0702VNCCommunicationInformationServiceSummary7-2.doc

DOC document 42 KB Posted

Attached to
Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services Federal contract opportunity
Solicitation number
FA3002-06-R-0003
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

VNC Comm Info Service Summary

View the file

Other files for this federal contract opportunity

Other files attached to Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services, newest first.
File Type Posted
1_MemoforallOfferors-unioninfo.doc DOC document
0705VNCCommunicationInformationWorkloadAppendix7BA0008.pdf PDF
1315VNCGroundsandSiteGFPVehiclesAppendix13FF12Sep07A0008.pdf PDF
2515TransportationGFPVehiclesAppendix25FF23Aug07A0007.pdf PDF
VanceCostModel-8-28-07.xls XLS spreadsheet
605VNCLifeSupportMgtWorkloadAppendix6B23Aug07A0007.pdf PDF
2611VNCPurchasingGFPEAIDAppendix26FBA0005.pdf PDF
2605VNCPurchasingWorkloadAppendix26BA0005.pdf PDF
2614VNCPurchasingGFPADPEAppendix26FEA0005.pdf PDF
2616VNCPurchasingGFPTrainingAppendix26FGA0005.pdf PDF
1619VNCEnviromentalManagementSpecialRequirementsAppendix16IA0004 —
0705BVNCCommunicationInformationWorkloadAppendix7BB29Mar07A0004. —
1901VNCCustodialDescriptionofServices19-1A0004.pdf PDF
0214ApplicabletoAllServicesAppendix2FEADPE16Mar07A0004.pdf PDF
RFPconformedamend3.doc DOC document
1703VNCEnergyandUtilMgmtGeneralInformation17-3A0004.pdf PDF
1100VNCCommunicationsInformationServicesA0004.pdf PDF
1900VNCCustodialSummaryofChangesA0004.pdf PDF
0200VNCChangestoApplicabletoAllServicesA0004.pdf PDF
Attachment1 PWSSection7Communication InformationSupport.zip ZIP file
MasterToolList.rtf RTF text file
cbaannouncement.doc DOC document
VanceRFPQuestionsandResponses16Mar07.rtf RTF text file
FedTeDSinfo.doc DOC document
Vance-CBABreakout-031407.xls XLS spreadsheet
VanceRFPPastPerformanceQuestionsandResponses6Mar07PP.rtf RTF text file
01VancePreProposalAllServices16Feb07.ppt PPT presentation
ITSiteVisit.ppt PPT presentation
PurchasingSiteVisit.ppt PPT presentation
06VanceRFP.ppt PPT presentation
FA3002-06-R-0003 Atch11wxls.doc DOC document
FA3002-06-R-0003-0001.doc DOC document
FA3002-06-R-0003.doc DOC document
FA3002-06-R-0003 Atch14.pdf PDF
1_12SpaceManagement.zip ZIP file
1_23Supply.zip ZIP file
07CommunicationsandInformation.zip ZIP file
26Purchasing.zip ZIP file
RFP24Aug.doc DOC document
18FireDept.zip ZIP file
03AircraftMaintance.zip ZIP file
06AircrewLifeSupport.zip ZIP file
11OperationsandMaintenance.zip ZIP file
VanceIndustryDayAcftMX14Mar06.zip ZIP file
SlidesFromVanceIndustryForum.doc DOC document
EnidRestaurants.doc DOC document
Lodging.zip ZIP file
Full Open.doc DOC document
5PWSZIPFILES.zip ZIP file
PostedConformedVanceSOW.zip ZIP file
Show all 50

Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final Draft 6 March 2006

FA3002-06-R-0003

SECTION 7-2

7.2. SERVICE DELIVERY SUMMARY

Performance Objective
Performance Threshold
1. Ensure high customer satisfaction for each service area.
Maintain a rating of 4.0 or higher rating on customer satisfaction survey.
2. Ensure prompt and accurate closeout of C&IT projects and transfer ownership of the end product to the using organization.
C&IT projects will be transferred no later than 14 calendar days after completion of the last implementation action associated with that project 95% of the time.

3. Ensure prompt notification and delivery to recipients of DMS messages, from the base distribution point (BDP) account, based on their precedence levels, within the time limits shown: Flash: As fast as humanly possible; objective: within 10 minutes

Immediate: within 30 minutes

Priority: within 6 hrs

Routine: within prior to start of next business day Delivery and notification shall be accomplished within listed priority times 100% of the time.

4. Ensure prompt resolution of problems received by the Help Desk.
95% of all trouble calls shall be resolved within 72 hours of notification unless other wise specified.
5. Ensure core services critical to mission accomplishment are operational. Core services under control of the service provider: network infrastructure equipment from the Information Transfer Nodes to the end user.
Critical core services shall be available and operational at a rate of 99.6% or greater
6. Ensure all LMR assets are tracked under TRS and accounts are decertified, inventoried, properly documented and reported.
All assets will be entered into TRS and accounts correctly documented 100% of the time.
7. Provide Base Locator Assistance for all incoming calls.
4 or less valid customer complaints per month
8. Ensure response to and correction of all telephone switching alarms, fire alarms, base intrusion alarms, base alert sirens, system alarms within established time lines
Critical problems (15% of trunks down, total loss of base telecom, loss of one T-1 line) will be corrected within 2 hours.

Major problems (10% of trunks down) will be corrected within 8 hours Minor problems (5% of trunks down) will be corrected within 2 business days

9. Ensure troubleshooting and corrective action on telephone and wire troubles are accomplished within established time lines.

Priority (P1) troubles shall have maintenance in progress within one hour

Routines (P3) shall have maintenance in progress within two business days.

10. Customers have timely access to publications and forms.
Not more than 2 valid customer complaint per month
11. Notification of OPRs on pubs and forms annual reviews.
Notification of OPR 1 month prior, 100% on time.
12. Compliance with higher HQ/downward directed taskings.
Compliance with taskings 100% of the time.
13. Ensure Multimedia work orders are accomplished within established time lines.
Priority 1 (24 hours or less) Examples are: Aircraft mishaps, law enforcement incidents, maintenance unsatisfactory reports, ground accidents, etc.

Priority 2 (2-3 workdays) This priority covers mission essential projects that have a short suspense and cannot be categorized as a priority three or four.

Priority 3 (4-5 workdays) This priority consists of routine over the counter requests.

Priority 4 (5-10 workdays) This priority consists of large routine or updated training material and over the counter requests.

14. Telephone switch availability.
Telephone switch shall be available and operational at a rate of 99% or greater
15. Suspense tracking and completion.
All suspenses will be met with a 98% or greater rate
16. Ensure accurate mail distribution.
2 or less mispitched mail items per month
17. Respond to 4 individual workstation/laptop troubles at once.
No more than 3 customer complaints per month

VANCE AFB

COMMUNICATIONS & INFORMATION

7-2-1

File details come from the government source that posted it. Updated .