Attachment_5_-_IMT3064_Progress_Schedule_-_19_July_18.xls

XLS spreadsheet 113 KB Posted

Attached to
Replace Chiller Pumps & Piping Bldg 4196 Federal contract opportunity
Solicitation number
FA301618R0068
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to Replace Chiller Pumps & Piping Bldg 4196, newest first.
File Type Posted
Amendment_0003_22_Aug_18.pdf PDF
DB_SOW_JBSF170263_Replace_Chiller_Pumps_and_Piping_B4196_Rev_1_20180816.pdf PDF
Technical_Specifications_List_Rev_20180816.pdf PDF
Amendment_0002_21_Aug_18.pdf PDF
Utility_Drawings.zip ZIP file
Appendix_C_-_Conceptual_Drawings.zip ZIP file
Amendment_001.docx DOCX document
Water_Main_Routing_2_of_2.jpeg JPEG file
Site_Visit_Q_A's_Updates_8-13-18.pdf PDF
USACE_AHU-2.jpeg JPEG file
Chiller_B4196_Model_(1).pdf PDF
WaterMain_Routing_1_of_2.jpeg JPEG file
Sign-in_Sheet_30_July_18.pdf PDF
Appendix_A_-_Technical_Specs.pdf PDF
Appendix_B_-_Combined_File.pdf PDF
Appendix_I.pdf PDF
Appendix_H_-_Radioactive_Mat.pdf PDF
Appendix_G_-_ACM_LBP_Specs.pdf PDF
Appendix_J_-_AEC_CAD_StandardR5.pdf PDF
Appendix_E_-_Photos_19_July_18.pdf PDF
Appendix_L_Slide_Show__30July13_(2).pdf PDF
Appendix_F_-_Asbestos_and_Lead_Based_Paint_Survey.pdf PDF
Appendix_L_HAZMAT_Usage_Report_30July13_(1).pdf PDF
Appendix_K_Jan_2003.pdf PDF
Appendix_C_-_Mechanical_Rm_and_Cooling_Tower_2.pdf PDF
Attachment_1_-_DB_SOW_JBSF170263-Replace_Chiller,_Pumps_and_Piping,_B4196_Rev_201805.pdf PDF
Attachment_4_-_Past_Performance_Information_Sheet_19_July_18.docx DOCX document
Attachment_2_-_Schedule_of_Material_Submittals_20180719.pdf PDF
Attachment_3_-_Wage_Determination_TX180280_07_06_18.pdf PDF
FA301618R0068.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRESS SCHEDULE

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response. Including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for
information, Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your
(form questionnaire) to either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
DATE SIGNEDINSTALLATIONS ENGINEER'S SIGNATURE
2. STARTING DATE2 December 2015TYMX150075
3. COMPLETION DATE19 July 20169. SUBMITTED BY:ROB SALZMAN
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME & ADDRESSCONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.FA3047-16-C-0007DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATE
7. ACTUAL COMPLETION DATE
Line No.Work Element%DEC
2015JAN
2016FEB
2016MAR
2016APR
2016MAY
2016JUN
2016JUL
2016ActualScheduled
0.00%
1Final Inspection and Closeout0.00%
0.00%
2Design0.00%
0.00%
3PROGRESS CLEANING0.00%
0.00%
4DUMPSTERS0.00%
0.00%
5FINAL CLEANUP0.00%
0.00%
6DEMOLITION AND DUST PARTITION0.00%
0.00%
7CONCRETE0.00%
0.00%
8WOOD FRAMING - BLOCKING WALLS0.00%
0.00%
9MILLWORK/CASEWORK0.00%
0.00%
10INSULATION0.00%
0.00%
11SEALANTS - FIRE AND ACOUSTIC0.00%
0.00%
12DOORS, FRAMES, & ACCESS CONTROL0.00%
0.00%
13PASS THROUGH WINDOW , 36" X 36"0.00%
0.00%
14METAL STUD WALL FRAMING0.00%
0.00%
15DRYWALL0.00%
0.00%
16ACOUSTICAL AND SHEETROCK CEILINGS0.00%
0.00%
17PORCELAIN TILE REPAIRS0.00%
0.00%
18FLOORING0.00%
0.00%
19PAINTING0.00%
0.00%
20RESTROOM SPECIALTIES0.00%
0.00%
21FIRE EXTINGUISHER & SIGN SPECIALTIES0.00%
0.00%
22AUDITORIUM SEATING0.00%
0.00%
23FIRE SUPPRESSION SPRINKLER SYSTEM0.00%
0.00%
24PLUMBING0.00%
0.00%
25HVAC0.00%
0.00%
26COMMISSIONING0.00%
0.00%
27ELECTRICAL0.00%
0.00%
28FIRE ALARM0.00%
0.00%
29DATA/COMMUNICATIONS0.00%
0.00%
0.00%
PERCENTAGE OF COMPLETION (CUMULATIVE)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
SCHEDULED COMPLETION0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL COMPLETION0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL COMPLETION (CUMULATIVE)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
FORM NO. AF 3064

Page &P of &N

ENTER HERE FOR GRAPH

Tejas Premier
ActualScheduled
Jan0.00%0.00%USE LINE PERCENTAGE OF COMPLETION (CUMULATIVE)
Feb0.00%0.00%
Mar0.00%0.00%
Apr0.00%0.00%
May0.00%0.00%
Jun0.00%0.00%
Jul0.00%0.00%
Aug0.00%0.00%
Sep0.00%0.00%
Oct0.00%0.00%
Nov0.00%0.00%
Dec0.00%0.00%

GRAPH

Line No.Work Element%12/31/990DEC
2015JAN
2016FEB
2016MAR
2016APR
2016MAY
2016JUN
2016JUL
2016ActualScheduled
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
1Final Inspection and Closeout0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
2Design0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
3PROGRESS CLEANING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
4DUMPSTERS0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
5FINAL CLEANUP0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
6DEMOLITION AND DUST PARTITION0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
7CONCRETE0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
8WOOD FRAMING - BLOCKING WALLS0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
9MILLWORK/CASEWORK0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
10INSULATION0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
11SEALANTS - FIRE AND ACOUSTIC0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
12DOORS, FRAMES, & ACCESS CONTROL0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
13PASS THROUGH WINDOW , 36" X 36"0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
14METAL STUD WALL FRAMING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
15DRYWALL0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
16ACOUSTICAL AND SHEETROCK CEILINGS0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
17PORCELAIN TILE REPAIRS0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
18FLOORING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
19PAINTING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
20RESTROOM SPECIALTIES0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
21FIRE EXTINGUISHER & SIGN SPECIALTIES0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
22AUDITORIUM SEATING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
23FIRE SUPPRESSION SPRINKLER SYSTEM0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
24PLUMBING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
25HVAC0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
26COMMISSIONING0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
27ELECTRICAL0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
28FIRE ALARM0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
29DATA/COMMUNICATIONS0.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
00000.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
000.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
PERCENTAGE OF COMPLETION (CUMULATIVE)0.00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
SCHEDULED COMPLETION0.00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL COMPLETION0.00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL COMPLETION (CUMULATIVE)0.00.00%00.00.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

&LRenovations to Bldg. 743&CProgress Schedule

FA3047-16-C-0007&R&D

GRAPH

JanJan
FebFeb
MarMar
AprApr
MayMay
JunJun
JulJul
AugAug
SepSep
OctOct
NovNov
DecDec

&LBMT Chapel HVAC Replacement&CProgress Schedule Period 24 Oct 07 - 18 Sep 08 FA3047-07-C-0044&RNovember 19, 2007

ACTUAL

SCHEDULED

File details come from the government source that posted it.