04VanceMissionCapabilityFactors25Feb07V3.ppt

PPT presentation 1 MB Posted

Attached to
Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services Federal contract opportunity
Solicitation number
FA3002-06-R-0003
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Mission Capability Subfactors

View the file

Other files for this federal contract opportunity

Other files attached to Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services, newest first.
File Type Posted
1_MemoforallOfferors-unioninfo.doc DOC document
0705VNCCommunicationInformationWorkloadAppendix7BA0008.pdf PDF
1315VNCGroundsandSiteGFPVehiclesAppendix13FF12Sep07A0008.pdf PDF
2515TransportationGFPVehiclesAppendix25FF23Aug07A0007.pdf PDF
VanceCostModel-8-28-07.xls XLS spreadsheet
605VNCLifeSupportMgtWorkloadAppendix6B23Aug07A0007.pdf PDF
2611VNCPurchasingGFPEAIDAppendix26FBA0005.pdf PDF
2605VNCPurchasingWorkloadAppendix26BA0005.pdf PDF
2614VNCPurchasingGFPADPEAppendix26FEA0005.pdf PDF
2616VNCPurchasingGFPTrainingAppendix26FGA0005.pdf PDF
1619VNCEnviromentalManagementSpecialRequirementsAppendix16IA0004 —
0705BVNCCommunicationInformationWorkloadAppendix7BB29Mar07A0004. —
1901VNCCustodialDescriptionofServices19-1A0004.pdf PDF
0214ApplicabletoAllServicesAppendix2FEADPE16Mar07A0004.pdf PDF
RFPconformedamend3.doc DOC document
1703VNCEnergyandUtilMgmtGeneralInformation17-3A0004.pdf PDF
1100VNCCommunicationsInformationServicesA0004.pdf PDF
1900VNCCustodialSummaryofChangesA0004.pdf PDF
0200VNCChangestoApplicabletoAllServicesA0004.pdf PDF
Attachment1 PWSSection7Communication InformationSupport.zip ZIP file
MasterToolList.rtf RTF text file
cbaannouncement.doc DOC document
VanceRFPQuestionsandResponses16Mar07.rtf RTF text file
FedTeDSinfo.doc DOC document
Vance-CBABreakout-031407.xls XLS spreadsheet
VanceRFPPastPerformanceQuestionsandResponses6Mar07PP.rtf RTF text file
01VancePreProposalAllServices16Feb07.ppt PPT presentation
ITSiteVisit.ppt PPT presentation
PurchasingSiteVisit.ppt PPT presentation
06VanceRFP.ppt PPT presentation
FA3002-06-R-0003 Atch11wxls.doc DOC document
FA3002-06-R-0003-0001.doc DOC document
FA3002-06-R-0003.doc DOC document
FA3002-06-R-0003 Atch14.pdf PDF
1_12SpaceManagement.zip ZIP file
1_23Supply.zip ZIP file
07CommunicationsandInformation.zip ZIP file
26Purchasing.zip ZIP file
RFP24Aug.doc DOC document
18FireDept.zip ZIP file
03AircraftMaintance.zip ZIP file
06AircrewLifeSupport.zip ZIP file
11OperationsandMaintenance.zip ZIP file
VanceIndustryDayAcftMX14Mar06.zip ZIP file
SlidesFromVanceIndustryForum.doc DOC document
EnidRestaurants.doc DOC document
Lodging.zip ZIP file
Full Open.doc DOC document
5PWSZIPFILES.zip ZIP file
PostedConformedVanceSOW.zip ZIP file
Show all 50

Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Develop America's Airmen Today ... for Tomorrow

Mission Capability Evaluation Factors Aircraft Maintenance and Base Operating Support 71st Flying Training Wing Vance AFB OK

Air Education and Training Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Mr. Keith Berger Program Manager

HQ AETC/A4PM

Subfactor 1 Mission Integration Approach that demonstrates capability to integrate all functional areas in support of the mission of the 71st Flying Training Wing

Favorable assessments will consider the benefit, impact, and feasibility of additional commitments by the offeror to provide higher output, capability, and quality, or exceed performance thresholds identified in the PWS

Subfactor 1 (Cont)

The assessment will be based on the following:
Management approach and methodology for supporting the mission of the 71st Flying Training Wing
Management team will ensure all functional areas work in unison to meet or exceed the Air Force expectations of professional, timely, and quality services, products, and workmanship over the life of the contract
Approach and methodology for the realism of proposed continuous process improvement and innovation in terms of quality, cost, and timeliness

Subfactor 1 (Cont)

Methodology and approach to mobilize/changeover the services in all functional areas without negatively impacting the flying training mission at Vance AFB, OK
Approach and methodology for collective bargaining agreements

Contingencies to ensure it will effectively prevent interruption of services due to labor disruption and disputes or call-up of reservists by executive order Declaration statement that acknowledges and accepts, without exception, all performance work statement requirements

Subfactor 2 Flight Operation Support Approach that demonstrates capability to support flight operations (aircraft maintenance, aircrew life support, and airfield management)

Management Concept. The Government will assess the Offeror’s approach and methodology for

Aircraft maintenance support e.g., flightline operations, scheduled and unscheduled maintenance, and backshop maintenance functions to include PMEL and munitions

Subfactor 2 (Cont)

Reasonable and effective staffing
Approach for disabled Cross Country assigned and non-assigned aircraft support
Approach for execution of the daily flying and maintenance schedules and maintenance activities to include plans for sufficient numbers of mission capable aircraft to support the wing’s flying training mission
Approach for determining flying hour and Average Possessed aircraft monthly adjustment rates

Subfactor 2 (Cont)

Effective aircrew life support for three diverse military training airframes (T-1A, T-6, and T-38) during all hours of flying operations to include equipment inspection and maintenance practices
Effective airfield management activities to include Vance AFB and Kegelman auxiliary airfield
Plans for supplies and materials to ensure they realistically meet the requirements of the PWS
Anticipated significant contract performance challenges and proposed solutions to expected problems to ensure they are plausible

Subfactor 2 (Con’t)

Workforce Staffing
Staffing rationale including the process used to determine required manpower to support all PWS areas and ensure professional and timely quality of services, products, and workmanship. The Government will evaluate:
Workforce staffing placement and associated skill levels for the basic period and all option periods to include:
Number and percentage of direct, additive direct, indirect, and overhead labor

Marginal levels of workforce certification could indicate a lack of understanding concerning mission requirements and may result in the offeror receiving an unfavorable rating and/or being eliminated from the competitive range

Subfactor 2 (Cont) Approach and methodology to meet cyclic and unique situations including the ability to meet peak workloads; overlapping or simultaneous taskings at Vance AFB such as weather to include high winds, lightning, hail and tornadoes; priority transient alert support; plastic media blast for other organizations; base exercises; aging fleet; aircraft deicing; quiet hours; and increased off-station aircraft recovery

Note: Plastic media blast reference will be removed

Subfactor 2 (Cont)

Organizational structure and rationale
Plans to back up “one deep” positions without degrading services and quality of workmanship in the affected service area or other areas
Approach and methodology for workforce mobilization/changeover
Procedures to ensure a properly trained, qualified, and/or certified workforce throughout the life of the contract

Subfactor 2 (Cont)

Performance Management
Internal and external approaches and processes to ensure quality work, service, support, and products are provided that meet or exceed the Air Force’s expectations
Approaches and processes to meet or exceed the Government’s quality expectations
Includes government funding cost controls, protection and management of government resources, and environmental pollution prevention

Subfactor 2 (Cont)

Internal process to identify and prevent deficiencies in the quality of service and meet or exceed Government quality expectations
Internal process to expeditiously apply and monitor corrective actions and ensure successful and timely problem resolution
System(s) for recording, computing, and accessing performance measurement data that the offeror and the Government can use for analysis and decision making
Corporate management approach to identify negative trends and implement corrective actions to meet or exceed Government expectations (e.g., Wing, 19th AF and HQ AETC) and performance thresholds

Subfactor 3

Base Operation Support, Part 1, Civil Engineering
Approach that demonstrates capability to provide Base Operations Support (Operations and Maintenance, Fire Protection, Environmental, Ground and Site Maintenance, Engineering Services, Energy and Utility Management, Custodial, Housing Management, and Space Management)
Base Operation Support, Part 2, Logistics/Services Approach and methodology for:
Supply, Fuels, Transportation, Purchasing, Community Service, and Lodging

Subfactor 3 Base Operation Support, Part 3, Communication and Information Technology

Approach and methodology for supporting management, maintenance, and budgeting of all enterprise services, telecommunications, base multimedia, and information management

Subfactor 3 (Cont)

Workforce Staffing
Staffing rationale including the process used to determine required manpower to support all PWS areas and ensure professional and timely quality of services, products, and workmanship

Same as Flight Operations Support

Subfactor 3 (Cont)

Workforce staffing placement and associated skill levels for reasonableness and effectiveness for the basic period and all option periods to include:
The proposed number and percentage of direct, additive direct, indirect, and overhead labor
Nonproductive time as it is related to the PWS requirements
Explanation and rationale of any manpower adjustments beyond contract start date

If workforce (manpower) increases or decreases please show us how you determined the increase or decrease and the positions affected

Subfactor 3 (Cont)

Approach and methodology to meet cyclic and unique situations including the ability to meet peak workloads; overlapping or simultaneous taskings at Vance AFB such as weather to include high winds, lightning, hail and tornadoes; priority transient alert support; plastic media blast for other organizations; and base exercises aging fleet; aircraft deicing; quiet hours; and increased off-station aircraft recovery
Organizational structure and rationale
Plans to back up “one deep” positions without degrading services and quality of workmanship in the affected service area or other areas

Note: References to plastic media blast, aging fleet, aircraft deicing, quiet hours, and increased off-station aircraft recovery will be removed from Subfactor 3

Subfactor 3 (Cont)

Approach and methodology for workforce mobilization/changeover
Procedures to ensure a properly trained, qualified, and/or certified workforce throughout the life of the contract

Marginal levels of workforce certification could indicate a lack of understanding concerning mission requirements and may result in the offeror receiving an unfavorable rating and/or being eliminated from the competitive range

Subfactor 3 (Con’t) Performance Management

Internal and external approaches and processes to ensure quality work is performed by its employees, and quality service, support, and products are provided that meet or exceed the Air Force’s expectations

Same as Flight Operations Support

Subfactor 4

Small Business Subcontracting Plan and SDB Participation Targets
If a subcontracting plan is required by FAR 19.7, the minimum requirement for small business participation is met when the subcontracting plan and proposal demonstrate the following:
A corporate commitment between parties in providing subcontracting opportunities for small businesses, small disadvantaged businesses, HUBZone small businesses, women-owned small businesses, veteran-owned small businesses, service disabled veteran-owned small business concerns and HBCU/MIs

Subfactor 4 (Con’t)

The offeror demonstrates, as a minimum, compliance with Air Force Goals.
Small business23%
Small disadvantaged5%
Woman owned5%
HUBzone3%
Veteran owned3%
Service disabled veteran owned3%

Realistic (achievable) targets expressed in dollars and in percentages of the total proposed subcontracting dollars for each category above, as well as in dollars and percentages of the total value of the contract for each category above

Subfactor 4 (Con’t)

Compliance with requirements of FAR 52.219.8 and FAR 52.219.9 and in meeting past contract subcontracting plan goals, as evidenced in the SF 294/295s
If a subcontracting plan is NOT required by FAR 19.7, the minimum requirement for small disadvantaged business targets is met when small businesses submit the following information for the full and open competition:
A commitment between parties to provide subcontracting opportunities for small disadvantaged businesses
As a minimum, compliance with Air Force goal of 5% for small disadvantaged businesses expressed in dollars and in percentages of the anticipated subcontracting dollars for the authorized NAICS Industry Subsectors

Subfactor 4 (Con’t)

Realistic (achievable) targets for the SDB Participation Program expressed in dollars and percentages of anticipated total contract value for the authorized NAICS Industry Subsectors with respect to SDB participation, in accordance with FAR 19.12
Evidence of past performance that complied with the requirements of FAR 19.12 and achievement of past contract small disadvantaged business goals

Technical Proposal

What Makes a Good Proposal
Tell us the
HowYour technical approach
Who and how manyYour workforce
WhatThe services you will provide
When(If applicable)

Note: Technical and Cost proposals must match

Favorable assessments will consider the benefit, impact, and feasibility of additional commitments by the offeror to provide higher output, capability, and quality, or exceed performance thresholds identified in the PWS

UNKNOWN-0.ppt

Contracting / Most Efficient Organization (MEO) Perspective

Col Teresa Dicks

AETC/LG

Air Education and Training Command

POCs: Maj Rese Farrish, HQ AETC/LGCM, DSN: 487-2816 (Primary)

Mr Keith Berger, HQ AETC/LGP, DSN: 487-3121 (Alternate)

MEO

Contractor

In-House (Mil/Civ)

Who Supports Our Mission

Sim MX/Instruction

Sim MX/Instruction

Survival School

A/C Wash

512 SOS

Sim MX/Instruction

ERRC

CE, A field,V ops

Sim MX/Instruction

21 FS

Rg MX; Sim MX/ Inst.

Sim MX

Sim MX/ Inst.

Backshop

CE

OPR: LGCQ

Base A/C MX Trans Alert Supp Trans Fuels Ops BOS

Altus

Columbus

Fairchild

Ft. Rucker

Goodfellow

Keesler Trainer MX/PMEL

Kirtland ATARS School

Lackland Trainer MX

Laughlin

Little Rock

Luke

Maxwell PMEL

Moody Sim MX/ Inst.

Pensacola

Randolph AIS SIM MX

Sheppard

Tyndall Sim MX/ Inst & AMB MX

USAFA AFS

Vance Sim MX/Instruction

Contract Cost Creep

Monitor and Control it

AETC service contracts represent $1B in “Must Pay” Bills

We’ve paid for a level of service—any changes will cost money—money that we may not have

Arbitrary or unnecessary changes cost $$$ and the contractor may ask for equitable adjustment

Changes in average sortie duration (ASD)

Abrupt changes in weekly/daily flying schedule

Additional CAP and spare requirements

Increase in cross country support

Changes cost money

Most Efficient Organization

A “Contract” Also

Most Efficient Organizations

Must operate within the Work Statement to include meeting contract performance standards

Cannot take on additional requirements (work) without modification to work statement

Like contracts -- Funding and new authorizations must be approved before new requirements can be implemented

Post MEO review conducted by AF Audit agency

Validation of proposed labor requirements (cost) and compliance with performance standards

MEO’s and Contracts work the same way

“pay as you go”

Example Contract Cost Structure

Target Cost

T-1A $ 3,579,922.25

T-37 $ 6,465,021.89

T-38 $ 6,103,928.59

Other Target Cost (Includes management, HR, QA, P&S, Training, MOC, PMEL,TA) $ 3,750,693.22

Total Target Cost $19,899,565.95

Total Target Profit (2.0% of Target Cost) 397,991.32

Total Target Price $20,297,557.27

Ceiling Price (103% of Target Cost) $20,496,552.93

Award Fee Pool (6% of Total Target Cost) $ 1,193,973.96

Award Fee – Powerful Motivator

In a capitalist environment, money tends to influence people to improve quality, responsiveness and productivity

Through positive management, contractors can increase profit potential

Rewards contractor for exceeding command expectations

Emphasizes key areas of management concern

Award Fee

FDO controls large percent of the contractors profit

Contractor profit 2% + a possible 6% award fee

Example: $447,913 profit + $1,185,855 award fee

Profit is paid automatically – contractual requirement

Award fee dollars are not a given – must be earned

Award fee is earned for exceeding stakeholders (internal and external) expectations

Do award for exceptional service – Quality, timeliness, and in a professional manner

Pitfalls to Avoid

Routinely rewarding contractors (via award fee) for just meeting contract requirements

Becoming sympathetic to low profit margins

Being too generous -- losing your award fee incentive power to influence behavior and motivate them to embrace continuous process/performance improvement

“We make money the old fashion way” – “We earned it”

Smith-Barney “80s famous line”

Award Fee Components

40% Technical Operations

Sufficient aircraft to support wing’s flying mission

MC, TNMCM, fleet time, FOD

AGE, PMEL, TA, survival equipment, munitions, MOC support

40% Program Management

Productivity Improvement

Technical evaluations/training

Top management involvement

QC, plans and programs

Flight line operations, corrosion control, aircraft cleanliness, cross country support

20% Efficient Use of Govt Resources

Reduce O&M cost

Resource Mgt

Env & Haz waste Mgt

Award Fee Process

Aircraft Maintenance Chief QAP / QAE

Contractor RecommendationBriefing

Award Fee Review Board

(AFRB)

Aircraft Maintenance QAP / QAE

Wing Commander:

Chairperson and Fee Determining Official (FDO)

CV, OG/CC, MXG/CC, MSG/CC Voting Members

Contracting Officer is Secretariat and a Non-Voting Member

Award Fee

It’s About Performance

As performance and services increase, award fees should increase

As performance and services decrease, award fees should decrease

Several companies share award fee earnings with employees – encouraged by Air Force leadership

Award Fees build cooperation and participation while focusing on the mission

Award Fees / Performance

Though performance may decrease, events beyond contractors control may still warrant an award fee

Weather related; e.g., ice storms, wind/hail damage

Absence of government provided parts and services

Award fee should reflect

Achievement of Air Force and Command awards

Superior support for special events; e.g., airshows, open house, VIP visits, etc.

Performance / Award Fee Trends

Example

Superior support during ice storm and command awards

Maintenance work areas need management attention; e.g., TO upkeep, tool control, supply management, etc.

Superior performance during contractor changeover

Carrot or Stick?

Why Unions?

Profit margins are low for service contracts (2%)

Dept of Labor (DoL) establishes prevailing wage rates and benefits—with little to no increase each year

If the contractor increases wage rates outside of DoL adjustments, increases comes out of the Contractor’s pocket

A Union derived CBA produces better wages and benefits than DoL derived rates

Contractor pays CBA determined wages and passes increases to the Government—no impact to profit

Allows reasonable wages without hurting profit

Labor Relations

All AETC aircraft maintenance contracts have Collective Bargaining Agreements

Neutrality is required!

Good relations are encouraged but avoid perceptions of favoritism

Politically Sensitive, Emotionally Powerful Issues

Balancing Act

Contractor

Union

- Invite union rep to attend award presentations involving union workforce

- Okay to invite union rep to social functions but also invite the contractor

- Notify union in advance of information that will be made public

- Involve union rep in disaster response and preparation

A Good Relationship

A Good Idea

Appear to favor the contractor or the union

GOOD

BAD

- Do not discuss planning or business decisions with union representatives

CAUTION

Staff Meeting Protocol

You can invite the Union Rep to staff meetings

. . .but we don’t recommend it

- Always a threat of “Unfair Labor Practice” charges

- Attempt to stop union attendance at a later date

- Claims against actions taken in absence of Rep

- Union Rep not bound or limited with the Press

- It’s not just a local issue--there are over 13M members of organized labor, large corporations and elected officials with a vested interest in the outcome

Labor Relations “9-1-1”

Start with CONS/CC

Labor Strike Plan Guide--a step-by-step guide

HQ AETC Labor Relations Working Group ready to help—not just for strikes, any labor issues

Team led by LGC includes PA, JA, SF, DP and Functionals

Reports to CAT and AETC/CC/CV

If required; can bring in the big boys

AF Labor Advisors, Federal Mediators, senior Union and Company Officials

Labor issues? Rumors of labor unrest?

Call Mr. Ira Garrett, AETC/LGC, DSN: 487-2519

Chairman, Labor Relations Working Group

If a Strike is Pending

News Media will want Wing CC viewpoint – Do not make press release unless approved by your Legal, PA and AF Labor Advisors

Other unions may choose not to cross picket line i.e., BX/Commissary deliveries, construction workers

CAUTION

WARNING

Call your CONS! --strike plans are in place

Pass could be requested from union to come on base and organize – Grant it!

Things to Remember

Motivate the Contractor with the proper Award Fee

Develop good contractor/labor force relationships

Get the Labor Relations Working Group involved early

Make the Award Fee determination on emotion

Obligate the government on your own

DO

DON’T

Questions?

File details come from the government source that posted it. Updated .