) Environmental Office.
c. The contractor shall use (FSH)'s (EPA)'s identification and state registration numbers.
d. The manifest must be signed by (FSH) (EO) personnel as the generator.
e. The original manifest must be returned to the (FSH) (CES) (EO) no later than 30-days after material has been shipped.
f. The original manifest shall be mailed to aforementioned address mentioned above.