Vance RFP Questions 2 Mar 07

IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
1TechnicalAircraft Maintenance11.1.611.1.1none

Discussion "A qualified Certified Barrier Maintenance personnel shall be on duty when the Airfield is open." (sic) Regardless of the fact that we were unable to find a notation that establishes set hours of operation for the airfield, if AETC reqires the Ai.rfield to be opened at abnormal hours for whatever reason, we would need to call-out a qualified CBM.

Question
A) What are the establishe dhours of operation for the Airfield? B) How frequently has the Command opened the Airfield outside of these established
hours of operation over the last year? Three years?
Response
2TechnicalOperations and11-1-1 and 11-1-11.1.111.2.14, 19.1.4, 13.1.9.3
Maintenance

Discussion There is a considerable amount of time, space and detail in the discussion of responsibilities incumbant upon the Contractor in the perfromance of work relating to MFH. However, during the site visit (end of day 1) a question dealing with the status of MFH was responded to with an expression of assurance the MFH woiuld already be transfered to a private contractor by the time this contract start date is reached.

Question
If MFH will be in the transferred under the privitization program, whould we proceed to take the MFH requirements seriously? Why is it still part of
the RFP?
Response
Friday, March 02, 2007Page 1 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
3TechnicalOperations and11.1.411.2.8.1none
Maintenance

Discussion In the preceeding setion, the RFP clearly defines RWP as being the Recurring Work Program. However, when the IWP Programmer/scheduler is introduced in this section, the acronym "IWP" appears parantheically, but without any defining explanation.

Question
What does IWP stand for in this context?
Response
4TechnicalCustodial19-1-119.1All Custodial manpower CLINS

Discussion "The Contractor shall provied all.........services (custodial) ....as identified below for Vance AFB inaccordance with Building Owners and Managers Association (BOMA) commercila standards."

Question
BOMA commercial standards set a range of square footage per man-hour of labor, within which performance of custodial duties is to be targeted and
achieved in order to produce results in keeping with other BOMA standards. Is this the intended meaning of the RFP language? Should we calculate all
labor and productivity rates in accordance with this BOMA standard?
Response
Friday, March 02, 2007Page 2 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
5TechnicalGround and Site13-1-613.1.9.9All Military Family Housing.
Maintenance

Discussion The Contractor is required to pick up trash in the MFH areas.

Question
Will this requirement continue even after the MFH area is privatized?
Response
6TechnicalCommunications and7/1/20267.1.17.6.1Video Services
Information Technology

Discussion Paragraph states provide editing….

Question
What video editing software is used?
Response
7TechnicalCommunications and7/1/20267.1.17.5.5.9VTC Services
Information Technology

Discussion Provide Video telecommunication Conf. (VTC) services

Question
Are there any classified conf., if so, how many per year?
Response
Friday, March 02, 2007Page 3 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
8TechnicalCommunications and7/1/20017.1.Description of Services
Information Technology

Discussion In the Vance AFB Site Visit folder under BITS it states that the service provider will maintain the mail delivery van (MDV)

Question
Will the government provide vehicles in support of this contract?
Response
9TechnicalCommunications and131 of 1365.5.4.3Evaluation Criteria
Information Technology

Discussion Paragraph currently reads: “The effectiveness of the Offeror’s approach and methodology to meet cyclic and unique situations including the ability to meet peak workloads; overlapping or simultaneous taskings at Vance AFB such as weather to include high winds, lightning, hail and tornadoes priority transient alert support; plastic media blast for other organizations; base exercises; aging fleet; aircraft deicing; quiet hours; and increased off-station aircraft recovery.”

Question
The items “priority transient alert support; plastic media blast for other organizations;” and “aging fleet; aircraft deicing; quiet hours; and increased off-
station aircraft recovery.” Have nothing to do with Communications and Information Technology. Were these items included in the referenced
evaluation criteria by mistake? If intentional, please clarify their relevance to Comm & IT.
Response
Friday, March 02, 2007Page 4 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
10TechnicalCommunications and7/1/20017.1.Description of Services
Information Technology

Discussion In the Vance AFB Site Visit folder under Web Page Development/Design it states that the service provider will maintain Vance's Web site & Train.

There is no workload and description of this requirement in the RFP.

Question
If there is a requirement please provide scope and workload data.
Response
11TechnicalAircraft MaintenanceSection L, PageL-3.2.4.3; PWS
3.1.26.3

Discussion Para. L-3.2.4.3 indicates that the contractor will perform plastic media blasting (PMB) "for other organizations (some unscheduled structural repairs)."

PWS Para 3.1.26.3 indicates PMB for stripping Vance aircraft will be performed at a facility away from Vance. PMB capabilities noted during the site visit were a cabinet unit in Structural Repair and an AGE paint stripping facility (Building 119). We assume these could be used in support of other organizations through local manufacturing procedures.

Question
Request the Government clarify the PMB support requirements for other organizations.
Response
Friday, March 02, 2007Page 5 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
12TechnicalCommunications and7-3-17.3.1.2
Information Technology

Discussion The MCCC Reengineering in the Air Force and AETC is in various stages at different bases.

Question
What is the status of the reengineering effort at VAFB? If it is not complete, does our staffing need to reflect an assumption that the reengineering will
be complete at CSD?
Response
13TechnicalCommunications and7-B-21.2.1.5
Information Technology

Discussion The PWS equipment list indicates hubs throughout the network. During the visit, old and outdated hubs were seen to be in use.

Question
What is the timeline for replacing the bubs with switches? Who will be responsible for their installation and initial configuration?
Response
Friday, March 02, 2007Page 6 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
14TechnicalCommunications and7B-241.2.1.8
Information Technology

Discussion Our experience shows that the CSA workload for an Operations Group is much higher than that listed in the workload.

Question
Do the levels of workload indicate that there is a shared CSA responsibility in the Operations Group and Mission Support Group between the service
provider and government/military personnel? How many Civilian and Military CSAs are currently providing CSA support to these areas? If this is a
new requirement, how many military and Govt employees will also be providing CSA support to OG and MSG?
Response
15TechnicalCommunications and7-B-1 thru 7-B-Entire Doc
Information Technology

Discussion The workload provided in Appendix 7B seems limited and incomplete.

Question
Are there any cable locates for the Telephone Maintenance area? Is there any web services management workload
Response
Friday, March 02, 2007Page 7 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
16TechnicalCommunications andCBA
Information Technology

Discussion Within the CBA, (June 12, 2006 – Jun 7, 2009), there is no mention of Information Assurance or ADPE Equipment Control Officer duties within the job descriptions. Each of these areas has workload associated with them in the draft RFP.

Question
Are IA personnel and those providing Wing ECO duties not covered under the CBA? Is so, what are there general
Response
17TechnicalCommunications and
Information Technology

Discussion It was apparent during the site visit that the Professional Staff of Civil Engineering use software to assist in the design of projects. (Software programs like AutoCad, etc.)

Question
Since this software is on equipment provided by the Air Force, will the software transfer to the service provider Contractor awarded the follow-on
contract?
Response
Friday, March 02, 2007Page 8 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
18TechnicalOperations and11-1-1, 11-1-7,FirstO& M "This service shall support
Maintenance….to include military family housing
…. &…Airfield." Military Famil

Discussion The items listed to the left are examples of the MFH requirements. At the site visit the attendees were informed that a MFH privatization contractor was in the process of being selected. It would seem prudent to delete this requirement prior to submission of our techanical and price proposals due to the myriad of tasks that are woven throughout these two sections as well as Section 10. Should these requirements not be removed it will cause considerable revision of both volumes.

Question
At what point in the proposal process will the government remove the MFH requirements?
Response
19TechnicalEngineering Services

Discussion It was apparent during the site visit that the Professional Staff of Civil Engineering use software to assist in the design of projects. (Software programs like AutoCad, etc.)

Question
Since this software is on equipment provided by the Air Force, will the software transfer to the service provider Contractor awarded the follow-on
contract?
Response
Friday, March 02, 2007Page 9 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
20TechnicalCommunications and
Information Technology

Discussion During the site visit to VAFB it was apparent that a multitude of different software applications were being utilized by contractor personnel.

Question
What are the specific GFE commercial software programs that are installed on the various computers at VAFB for which the contractor is expected to
provide support, training, and maintenance services?
Response
21TechnicalCommunications and
Information Technology

Discussion During the site visit to VAFB it was apparent that a multitude of different software applications were being utilized by contractor personnel.

Question
What is the specific document management software program that is being used by VAFB to electronically manage Air Force and VAFB publications
and forms? Is this software program GFE and is it desired by VAFB to continue being used?
Response
Friday, March 02, 2007Page 10 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
22TechnicalCommunications and
Information Technology

Discussion During the site visit to VAFB it was apparent that a multitude of different software applications were being utilized by contractor personnel.

Question
What is the specific software program(s) that are used at VAFB to manage the Web Development function? Is this software program GFE and is it
desired by VAFB to continue being used?
Response
23TechnicalEngineering Services

Discussion Process of aquiring construction projects for the Civil Engineer construction programs. During the site visit on 21 Feb, it was noticed that in the Local purchase area of the current service contractor’s area a function was identified as construction.

Question
Are Civil Engineering construction projects advertised with bids received and awarded through the government procurement office or the service
provider's procurement office?
Response
Friday, March 02, 2007Page 11 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
24TechnicalCommunications andPage 5 of 136 ofCLIN Schedule B 0019 and Sub
Information TechnologyCLINS and PWS 7

Discussion The Para # in the PWS do not match up to the CLINS for Pricing except for 0019AB. 0019AD reference now states reserved and not assigend to Web Services Management. PWS does not have Para 7.1.3 any more it is 7.1.3.a and 7.1.3.b which conflicts with CLIN 001

Question
What are the correct PWS refrences for each SUB CLIN under 0019 and option years? This is needed for correct pricing.
Response
25TechnicalCommunications and7B-26 and 271.3.5 thru 1.3.7
Information Technology

Discussion Appendix 7B is missing Para 1.3.6 which appears to be Web Services

Question
Where is Para 1.3.6? Should it be Web Services Work load data?
Response
Friday, March 02, 2007Page 12 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
26General1 of 136 to 136Complete SOL doc
Contracting

Discussion The SOL document posted is password protected

Question
Will you unlock the SOL document for our use in preparing SF 33 and Schedule B?
Response
27TechnicalCommunications andPage 5 of 136CLIN Schedule CLINS 0020 and 0021
Information Technology

Discussion PWS Para reference states only PWS 7 for both and does not drill down to individual Para levles

Question
What are the correct PWS Para referenced for CLIN 0020 and 0021 and option years to provide correct staffing for each CLIN?
Response
28TechnicalOperations andPage 3 of 136CLIN Schedule 0007
Maintenance

Discussion PWS para reference 17.1.3.10 does not exist

Question
What is the correct Para reference so appropiate staffing is associated to CLIN 007 and option years?
Response
Friday, March 02, 2007Page 13 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
29TechnicalGround and SiteAppendix 13BAppendix 13 B
Maintenance

Discussion Pest Management was added to Section 13 between Draft and Final. In the Draft it was under PWS 16. No workload date was transferred to Section 13 or Attachment 13-B

Question
What is the workload for Pest Management under PWS 13?
Response
30GeneralApplicable to allN/AUnknown
ContractingServices

Discussion Numerous deadlines for various requriements are connected to "Contract Award Date" and "Pre-Performance Conference". Several documents and actions are driven by the pre-performance conference and the contract award dates.

Question
Can you give estimated dates for Contract Award Date and Pre-Performance Conference based on the 12 Feb 07 final RFP release date?
Response
Friday, March 02, 2007Page 14 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
31TechnicalApplicable to All100 of 1361.12
Services

Discussion Technical reference excludes manpower matrices from the page count. Due to limits we request justification be handled the same..

Question
Request required justification for manning matrices be excluded from required page count.
Response
32TechnicalHousing ManagementSection 1010/1/2001

Discussion Current PWS contains no reference to housing privatization. During Site Visit this topic was addressed and comments indicated privatization would occur prior to contract award or start.

Question
Please clarify how you want contractors to address housing PWS and impact of privatization?
Response
Friday, March 02, 2007Page 15 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
33PriceApplicable to All8-9 of 136, 26-1-2Section B and
Services26.1.1.11

Discussion Would like clarification regarding estimates provided for CLINs 0037, 0038, and 0039.

Question
Does 26.1.1.11 apply to the amounts listed in CLIN 0037, 0038, and 0039? If a contractor utilizes a total-cost input method for computation of G&A,
this calculation could force a contractor into a violation of CAS 9904-401.40, 50, and 61. Please clarify
Response
34TechnicalApplicable to AllRFP Section LParagraph 1.8
Services

Discussion Reference provides a matrix for submission of Volume 3 Sub-factor 3 information. This information/data is essentually the same for Civil Eng, Logistics and Communication sections. The response/data will essentually be the same in each of the 3 sections

Question
Within Vol 3, will the government accept a full outline in the Civil Engineering Section and allow the Logistic and Communication sections to reference
back to it where the data is the same?
Response
Friday, March 02, 2007Page 16 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
35TechnicalFire ProtectionAppendix 18FBN/A

Discussion Draft RFP listed essential mission critical equipment such as fire hoses, radios, and fire extinguishers in Appendix 18F. The final RFP does not list this equipment

Question
Can the government clarify what GFE is provided for the fire department?
Response
36TechnicalFire ProtectionAppendix 18FBN/A

Discussion Drfat RFP listed essential equipment in appendix 18F that is not included in final RFP.

Question
Will government provide a detailed listing of all PPE, HAZMAT, Rescue and other standard furnishings of those vehicles identified in Appendix 18
FF?
Response
Friday, March 02, 2007Page 17 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
37TechnicalFire ProtectionAppendix 18FBN/A

Discussion Draft RFP Appendix 18F listed essential equipment provided such as fire extinguishers. Final draft does not list them.

Question
Does the Fire Department have the responsibility for all facility fire extinguishers on the installation including MFH?
Response
38TechnicalCommunity Services28-1-1328.1.19.10

Discussion Reference requires Service Provider to provide a conveniently located control point for linen exchange.

Question
Will the Service Provider be able to use a government provided facility for this service?
Response
39TechnicalCommunications andSection 7PWS Section 2,
Information Technologypage 2-1-18

Discussion PWS requires contractor to provide support for a "QMIS Server" on page 7B-13

Question
Is this the same "SMART" application requirement that PWS calls out in Paragraph 2.1.23.7.2?
Response
Friday, March 02, 2007Page 18 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
40TechnicalApplicable to All2/1/20172.1.23.2.1225.1.4.3
Services

Discussion During the site visit, we observed numerous Contractor Owned vehicles. The current contract required that Government furnished vehicles be replaced by registration number during assigned fiscal years.

Question
Will the Government provide the offerors a list of vehicles replaced by the imcumbent contractor and the years they were replaced?
Response
41TechnicalTransportation25-1-425.1.4.3Current Contract

Discussion Referenced paragraph requires that the contractor provide vehicles required to perform the requirements listed in the PWS. During the site visit, we observed numerous contractor-furnished vehicles being operated to meet requirements. Some of these vehicles looked new and having numerous years of service left.

Question
Is the incumbent contractor going to be allowed to use those vehicles in serviceable condition and having years of service left. Or will the incumbent
contractor also be required to purchse new vehicles for this contract to make it a :level playing field?"
Response
Friday, March 02, 2007Page 19 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
42TechnicalTransportation25FF-1Appendix 25FF,Appendix 25FA
Paragraphs 1 and 3

Discussion Referenced paragraphs require that the contractor replace vehicles as necessary during the life of the contract. The contractor is also responsible for maintaining these vehicles in a serviceable condition.

Question
Will the contractor be allowed to perform maintenance on contractor-furnished vehicles in the vehicle maintenance facility (Bldg. 293) or must the
maintenance be performed in an off-base facility?
Response
43TechnicalTransportation25FF-1Appendix 25FF25.1.4.3

Discussion During the site visit, we observed numerous carts of various sizes being driven by the incumbent contractor. However, they are not listed in the PWS.

Question
Are these carts maintained by the incumbent contractor and when they are no longer serviceable, who replaces them?
Response
Friday, March 02, 2007Page 20 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
44TechnicalCommunications andPage 5 of 136 ofCLIN Scheule B 0019 and Sub CLINS
Information Technologyand PWS 7

Discussion The Para # in the PWS do match up to the CLINS for Pricing except for 0019AB. 0019AD reference now states reserved and not assigend to Web Services Management. PWS does not have Para 7.1.3 any more it is 7.1.3.a and 7.1.3.b which conflicts with CLIN 0019AC and AE

Question
What are the correct PWS refrences for each SUB CLIN under 0019 and option years? This is needed for correct pricing.
Response
45TechnicalEngineering Services15-1-115-1

Discussion The statement is that CADD (Computer Aided Design and Drafting) be used in all designs.

Question
Is there a specific software program that the installation or AETC requires to be used?
Response
Friday, March 02, 2007Page 21 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
46TechnicalEngineering Services15-1-215.1.1.1.6

Discussion : Paragraph identifies the requirement to attend meetings conducted by the local community.

Question
many or what are the frequency of the local community meetings?
Response
47TechnicalEngineering Services15-215.2

Discussion The performance threshold for suspense’s to be excellent is to be answered prior to six days of the due date. Anticipation is that there will be many suspense’s that will have due dates shorter than six days.

Question
How will the suspense’s with times that will not enable meeting the Outstanding threshold be handled for this performance standard?
Response
Friday, March 02, 2007Page 22 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
48TechnicalEngineering Services15-215.2

Discussion This performance standard identifies an amount to be designed to be considered as Outstanding. There will be occasions where to support the mission that a far larger program will be required.

Question
What is the precept of consideration for this increase in service provided (cost).
Response
49TechnicalEngineering Services15-D-115-D

Discussion Under the column heading ‘Date Due” for the studies and plans, there are several entries with the word “Annual” as the due date.

Question
What is the next due date for this plans and studies after 1 April 2008?
Response
Friday, March 02, 2007Page 23 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
50General1093.5.4
Contracting

Discussion A consistent change throughout the new RFP, compared to the Draft FRP, is that the Basic Year FY08 annual hours per employee changed from 2,096 by 50% to 1,048. This change appears several times in the new RFP but not in paragraph 3.5.4.

Question
Are the Basic Year FY08 annual hours per employee shown in paragraph 3.5.4 correct or incorrect? Shouldn’t they be 1,048 to align with the rest of
the RFP?
Response
51TechnicalApplicable to All2.-1-162.1.23.2.12.3.2.6
Services

Discussion This paragraph states that the service provider shall furnish commercial source items that can be procured by the general public. There are items used in aircraft maintenance, such as engine oil, sealants, etc. that although NSN listed and MIL-Spec’d can be purchased by the general public through the same vendors that the USAF purchase the items. It is our understanding that all products used on aircraft need to be procured through the standard supply system to ensure mil-spec conformance.

Question
Are items that are procured for use on aircraft excluded from this requirement and ordered solely through SBSS, or the Government IMPAC program?
Response
Friday, March 02, 2007Page 24 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
52TechnicalCommunications andAppendix 7B7B-23C&I Training Operations Table
Information Technology

Discussion “COE component training classes.” This section has a quantity of 14 days and a frequency of weekly with duration of 114 hours.

Question
Is the assumption correct that 2 week training is held every week (overlapping of course) or is the frequency supposed to be Bi-Monthly or Monthly?
Response
53TechnicalApplicable to All2.-1-172.1.23.2.12.22.3.3.3
Services

Discussion Paragraph 2.1.23.2.12.2 states that the Service Provider shall provide fuel, oil and lubricants for all service provider vehicles. Paragraph 2.3.3.3 states that the Government will provide gasoline or diesel fuel for Government provided, and service provider vehicles. This paragraph goes on to state that VIL point-of-sale keys are used to preclude their use in support of vehicles not listed in Appendix FF of each section and service provider vehicles not purchased as replacement for these vehicles. Appendix FF lists only 17 special purpose vehicles that are to be provided by the Government. There are many general purpose vehicles that will be required to be procured by the Service Provider specifically execute the contract.

Question
Is it the intent of this PWS that the Service Provider will be required to provide all fuel, oil, and lubricants for its fleet of Service Provider vehicles
unless they are replacements for the 17 vehicles listed in Appendex FF? or Is the intent that the Service Provider will provide oil and lubricants and
the Government will provide Fuel for the Service Providers vehicle fleet?
Response
Friday, March 02, 2007Page 25 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
54TechnicalApplicable to All2.-1-182.1.23.7.1
Services

Discussion This paragraph was added to this PWS revision that introduces the Systematic Management and Reporting Tool (SMART)

Question
Is this a USAF or AETC standard program that will be furnished by the Government, or is this a concept that the Service Provider will have to develop
to meet the requirements that were added in Paragraphs 2.1.23.7.1 thru 2.1.23.7.13?
Response
55TechnicalApplicable to All2.-3-22.3.2.4
Services

Discussion This paragraph states that the Government will maintain and repair equipment leased/rented by the Government, and provided to the service provider…

Question
Is there a listing of equipment that will be leased/rented by the Government and provided to the service provider
Response
Friday, March 02, 2007Page 26 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
56TechnicalAircraft Maintenance3.-1-2

Discussion This paragraph states that AFI 21-101 references other AFI’s and Directives, that will be complied with to the maximum extent practical to perform the required services for aircraft maintenance. There are several directives referenced in AFI 21-101 that are not listed in Appendix 3A, Applicable Publications.

Question
Based on para 3.1.1.3.2, do we assume that directives referenced in AFI 21-101, but not listed in Appendix 3A are to be considered advisory
publications and followed to the “maximum extent practical” to accomplish the requirements of the PWS, but are not mandatory publications?
Response
57TechnicalAircraft Maintenance3.-1-33.1.1.4.9

Discussion This paragraph requires the Service Provider to support any assessment, inspection, exercise, deployment, static display, flyover, incentive flight, open house (airshow), Medical Air Evac, ROTC orientation flight, Civilian Fly-in, or change of Command Ceremony, that involves aircraft and/or maintenance resources. It goes on to state that these events may occur on weekends, or holidays, and the cost associated with these events shall be included in the Target Cost.

Question
Does the workload data specified in paragraph 3BB.2.0 (680 Man-Hours) account for all main-hours expended in support of this paragraph?
Response
Friday, March 02, 2007Page 27 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
58TechnicalAircraft Maintenance3.-1-193.1.22.17.1AETCI 21-105

Discussion This paragraph requires the service provider to provide the monthly logistics indicators report to the Government QAE NLT the fifth calendar day of the next month. This requirement conflicts with the guidance for this report contained in AETCI 21-105. IAW AETCI 21-105, the Logistics indicator data spreadsheet is due by the 7th Calendar day of the next month and the Narratives and Senior Leader’s Comments are due by the 10th Calendar day of the next month.

Question
Was the citing of the 5th calendar day for submission of the monthly logistics indicators report a mistake in the PWS, and should we consider AETCI
21-105 the guiding directive for the report?
Response
59TechnicalAircraft Maintenance3.-1-343.1.27.2.8

Discussion This paragraph requires management of courtesy-stored assets to be included in the self-inspection program for the Munitions Storage Area (MSA).

Question
How much courtesy-stored munitions assets are currently stored in the MSA?
Response
Friday, March 02, 2007Page 28 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
60TechnicalAircraft Maintenance3.-1-353.1.27.3Para 3.1.27.3.1, para3.1.27.6.12,
Appendix 3E, Appendix 3FG.1.8,
Appendix 3I

Discussion It is unclear who, or what agency is intended to fulfill the Munitions Accountable Systems Officer (MASO) responsibilities. The wording in paragraph

3.1.27.3 leads us to believe the MASO is someone other than the Service Provider. For example: para 3.1.27.3.1 states, “The service provider shall:

…Perform those functions that are delegated by the MASO”; para 3.1.27.3.6 states, “The service provider shall: …Forward all count sheets and computer listings to the MASO”; para 3.1.27.6.12 states, “Any changes to the existing method must be approved by the MASO/Chief QA prior to implementation.”

Question
Who is the MASO? Are MASO responsibilities accomplished by the Government or Service Provider?
Response
61TechnicalAircraft Maintenance3.-2-2Note B

Discussion This paragraphs states that: …Fleet time shall not be less than 150 hours for the T-6 …for more than two (2) consecutive or three (3) total months in any contract period. The acceptable Fleet time range for the T-6 is 150 ±10 hours (140 to 160 hours).

Question
Shouldn’t this read, “Fleet time shall not be less than 125 hours…..?
Response
Friday, March 02, 2007Page 29 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
62TechnicalAircraft Maintenance3A-2Table 3A.1PWS Section 2-1, paragraph 2.1.7

Discussion Table 3A.1 lists AFI 91-301, Air Force Occupational and Environmental Safety, Fire Prevention and Health (AFOSH) Program, and AFI 91-302, Air Force Occupational and Environmental Safety, Fire Prevention and Health (AFOSH) Standards, as mandatory publications. Paragraph 2.1.7, however, states that: “The service provider shall establish a safety program for employees IAW OSHA standards. Service provider shall not be required to comply with AFOSH standards except as needed to protect AF resources (facilities to include hangars and industrial areas, equipment, and AF personnel). For flight line operations the service provider shall comply with AFOSH STD 91-100, Aircraft Flight line – Ground Operations and Activities.

Question
Should AFI 91-301 and AFI 91-302 be listed as “advisory publications”, and applicable only as they pertain to protection of AF resources?
Response
64TechnicalApplicable to All2.-1-162.1.23.2.5
Services

Discussion This paragraph states that the Service Provider shall provide all user maintenance for the care, and/or upkeep of all Government-furnished office equipment. According to past practice, the Government provides normal upgrade of furnished ADPE equipment and parts required to repair furnished ADPE (i.e. hard drives, memory sticks, motherboards, power supplies etc.).

Question
Does this requirement extend to the parts required to repair or normal upgrade of Government furnished ADPE?
Response
Friday, March 02, 2007Page 30 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
65TechnicalAircraft Maintenance3.-1-23.1.1.4.1

Discussion This paragraph requires the Service Provider to perform aircraft maintenance operations support (organizational level) for T-1, T-6, and T-38 aircraft at Woodring Regional airport in Enid, Oklahoma and Kegelmen auxiliary field in Jet, Oklahoma as part of every day activities—not considered off-station recoveries.

Question
What are the average annual number of maintenance recoveries accomplished at Woodring Renional and Kegelman Aux Field?
Response
66TechnicalAircraft Maintenance3.-1-53.1.3.4.3

Discussion This paragraph states: Cross-country and deployment aircraft will be launched, normally on Friday and occasionally on Saturday and Sunday. Cross-country recovery will normally be accomplished on Sunday and occasionally on Saturday or holidays. Cost shall be included in Target Cost.

Question
Would the Government provide an estimate of how many Saturdays and holidays annually the service provider should be prepared to launch cross-
country and deployed aircraft and recover cross-country aircraft?
Response
Friday, March 02, 2007Page 31 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
67TechnicalAircraft Maintenance3.-1-193.1.22.15.2Appendix 3FB-Luke

Discussion This paragraph states: “The command has pre-positioned equipment to include a trailer (see Appendix 3FB-Luke) at Luke AFB, AZ to reduce transit time to and from Vance AFB. The service provider shall provide a vehicle capable of safely towing the Government provided trailer with equipment.”

Question
What is the configuration and capacity of the 24 foot trailer listed in appendix 3FB-Luke (goose-neck, enclosed, open, ramps, weight capacity)?
Response
68TechnicalAircraft Maintenance3FBL-13FBL.1

Discussion The listing of equipment stored at Luke AFB shows T-38 equipment, but does not list any equipment for T-1 or T-6 equipment.

Question
Is the Government planning to pre-position T-6 or T-1 equipment (provided by their respective COMBS) at Luke AFB?
Response
Friday, March 02, 2007Page 32 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
69GeneralCBA, pages 47-Article 23.1
Contracting

Discussion The CBA contains unusual criteria concerning pay, in that it identifies minimum and maximum wage rate ranges.

Question
Since union wage rates are typically tied to seniority, in an effort to ensure reasonable wage rate estimates for personnel currently on the program,
would the Government provide a seniority listing?
Response
70Price991.10

Discussion Subcontractors who will perform more than 20% of the work shall provide their price/cost proposal to the prime contractor for inclusion in Volume V, in a sealed package, if desired.

Question
Is it the Government’s intent to include major subs price/cost proposal in the Prime Contractor’s Volume V (Past Performance)? Should major subs
instead include their price/cost proposal in the Prime Contractor’s Volume VI (a) and/or (b)?
Response
Friday, March 02, 2007Page 33 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
71General81Section IDFAR Clause 252.211-7003
Contracting

Discussion Department of Defense Instruction 5000.64 mandates that the following tangible items are marked with an item unique identifier (UID):Items with an acquisition cost of over $5,000; tems that are currently serially managed; Items that are sensitive or classified;Property that is furnished to third parties, particularly U.S. Government contractors.

Question
(a) Is the Vance services contract already compliant with UID? (b) Will any additional equipment be required by the contractor?(c) Will the
Government include a CLIN for UID cost recovery?
Response
72Price991.10

Discussion The offeror shall submit one complete hard copy of all price/cost files as Volume VI(a). The offeror should limit the cost/price volume VI(b) to 2 (two) three inch binders, not including major subcontractors, principals, joint venture partners or other individual companies, and one 2 inch binder for major subcontracts.

Question
To show sufficient detail to ensure cost realism, would the Government consider increasing the binder size requirement for major subcontractors?
Response
Friday, March 02, 2007Page 34 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
73Price99 & 1191.105.3

Discussion Section L, Paragraph 1.10 states, “The price/cost proposal (Volume VI(a) and Volume VI(b)) shall be prepared in accordance with these instructions and Paragraph 5 of this section…….”. This paragraph also states, “Volume VI(b) shall include the completed cost model at Attachment 6”, and that Volume VI(b) shall be limited to two three inch binders, etc.Paragraph 5 provides instructions for Volume VI(a), but does not mention Volume VI(b).

Question
Would the Government add instructions to paragraph 5 for Volume VI(b) to address the following questions?(a) Is the completed Government Cost
Model (Attachment 6) required in both Volume VI(a) and VI(b)?(b) Is the completed Schedule B required in both Volume VI(a) and VI(b)? (c) Is
supporting cost detail required in both Volume VI(a) and VI(b)? (d) Is a completed Manpower Matrix required in both Volume VI(a) and VI(b)?(e)
Does “The offeror should limit the cost/price volume VI(b) to 2 (two) three inch binders” equate to six inches of total binder space?
Response
74GeneralAttch 13, all pagesColumn B
Contracting

Discussion The following cells contain reference errors: B3, B5, B7, B9, B11, B13, B15, B17, B19, and B21

Question
Will the Government please make changes to the aforementioned cells and release an amended Subcontracting Plan Worksheet?
Response
Friday, March 02, 2007Page 35 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
75GeneralSection G, page 651
Contracting

Discussion

Question
Please clarify contract “one combined invoice and receiving report” thru WAWF. Is the FPIF 1/12th invoice to be processed on a DD250?
Response
76TechnicalAircraft Maintenance3.-1-413.1.28.1

Discussion This paragraph states that QA Inspectors will not perform maintenance or be augmentees to other work centers. The Service Provider may need to have the flexibility to use the QA personnel in maintenance tasks during contingency or emergency circumstances (i.e. Hurricane Evacuation). Also, certain maintenance-type tasks are normally accomplished by QA (i.e. Weight & Balance Technician/Supervisor, etc.). In addition, the Service Provider may need the flexibility to temporarily detail a qualified QA inspector to fill a critical specialty shortage in another classification (as permitted by the CBA) due to unforeseen circumstances until the shortage can be rectified through new-hires, transfers, or the individual can be returned to work.

Question
Can the statement restricting QA Inspectors from performing any maintenance either be removed altogether, or modified to exclude the types of tasks
mentioned above?
Response
Friday, March 02, 2007Page 36 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
78PastAttachment 8,F.
Performance

Discussion Requirement: “For Government contracts, provide current information on all three individuals.” However, the format of the Past Performance Information Sheet only appears to require two points of contact (although three may be provided if one were to exercise the option to include the QA person and the Site Manager):1 Quality Assurance Person and/or Site Manager2 Administrative Contracting Officer.

Question
Please clarify the number and titles of the customer points of contact required.
Response
79PastAttachment 8,H.
Performance

Discussion This Item requires discussion of the cited contract’s relevance to Mission Capability Subfactor 4, Small Business Subcontracting Plan and SDB Participation Targets. This would appear to duplicate the information requested in Items J and K.

Question
Please clarify the distinction among each of the requirements:Item H., response to Subfactor 4Item J., Compliance with Utilization of Small
Business ConcernsItem K., Subcontracting Plan requirements
Response
Friday, March 02, 2007Page 37 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
80PastSection L, page4.1.4
Performance

Discussion This section says that offerors may discuss efforts to resolve problems on prior contracts, but Section 4.1, Contents, does not provide direction for where in the Past Performance Volume offerors are to include this discussion.

Question
Please clarify whether responses to Resolution of Problems should be addressed in the individual Past Performance Information Sheets or as a separate
section within the Past Performance Volume.
Response
81GeneralSection L, page 971.81.12
Contracting

Discussion The RFP section L1.8 states that a complete Manpower Matrix shall be included in every Volume of the technical proposal. Our assumption is that the manpower matrices are to be included only in Technical Volumes 2 and 3, as shown in the table on page 98 and as described in paragraph 1.12, not in Volume 1.

Question
Is a Manpower Matrix required to be included in Technical Proposal Volume 1, Mission Integration, and if so, is the matrix excluded from the page
count?
Response
Friday, March 02, 2007Page 38 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
82TechnicalApplicable to All2.-1-92.1.13.4Figure 2A.1.2
Services

Discussion Paragraph 2.1.13.5 directs Records to be managed IAW AFMAN 37-123, Management of Records. This reference has been removed from the publications listing in Appendix 2A (PWS figure 2A.1.2)

Question
Suggest you add AFMAN 37-123 to Appendix 2A or remove the reference from paragraph 2.1.13.5.
Response
83TechnicalTransportation25FF-1 – 25FF-4Paragraph 1 and 3

Discussion The following vehicles will be initially provided as Government Furnished Equipment (GFE) but will be removed from use and not replaced by the Government during the life of the contract. In accordance with (IAW) AFI 23-302 (30 Jun 06), Section 4J, paragraph 4.52.3.1. “The contractor(s) will assume sole responsibility for all associated utilization costs of GFE vehicles, including: operations, maintenance and repair, and replacement. The contractor(s) will determine replacement based on best business practices/replacement criteria.”

Question
(a) Is it the Government’s intent for the contractor to purchase vehicles during the term of this contract?(b) If the contractor is required to purchase
replacement vehicles, will the Government accept used vehicles, or are new vehicles required?(c) Will the Government or will the contractor retain
title to the replacement vehicles?(d) Will the Government provide further clarification by means of a vehicle removal schedule, i.e., the projected year
each vehicle will be removed from use?(e) Will the Government further define “Vehicle Type” and “Vehicle Equivalent” as presented in Appendix?
(f) Does “Price” represent original acquisition price or current replacement price?
Response
Friday, March 02, 2007Page 39 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
84GeneralCBA, pages 151-Appendices E, F,
Contractingand G

Discussion The Service Contract Act (SCA) requires the successor contractor to provide wages and fringe benefits no less than those provided for by the predecessor contractor CBA in the first year of the contract. It is customary for the incumbent contractor to provide minimum health and welfare rates to ensure SCA compliance.

Question
(a) Minimum Health and Welfare (H&W) rates were not identified in any of the incumbent Employee Benefit Plans in the CBA. Will the Government
provide minimum H&W rates applicable to this solicitation?
Response
85GeneralCBA, pages 151-Appendices E, F,
Contractingand G

Discussion The Service Contract Act (SCA) requires the successor contractor to provide wages and fringe benefits no less than those provided for by the predecessor contractor CBA in the first year of the contract. It is customary for the incumbent contractor to provide minimum health and welfare rates to ensure SCA compliance.

Question
(b) In order to estimate comparable/reasonable benefits, will the Government provide a Summary Benefit Plan Description currently provided to service
employees working on the program?
Response
Friday, March 02, 2007Page 40 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
86GeneralCBA, pages 151-Appendices E, F,
Contractingand G

Discussion The Service Contract Act (SCA) requires the successor contractor to provide wages and fringe benefits no less than those provided for by the predecessor contractor CBA in the first year of the contract. It is customary for the incumbent contractor to provide minimum health and welfare rates to ensure SCA compliance.

Question
(c) In order to estimate comparable/reasonable benefits, will the Government provide employee group insurance participation data?
Response
87GeneralCBA, pages 151-Appendices E, F,
Contractingand G

Discussion The Service Contract Act (SCA) requires the successor contractor to provide wages and fringe benefits no less than those provided for by the predecessor contractor CBA in the first year of the contract. It is customary for the incumbent contractor to provide minimum health and welfare rates to ensure SCA compliance.

Question
(d) Will CBA employees that choose not to participate in a benefit plan receive cash in-lieu of benefits?
Response
Friday, March 02, 2007Page 41 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
88GeneralCBA, pages 151-Appendices E, F,
Contractingand G

Discussion The Service Contract Act (SCA) requires the successor contractor to provide wages and fringe benefits no less than those provided for by the predecessor contractor CBA in the first year of the contract. It is customary for the incumbent contractor to provide minimum health and welfare rates to ensure SCA compliance.

Question
(e) In order to estimate comparable/reasonable benefits, will the Government provide a copy of the CBA Supplement to include any and all
Memorandums of Understanding?
Response
89TechnicalPurchasing26-1-126.1 THRU 26.1.1.6

Discussion This section requires the service provider to have and submit an approved purchasing system to the ACO within 15 days after contract award. All requirements on page 26-1-1 require the service provider to get approval from the ACO for all actions described.

Question
What is the advantage of having an approved purchasing system, if these actions are required?
Response
Friday, March 02, 2007Page 42 of 281
IDRequest ForPerformance WorkPageParagraphAdditional Cross Reference
ProposalStatementReferenceReference
90GeneralSection L, 1023.2.4.1.1
Contracting

Discussion There is a requirement to show number and percentages of: direct, additive direct, indirect, and overhead labor.

Question
What is the definition of additive direct labor?
Response
91TechnicalAirfield Management21FF-121FF.1AFI 13-213, Para. 3.6

Discussion Appendix 21FF Airfield Management Government Furnished Property and Services (Vehicles) states none are provided.

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
FBOawardannouncement.doc DOC document
2515TransportationGFPVehiclesRemovalAppendix25FF12Sep07A0008.pdf PDF
MemoforallOfferors-unioninfo.doc DOC document
0305AVNCAircraftMaintenanceWorkloadAppendix3BA23Aug07A0007.pdf PDF
0702VNCCommunicationInformationServiceSummary7-2A007.doc DOC document
0705VNCCommunicationInformationWorkloadAppendix7BA0007.doc DOC document
0701VNCCommunicationInformation7-1A0007(3).doc DOC document
afi21-101_aetc.pdf PDF
afi21-303_aetc.pdf PDF
2612VNCPurchasingGFPNonEAIDAppendix26FCA0005.pdf PDF
FA3002-06-R-0003-0005.doc DOC document
TOAnnouncement.doc DOC document
1601VNCEnvironmentalDescriptionofServices16-1A0004.pdf PDF
2800VNCChangestoCommunityServicesA0004.pdf PDF
Attachment1 PWSSection1704EnergyandUtilMgmtPublicationsAppendix1 —
Attachment1 PWSSection13Grounds SiteMaintenance.zip ZIP file
Attachment1 PWSSection1904VNCCustodialPubsAppendix19AA0003.pdf PDF
FA3002-06-R-0003-0003.doc DOC document
FA3002-06-R-0003-0002.doc DOC document
Pre-ProposalConference-AttendeeList.pdf PDF
VanceSiteVisitIntroSlides(21FEB07).ppt PPT presentation
AirfieldMgtSiteVisit.PPT PPT presentation
FuelsMgtSiteVisit.PPT PPT presentation
LifeSupportSiteVisit.ppt PPT presentation
AircraftMaintenanceSiteVisit.ppt PPT presentation
04VanceMissionCapabilityFactors25Feb07V3.ppt PPT presentation
PPconfchange.doc DOC document
FA3002-06-R-0003 Atch7 Amend1.doc DOC document
1_28CommunityServices.zip ZIP file
1_02ApplicableToAllServices.zip ZIP file
FA3002-06-R-0003 Atch6.xls XLS spreadsheet
1_06AircrewLifeSupport.zip ZIP file
1_27Lodging.zip ZIP file
1_25Transportation.zip ZIP file
RFPreleasenotice.doc DOC document
RFI_DRAFTREQUESTFORPROPOSAL.doc DOC document
02ApplicableToAllServices.zip ZIP file
SampleCommentQuestionform.doc DOC document
24Fuels.zip ZIP file
28CommunityServices.zip ZIP file
NewVanceBOSIndustryDay07.zip ZIP file
Custodial.zip ZIP file
0702VNCCommunicationInformationServiceSummary7-2.doc DOC document
Vanceagenda.ppt PPT presentation
RFIDraftPWS182627.doc DOC document
PublishAttendees Subs.xls XLS spreadsheet
QuestionFormDraftPWS.doc DOC document
07Mar06_RFIDraftPWS.doc DOC document
3Feb06_SpecialNotice.doc DOC document
16Dec05_CorrectedDisclaimer.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .