Appendix C- Project Conceptual Drawings
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
B
A
CHP-1 CHP-2 HWP-1 HWP-2
L
6 >-==:::r-7 1+--i----iHHWS -
3:: ;;:
®�c:::a-4.:::1::c---------1.f
ENLARGED MECHANICAL ROOM PLAN
SCALE: 3/16" = 1' - O"
NOTES INDICATED BY "0"
(D ROUTE FLUE THROUGH ROOF TO FACTORY SUPPLIED ROOF CAP. SEAL ROOF
PENETRATION WEATHER-TIGHT.
@ INSTALL 2EA 12"X24" CA DUCTS AT THIS LOCATION. TERMINATE ONE DUCT 12"
AFF AND TERMINATE THE OTHER DUCT 12" BFC. ROUTE DUCTS THROUGH
ROOF TO INTAKE HOOD. SEAL ROOF PENETRATION WEATHER-TIGHT.
@ CONNECT NEW CHILLED WATER RETURN TO EXISTING CHILLER.
© CONNECT NEW CHILLED WATER SUPPLY TO EXISTING CHILLER.
@ ROUTE CHILLED WATER LINES UP INTO CEILING SPACE FOR AIR HANDLING
UNITS. SEE SHEET M1 .2 FOR CONTINUATION.
@ HW PIPING TO/FROM SOLAR WATER HEATING SYSTEM.
(J) CHW PIPING TO/FROM COE SPACE.
@ HW PIPING TO/FROM COE SPACE.
NORTH
AUTO AIR
VENT, PIPE
TO DRAIN
SYMBOL LEGEND
SYMBOL DESCRIPTION
[] EQUIPMENT/DUCTWORK TO BE REMOVED
D EQUIPMENT/DUCTWORK TO REMAIN
D NEW EQUIPMENT/DUCTWORK
@--- SUPPLY DIFFUSER (WITH PATTERN)
[2J RETURN GRILLE
0 EXHAUST SECTION - UP
0 SUPPLY SECTION - DOWN
[J RETURN SECTION - DOWN
0 SUPPLY SECTION - UP
[J RETURN SECTION - UP
f 24x6 } RECTANGULAR DUCT OR OPENING SIZE -
FIRST NUMBER VISIBLE SIDE
c=:=J BRANCH FOR SUPPLY
0 ELBOW - WITH TURNING VANES
I � } MANUAL DAMPER
I i } MODULATING DAMPER
I 1-1} DUCT RISE IN DIRECTION OF ARROW
SA SUPPLY AIR
RA RETURN AIR
EA EXHAUST AIR
CA COMBUSTION AIR
FD FIRE DAMPER
MBD MANUAL BALANCING DAMPER
AFF ABOVE FINISHED FLOOR
BFC BELOW FINISHED CEILING
� CONNECT TO EXISTING
['.!]] TEMPERATURE SENSOR
I@ UNITARY CONTROLLER
-HWS- HEATING WATER SUPPLY, NEW
-HWR- HEATING WATER RETURN, NEW
-CHWS- CHILLED WATER SUPPLY, NEW
-CHWR- CHILLED WATER RETURN, NEW
3/4"
3 4
TO DRAIN\ STOP VALVE (TYP)
SUPPLY VALVE
\ RETURN VALVE
"' \ 3-WAY MIXING VALVE\ \
HEATING WATER RETURN "' \ \
AUTOMATIC AIR VENT
r+-----1 TO EXPANSION TANK
NC
l--"--C>:< N ;J--,------1><1----C:/!:I-C><l----i
N O NO ----t-AIR/DIRT ELIMINATOR u---�-------1TO HEATING WATER PUMP BOILER WATER TEMP CONTROL
COMB TEMP AND
PRESSURE GAUGE
HIGH LIMIT CONTROL
ASME RELIEF VALVE
TO DRAIN--1
BOILER DRAIN VALVE--
-;:::.c,.�-----1
N C
STRAINER.../
N O
>---------1 MAKEUP WATER
N O
NO
BOILER
TO DRAIN
\ 4" HOUSEKEEPING PAD
NOTES:
CHILLER WATER FLOW
METER
PRESSURE SENSOR
(TYP)
1. PROVIDE UNIONS/FLANGES AT CONNECTIONS TO BOILER, EXPANSION TANK,
CONTROL VALVES, ETC.
2. VENT ALL REGULATORS INTO BURNER CHAMBER.
BOILER PIPING SCHEMATIC
NO SCALE
CONTROL VALVE
AUTOMATIC AIR
THERMOMETER (TYP)
/ TEMPERATURE SENSOR (TYP)
/ VENT (TYP) /
f-------------a!�F----+--lf NO <1=1>--3" TO AHU
FULL SIZE TO
FLOOR DRAIN
r<--->----,-----1><>------, (TYP)
NO
\ GATE VALVE (TYP)
r REMOVABLE SPOOL PIECE
FROM CHEMICAL >-----
FEEDER
NO / _ NO 3/4" MAKEUP WATER
3. ---4------¢>
3" FLANGE�-+---
GATE VALVE�(TYP) '\_
/4AUTO FLOW CONTROL VALVE (TYP)
CHECK VALVE (TYP)
t , /FLEX CONNECTION (TYP)
/ _/GAUGE AND GAUGE COCK (TYP)
/ /COUPLING
� I r CAST IRON BASE
3" SUPPLY AND
RETURN FROM
CHILLER
PIPE STAND
'\ SUPPORT \
t-L-...J-j._,,.__---'«, � VIBRATION ISOLATION
�========i---- 4" THICK CONCRETE PAD
SYSTEM
CONNECTION
STRAINER WITH
SLOWDOWN VALVE
ECCENTRIC REDUCER
\ FLOOR
DISCHARGE-REFER TO
PLANS FOR SIZE AUTO FLOW CONTROL VALVE 1-- --- ----jlr=.---J
L o PUMP SUCTION
1-1 /2" CHARGING
VAL VE CLOSURE ---------...
o-i--...i__
CHILLED WATER PIPING SCHEMATIC
CHECK VALVE� "'- FLEX CONNECTION
GATE VALVE
1 �GAUGE AND GAUGE COCK
FLEX / /COUPLING
CONNECTION\
b=/� r � CAST IRON BASE
PIPE STAND
, · ,,rVIBRATION ISOLATION SUPPORT /
STRAINER WITH
SLOWDOWN VALVE
r::::=====::':::::::=::::::=:::::i----4" THICK CONCRETE PAD
ECCENTRIC REDUCER \FLOOR
WATER PUMP DETAIL
NO SCALE
AIR/DIRT ELIMINATOR
r
N C N O t----,---lf------iXI-T-1_-...... _ MAKEUP WATER
Y>i<:J---CN ><1 o f--l � REDUCED PRESSURE
---------- BACKFLOW PREVENTOR
PRESSURE REDUCING VALVE
CONC. FLOOR
�TANK AIR
PRESSURE
EXPANSION TANK
1----
------1 l�/4" DRNN
MAKEUP WATER AND EXPANSION TANK DETAIL
NO SCALE
NO SCALE
0 4 8 12 16 ••• 11 ' ' '
GRAPHIC SCALE: 3/16" = 1 '-0"
NOTE:
IF THIS DRAWING IS OTHER THAN
FULL SIZE, (22" x 34 "), UTILIZE BAR
SCALES IN LIEU OF NUMERIC SCALES.
RECORD DRAWING AS-BUILT - DECEMBER 2009
m US Army Corps of Engineers
Fort Worth District
Thia elootronio drawing file ia releooed under the Authority of Tray C. Secord - 12994, on 06IOll{[)8, who maintains th11 Original file. This elactronlc drawing n111 may be used as a backgrcund drawing P""'uanl lo Rula 1.103{1) of the �laaand RegulatlonaoftheTexas Board of Architectural Examiners, the user of this electronic drawing flle agrees to aasume 1111 resp::,nsibility for any rnxlifi011tion to or use of this drawing file that ie inconsistent with Iha requirements of ihe Rules and Regulations of the Texas Board of Architectural Examiners.
No person may mllke any modtncatlcn to this electronic drawing file without the Ardlitect's expresswr1tten permission a, 0::w
ID
wu w Cl s
ID
Cl uw 0::
0 w ._ �� "':J a.'\' a.en ""
N "' N 0' Cl' -st 0'
"' ,, (!) 0 C (00 �N "'
.. 0.. _i::� !w C O") oC/J 8 s= t "C
.iic:c u -, -1'□
Ii:: " w
>, m w C:
� Cl) z ci5 en en 5 0:: � -w Ow 0:: z w w- I- WC!) I-z z I--Wet'. (!) LL Q i:li Os:
>- Cl) I- ::; &a Cl'.
0:: 0 0<((.)LL
:j
�� I- wCl) I-
IQ
::; z
Cl) � I- <( Cl'. z 0 <( LL Cl)
1"-i s
C ii E 1/J
0 � (!) 0 s: "'- 0"'·"' "<· � C: �
"C C " .. .. �• s -"' E • � ·1 • 0 1/J j O 15 0 u:::: C: a:
t "C • � l c:c - -, E �□ "' u, � o.;
0� C
� � ��� D'.I - r--;o,:
....i"' Haddr, "''"" , �� Iii 5l - - '0
0'5� uu •• fil e:l u o-
A "" � ::;;J�� ... ;:�1Z'.l
0 i;,E-<§' 0 ... ,.r.,, ;;..cl!j ;::l '• !
C, ...... z :s
0..
z
_J g - z
CD (.) w
UJ ::;:
I- w
:s 0 w z
UJ
Sheet Reference Number:
M1 .3 Sheet 35 of 58
19 July 2018 ryan.p.kemble Polygon ryan.p.kemble Polygon ryan.p.kemble Polygon ryan.p.kemble Polygon ryan.p.kemble Polygon ryan.p.kemble Polygonal Line ryan.p.kemble Polygonal Line ryan.p.kemble Line ryan.p.kemble Polygonal Line ryan.p.kemble Callout Remove existing Cooling Tower, Structure and Pad.
ryan.p.kemble Callout Remove existing pad ryan.p.kemble Callout Existing Temporary Chiller Connection ryan.p.kemble Callout Existing Temporary Chiller Connection ryan.p.kemble Callout Remove existing CHP Pumps. Retain/Re-use Pads.
ryan.p.kemble Callout Remove Existing Condenser Cooling Pumps and pads ryan.p.kemble Callout Remove existing Chiller and Pad.
ryan.p.kemble Polygonal Line ryan.p.kemble Line ryan.p.kemble Line ryan.p.kemble Line ryan.p.kemble Line ryan.p.kemble Line ryan.p.kemble Line ryan.p.kemble Line ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Text Box Based on As-Built Drawing from December 2009 ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Rectangle ryan.p.kemble Callout Remove cabling back to existing MDP-04. Replace Breakers as required.
ryan.p.kemble Callout Remove cabling and existing Motor Controllers for pumps being removed (4) ea.
ryan.p.kemble Polygon
B
A
CHP-1 CHP-2 HWP-1 HWP-2
L
6 >-==:::r-7 1+--i----iHHWS -
3:: ;;:
®�c:::a-4.:::1::c---------1.f
ENLARGED MECHANICAL ROOM PLAN
SCALE: 3/16" = 1' - O"
NOTES INDICATED BY "0"
(D ROUTE FLUE THROUGH ROOF TO FACTORY SUPPLIED ROOF CAP. SEAL ROOF
PENETRATION WEATHER-TIGHT.
@ INSTALL 2EA 12"X24" CA DUCTS AT THIS LOCATION. TERMINATE ONE DUCT 12"
AFF AND TERMINATE THE OTHER DUCT 12" BFC. ROUTE DUCTS THROUGH
ROOF TO INTAKE HOOD. SEAL ROOF PENETRATION WEATHER-TIGHT.
@ CONNECT NEW CHILLED WATER RETURN TO EXISTING CHILLER.
© CONNECT NEW CHILLED WATER SUPPLY TO EXISTING CHILLER.
@ ROUTE CHILLED WATER LINES UP INTO CEILING SPACE FOR AIR HANDLING
UNITS. SEE SHEET M1 .2 FOR CONTINUATION.
@ HW PIPING TO/FROM SOLAR WATER HEATING SYSTEM.
(J) CHW PIPING TO/FROM COE SPACE.
@ HW PIPING TO/FROM COE SPACE.
NORTH
AUTO AIR
VENT, PIPE
TO DRAIN
SYMBOL LEGEND
SYMBOL DESCRIPTION
[] EQUIPMENT/DUCTWORK TO BE REMOVED
D EQUIPMENT/DUCTWORK TO REMAIN
D NEW EQUIPMENT/DUCTWORK
@--- SUPPLY DIFFUSER (WITH PATTERN)
[2J RETURN GRILLE
0 EXHAUST SECTION - UP
0 SUPPLY SECTION - DOWN
[J RETURN SECTION - DOWN
0 SUPPLY SECTION - UP
[J RETURN SECTION - UP
f 24x6 } RECTANGULAR DUCT OR OPENING SIZE -
FIRST NUMBER VISIBLE SIDE
c=:=J BRANCH FOR SUPPLY
0 ELBOW - WITH TURNING VANES
I � } MANUAL DAMPER
I i } MODULATING DAMPER
I 1-1} DUCT RISE IN DIRECTION OF ARROW
SA SUPPLY AIR
RA RETURN AIR
EA EXHAUST AIR
CA COMBUSTION AIR
FD FIRE DAMPER
MBD MANUAL BALANCING DAMPER
AFF ABOVE FINISHED FLOOR
BFC BELOW FINISHED CEILING
� CONNECT TO EXISTING
['.!]] TEMPERATURE SENSOR
I@ UNITARY CONTROLLER
-HWS- HEATING WATER SUPPLY, NEW
-HWR- HEATING WATER RETURN, NEW
-CHWS- CHILLED WATER SUPPLY, NEW
-CHWR- CHILLED WATER RETURN, NEW
3/4"
3 4
TO DRAIN\ STOP VALVE (TYP)
SUPPLY VALVE
\ RETURN VALVE
"' \ 3-WAY MIXING VALVE\ \
HEATING WATER RETURN "' \ \
AUTOMATIC AIR VENT
r+-----1 TO EXPANSION TANK
NC
l--"--C>:< N ;J--,------1><1----C:/!:I-C><l----i
N O NO ----t-AIR/DIRT ELIMINATOR u---�-------1TO HEATING WATER PUMP BOILER WATER TEMP CONTROL
COMB TEMP AND
PRESSURE GAUGE
HIGH LIMIT CONTROL
ASME RELIEF VALVE
TO DRAIN--1
BOILER DRAIN VALVE--
-;:::.c,.�-----1
N C
STRAINER.../
N O
>---------1 MAKEUP WATER
N O
NO
BOILER
TO DRAIN
\ 4" HOUSEKEEPING PAD
NOTES:
CHILLER WATER FLOW
METER
PRESSURE SENSOR
(TYP)
1. PROVIDE UNIONS/FLANGES AT CONNECTIONS TO BOILER, EXPANSION TANK,
CONTROL VALVES, ETC.
2. VENT ALL REGULATORS INTO BURNER CHAMBER.
BOILER PIPING SCHEMATIC
NO SCALE
CONTROL VALVE
AUTOMATIC AIR
THERMOMETER (TYP)
/ TEMPERATURE SENSOR (TYP)
/ VENT (TYP) /
f-------------a!�F----+--lf NO <1=1>--3" TO AHU
FULL SIZE TO
FLOOR DRAIN
r<--->----,-----1><>------, (TYP)
NO
\ GATE VALVE (TYP)
r REMOVABLE SPOOL PIECE
FROM CHEMICAL >-----
FEEDER
NO / _ NO 3/4" MAKEUP WATER
3. ---4------¢>
3" FLANGE�-+---
GATE VALVE�(TYP) '\_
/4AUTO FLOW CONTROL VALVE (TYP)
CHECK VALVE (TYP)
t , /FLEX CONNECTION (TYP)
/ _/GAUGE AND GAUGE COCK (TYP)
/ /COUPLING
� I r CAST IRON BASE
3" SUPPLY AND
RETURN FROM
CHILLER
PIPE STAND
'\ SUPPORT \
t-L-...J-j._,,.__---'«, � VIBRATION ISOLATION
�========i---- 4" THICK CONCRETE PAD
SYSTEM
CONNECTION
STRAINER WITH
SLOWDOWN VALVE
ECCENTRIC REDUCER
\ FLOOR
DISCHARGE-REFER TO
PLANS FOR SIZE AUTO FLOW CONTROL VALVE 1-- --- ----jlr=.---J
L o PUMP SUCTION
1-1 /2" CHARGING
VAL VE CLOSURE ---------...
o-i--...i__
CHILLED WATER PIPING SCHEMATIC
CHECK VALVE� "'- FLEX CONNECTION
GATE VALVE
1 �GAUGE AND GAUGE COCK
FLEX / /COUPLING
CONNECTION\
b=/� r � CAST IRON BASE
PIPE STAND
, · ,,rVIBRATION ISOLATION SUPPORT /
STRAINER WITH
SLOWDOWN VALVE
r::::=====::':::::::=::::::=:::::i----4" THICK CONCRETE PAD
ECCENTRIC REDUCER \FLOOR
WATER PUMP DETAIL
AIR/DIRT ELIMINATOR
r
N C N O t----,---lf------iXI-T-1_-...... _ MAKEUP WATER
Y>i<:J---CN ><1 o f--l � REDUCED PRESSURE
---------- BACKFLOW PREVENTOR
PRESSURE REDUCING VALVE
CONC. FLOOR
�TANK AIR
PRESSURE
EXPANSION TANK
1----
------1 l�/4" DRNN
MAKEUP WATER AND EXPANSION TANK DETAIL
0 4 8 12 16 ••• 11 ' ' '
GRAPHIC SCALE: 3/16" = 1 '-0"
NOTE:
IF THIS DRAWING IS OTHER THAN
FULL SIZE, (22" x 34 "), UTILIZE BAR
SCALES IN LIEU OF NUMERIC SCALES.
RECORD DRAWING AS-BUILT - DECEMBER 2009
m US Army Corps of Engineers
Fort Worth District
Thia elootronio drawing file ia releooed under the Authority of Tray C. Secord - 12994, on 06IOll{[)8, who maintains th11 Original file. This elactronlc drawing n111 may be used as a backgrcund drawing P""'uanl lo Rula 1.103{1) of the �laaand RegulatlonaoftheTexas Board of Architectural Examiners, the user of this electronic drawing flle agrees to aasume 1111 resp::,nsibility for any rnxlifi011tion to or use of this drawing file that ie inconsistent with Iha requirements of ihe Rules and Regulations of the Texas Board of Architectural Examiners.
No person may mllke any modtncatlcn to this electronic drawing file without the Ardlitect's expresswr1tten permission a, 0::w
ID
wu w Cl s
ID
Cl uw 0::
0 w ._ �� "':J a.'\' a.en ""
N "' N
0' Cl' -st 0'
"' ,, (!) 0 C (00 �N "'
.. 0.. _i::� !w C O") oC/J 8 s= t "C
.iic:c u -, -1'□
Ii:: " w
>, m w C:
� Cl) z ci5 en en 5 0:: � -w Ow 0:: z w w- I- WC!) I-z z I--Wet'. (!) LL Q i:li Os:
>- Cl) I- ::; &a Cl'.
0:: 0 0<((.)LL
:j
�� I- wCl) I-
IQ
::; z
Cl) � I- <( Cl'. z 0 <( LL Cl)
1"-i s ii E 1/J
0 � (!) 0 s: "'- 0"'·"' "<· � C: �
"C C " .. .. �• s -"' E • � ·1 • 0 1/J j O 15 0 u:::: C: a:
t "C • � l c:c - -, E �□ "' u, � o.;
0� C
� � ��� D'.I - r--;o,:
....i"' Haddr, "''"" , �� Iii 5l - - '0
0'5� uu •• fil e:l u o-
A "" � ::;;J�� ... ;:�1Z'.l
0 i;,E-<§' 0 ... ,.r.,, ;;..cl!j ;::l '• !
C, ...... z :s
0..
_J g - z
CD (.) w
UJ ::;:
I- w
:s 0 w
UJ
Sheet Reference Number:
M1 .3 Sheet 35 of 58
Polygon
Callout
Existing Temporary Chiller Connection
Existing Temporary Chiller Connection
Line
Rectangle
Text Box
Based on As-Built Drawing from December 2009
Text Box
New Air Cooled Chiller [300 Ton, Multi-Circuit]
Polygonal Line
Polygonal Line
Two(2) New CHP Pumps, Piping and valving. Instrumentation as required.
New Air Cooled Chiller, piping, valves and instrumentation to connect to existing building loops.
Temp Chiller Connections w/isolation valve (Retain/re-Use)
(2) new motor controllers and associated cabling.
Connect New Chiller and Pumps to exisiting MDP-04