AF Form103.pdf
PDF 74 KB Posted
- Attached to
- Environmental Support Contract (ESC III) Federal contract opportunity
- Solicitation number
- FA2521-12-R-0001
About this file
AF Form103.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Environmental Support Contract (ESC III) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a web-optimized version of this form.
Download the original, full version:
www.usa-federal-forms.com/download.html
Convert any form into fillable, savable:
www.fillable.com
Learn how to use fillable, savable forms:
Demos: www.fillable.com/demos.html
Examples: www.fillable.com/examples.html
Browse/search 10's of 1000's of U.S. federal forms converted into fillable, savable:
www.usa-federal-forms.com
BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
DATE PREPARED
1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
D. FIRE DETECTION & PROTECTION SYSTEMS G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS
UNDERGROUND OVERHEAD E. UTILITY H. SECURITYB. DRAINAGE SYSTEMS
UNDERGROUND OVERHEAD F. COMM I. OTHER C. RAILROAD TRACKS
3. DATE CLEARANCE REQUIRED 4. DATE OF CLEARANCE
5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION
ORGANIZATION REMARKS (Use Reverse for additional comments) REVIEWER'S NAME AND INITIALS 8.
B A S E
C I V I L
E N G I N E E R I N G
A. ELECTRICAL DISTRIBUTION
B. STEAM DISTRIBUTION
C. WATER DISTRIBUTION
D. POL DISTRIBUTION
E. SEWER DISTRIBUTION
F. ENVIRONMENTAL
G. PAVEMENTS/ GROUNDS
H. FIRE PROTECTION
I. ZONE
J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
16. REQUESTED CLEARANCE APPROVED DISAPPROVED
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
AF IMT 103, 19940801, V3 PREVIOUS EDITIONS ARE OBSOLETE.
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
AF IMT 103, 19940801, V3 (REVERSE)
| AllFormsImprovedDotCom: |
| 4563: |
File details come from the government source that posted it. Updated .