About this file

Appendix H - Request to Use Radioactive Material

View the file

Other files for this federal contract opportunity

Other files attached to Replace Chiller Pumps & Piping Bldg 4196, newest first.
File Type Posted
Amendment_0003_22_Aug_18.pdf PDF
DB_SOW_JBSF170263_Replace_Chiller_Pumps_and_Piping_B4196_Rev_1_20180816.pdf PDF
Technical_Specifications_List_Rev_20180816.pdf PDF
Amendment_0002_21_Aug_18.pdf PDF
Utility_Drawings.zip ZIP file
Appendix_C_-_Conceptual_Drawings.zip ZIP file
Water_Main_Routing_2_of_2.jpeg JPEG file
Site_Visit_Q_A's_Updates_8-13-18.pdf PDF
Amendment_001.docx DOCX document
USACE_AHU-2.jpeg JPEG file
Chiller_B4196_Model_(1).pdf PDF
WaterMain_Routing_1_of_2.jpeg JPEG file
Sign-in_Sheet_30_July_18.pdf PDF
Appendix_E_-_Photos_19_July_18.pdf PDF
Appendix_L_Slide_Show__30July13_(2).pdf PDF
Appendix_F_-_Asbestos_and_Lead_Based_Paint_Survey.pdf PDF
Appendix_L_HAZMAT_Usage_Report_30July13_(1).pdf PDF
Appendix_A_-_Technical_Specs.pdf PDF
Appendix_B_-_Combined_File.pdf PDF
Appendix_I.pdf PDF
Appendix_K_Jan_2003.pdf PDF
Appendix_C_-_Mechanical_Rm_and_Cooling_Tower_2.pdf PDF
Appendix_G_-_ACM_LBP_Specs.pdf PDF
Appendix_J_-_AEC_CAD_StandardR5.pdf PDF
Attachment_5_-_IMT3064_Progress_Schedule_-_19_July_18.xls XLS spreadsheet
Attachment_1_-_DB_SOW_JBSF170263-Replace_Chiller,_Pumps_and_Piping,_B4196_Rev_201805.pdf PDF
Attachment_4_-_Past_Performance_Information_Sheet_19_July_18.docx DOCX document
Attachment_2_-_Schedule_of_Material_Submittals_20180719.pdf PDF
Attachment_3_-_Wage_Determination_TX180280_07_06_18.pdf PDF
FA301618R0068.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFI40-201 17 SEPTEMBER 2014 Incorporating Change 1, 17 December 2015

3.3.3. Non-USAF organizations, except DOE organizations and DOE prime contractors, transferring or using RAM on USAF installations in areas of exclusive Federal jurisdiction must have an NRC or Agreement State license with a current NRC Form 241 authorizing transfer and use on the installation and written approval from the installation commander’s appointed approval authority, normally the IRSO (10 CFR Part 150.20(b).1). (T-0)

3.4.5. Non-USAF organizations using RAM, including NARM, on USAF installations. When a civilian organization or other Federal agency desires to transfer, transport, or temporarily store

RAM on or conduct operations using RAM on a USAF installation, written approval must be obtained from the IRSO. (T-2)

3.4.5.1. The non-USAF organization must send a request to the IRSO at least 30 calendar days before bringing the RAM onto the installation. (T-2) For contractors, these requirements must be included in the statement of work. (T-2)

3.4.5.2. Requests must be in writing and include:

3.4.5.2.1. A brief description of the proposed activities; (T-1)

3.4.5.2.2. A copy of a current NRC or Agreement State license with current NRC Form 241 for areas of exclusive Federal jurisdiction, when applicable. (T-1) For those areas of concurrent or proprietary jurisdiction in an Agreement State, the respective Agreement State license is a valid authorization. The license must either specifically list the installation or authorize approval for work at temporary job sites anywhere in the United States where the NRC or Agreement State has jurisdiction (NUREG 1556 Vol 20, Guidance About Administrative Licensing Procedures, and 10 CFR 150.20). (T-0) Exception: Contractors using generally licensed materials (e.g., certain Niton® Lead Paint Analyzers) and DOE or DOE prime contractors operating IAW 10

CFR Part 835 Occupational Radiation Protection do not require an NRC license or NRC Form

241. (T-0)

3.4.5.2.3. The name, local address, and telephone number for the responsible local representative and the name, address, and telephone number of the RSO named on their license; (T-3)

3.4.5.2.4. A copy of the contract clause of the USAF contract describing work to be performed at the installation and the inclusive dates of the work; and (T-3)

3.4.5.2.5. A written authorization in the contract that the IRSO can conduct periodic assessments to ensure contractor personnel is complying with radiation safety practices to prevent exposures to USAF personnel and avoid contamination of government property. (T-1) In addition, the contract should specify the IRSO must have authority to suspend contractor operations believed to be unsafe. (T-1)

3.4.5.3. Agreement State licensees using NRC regulated materials in areas of exclusive Federal jurisdiction must provide a copy of the NRC Form 241 approved by either the USAF installation's or contractor’s NRC Region according to 10 CFR 150.20. (T-0) The form must specify the correct locations and dates of performance of licensed activities. (T-0) State licensees may not work on USAF or other installations where exclusive Federal jurisdiction exists for more than 180 calendar days per calendar year without first getting an NRC license. (T-1)

3.4.5.4. Non-USAF organizations that do not have an NRC or Agreement State License with current NRC Form 241 and who are not DOE or DOE prime contractors exempted from icensing must contact the RICS for guidance and approval to use RAM on an USAF installation. (T-1)

File details come from the government source that posted it.