OCI_Answer.pdf

PDF 151 KB Posted

Attached to
REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS)
Solicitation number
FA2517-13-R-8001
Issued by

View the file

Other files

File Type Posted
GEODSS_RFP_Questions_3.pdf PDF
WD_CBA-2009-2470 _Rev_4_(Socorro).pdf PDF
FA2517-13-R-8001-0002_Conformed.pdf PDF
FA2517-13-R-8001-0002.pdf PDF
4._Attch_4 _REVISED_Socorro_CBA.pdf PDF
GEODSS_RFP_Questions_Round_2.pdf PDF
FA2517-13-R-8001-0001.pdf PDF
FA2517-13-R-8001-0001_Conformed.pdf PDF
CBA_WD_2009-2470_Rev_3 _Socorro_NM.pdf PDF
WD_CBA-2009-2741 _Rev_4_(Maui).pdf PDF
GEODSS_RFP_Questions_1.pdf PDF
GEODSS_Site_Visit_Questions.pdf PDF
Site_Visit_Minutes.pdf PDF
Site_Visit_Attendees.pdf PDF
9._Attch_9 _L-4_PP_Client_Authorization_Letter_(Commercial)_GEODSS.doc DOC document
0._Request_for_Proposal_FA2517-13-R-8001.pdf PDF
1a._Attch_1 _DD_254_Continuation.docx DOCX document
11._Attch_11 _L-6_Staffing_Matrix_GEODSS.doc DOC document
3._Attch_3 _Maui_CBA.pdf PDF
12._Attch_12 _L-7_Site_Visit__Visit_Access_Request_(ESL_Form_100).xlsx XLSX spreadsheet
8._Attch_8 _L-3_PP_Consent_Letter_GEODSS.doc DOC document
6._Attch_6 _L-1_PP_Relevancy_Matrix_GEODSS.xls XLS spreadsheet
4._Attch_4 _Socorro_CBA.pdf PDF
7._Attch_7 _L-2_PP_Questionnaire_GEODSS.doc DOC document
10._Attch_10 _L-5_PP_Transmittal_Letter_(Govt_Kt)_GEODSS.doc DOC document
1._Attch_1 _DD_254.pdf PDF
5._Attch_5 _Quality_Assurance_Surveillance_Plan.doc DOC document
2._Attch_2 _Performance_Work_Statement.pdf PDF
4a._Attch_4 _Socorro_CBA_Addendum.pdf PDF
Diego_Garcia_Energy_Management_Program.pdf PDF
GEODSS_FY13_Workload_Data.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
0. FA2517-13-R-8001 GEODSS REVISED Notice of Site Visit.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
0. FA2517-13-R-8001 GEODSS Notice of Site Visit.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
Oct Nov and Dec Facilities PMIs.pdf PDF
Det 1-Equipment Repair PM Log.pdf PDF
Det 1-Work Orders.pdf PDF
Sep Facilities and CAS PMI's.pdf PDF
Det 1-PMI INDEX.PDF PDF
Socorro CBA.pdf PDF
Socorro CBA Addendum.pdf PDF
Maui CBA.pdf PDF
Maui Wage Determination.pdf PDF
Socorro Wage Determination.pdf PDF
DET 1 RPIE PCCIE Inventory.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2517-13-R-8001

Answer to OCI Questions

The SENSOR contract (and likely the future SORS contract) provides sustainment modifications, upgrades, and modernization efforts for GEODSS. In these situations, the

SENSOR team provides sustaining engineering and modification projects, developing, integrating, and assembling the modifications for GEODSS.

Essentially, a potential OCI could be one company recommending changes, testing, and providing technical evaluations on upgrades and modifications (O&M contractor) that the same company designed, developed, tested and integrated (SENSOR contractor) into the GEODSS system. An OCI includes possible testing, evaluation and acceptance by the O&M contractor of system upgrades, modernization and integration of sustainment solutions by the SENSOR contractor.

The Government has conducted its own OCI analysis which did not identify OCIs and concluded that the risk of a significant OCI on this effort is low. However, offerors may be aware of potential OCIs the Government did not contemplate. Therefore, in considering whether an OCI exists, offerors are encouraged to examine the following questions to aid in determining if a potential OCI exists-

1) Does the offeror/sub provide any systems engineering and technical direction on the current

GEODSS system through the SENSOR contract or any other means IAW FAR 9.505-1?

2) Does the offeror/sub prepare specifications or work statements on the current GEODSS system through the SENSOR contract or any other means IAW FAR 9.505-2?

3) Does the offeror/sub provide evaluation services on the current GEODSS system through the

SENSOR contract or any other means IAW FAR 9.505-3?

4) Does the offeror/sub obtain access to proprietary information on the current GEODSS system through the SENSOR contract or any other means IAW FAR 9.505-4?

If the offeror concludes that a potential/actual OCI exists for their company on this acquisition, IAW RFP Section L-3, AFFARS 5352.209-9001, provide with the proposal pertinent information regarding the OCI including any proposed mitigation plan. Note that if award is made to an offeror with an OCI, the resulting contract may include an organization conflict of interest limitation applicable to subsequent Government work, at either a prime contract level, at any subcontract tier, or both. During evaluation of proposals, the Government may, after discussions with the offeror and consideration of ways to avoid the conflict of interest, insert a special provision in the resulting contract which shall disqualify the offeror from further consideration for award of future contracts.

The solicitation contains an OCI clause in Section I that may be modified or deleted during discussions/negotiations. Currently the Government anticipates deleting the clause.

File details come from the government source that posted it. Updated .