GEODSS_FY13_Workload_Data.pdf

PDF 205 KB Posted

Attached to
REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS)
Solicitation number
FA2517-13-R-8001
Issued by

About this file

GEODSS FY13 Workload Data

View the file

Other files

File Type Posted
GEODSS_RFP_Questions_3.pdf PDF
WD_CBA-2009-2470 _Rev_4_(Socorro).pdf PDF
FA2517-13-R-8001-0002_Conformed.pdf PDF
FA2517-13-R-8001-0002.pdf PDF
4._Attch_4 _REVISED_Socorro_CBA.pdf PDF
GEODSS_RFP_Questions_Round_2.pdf PDF
FA2517-13-R-8001-0001.pdf PDF
FA2517-13-R-8001-0001_Conformed.pdf PDF
OCI_Answer.pdf PDF
CBA_WD_2009-2470_Rev_3 _Socorro_NM.pdf PDF
WD_CBA-2009-2741 _Rev_4_(Maui).pdf PDF
GEODSS_RFP_Questions_1.pdf PDF
GEODSS_Site_Visit_Questions.pdf PDF
Site_Visit_Minutes.pdf PDF
Site_Visit_Attendees.pdf PDF
9._Attch_9 _L-4_PP_Client_Authorization_Letter_(Commercial)_GEODSS.doc DOC document
0._Request_for_Proposal_FA2517-13-R-8001.pdf PDF
1a._Attch_1 _DD_254_Continuation.docx DOCX document
11._Attch_11 _L-6_Staffing_Matrix_GEODSS.doc DOC document
3._Attch_3 _Maui_CBA.pdf PDF
12._Attch_12 _L-7_Site_Visit__Visit_Access_Request_(ESL_Form_100).xlsx XLSX spreadsheet
8._Attch_8 _L-3_PP_Consent_Letter_GEODSS.doc DOC document
6._Attch_6 _L-1_PP_Relevancy_Matrix_GEODSS.xls XLS spreadsheet
4._Attch_4 _Socorro_CBA.pdf PDF
7._Attch_7 _L-2_PP_Questionnaire_GEODSS.doc DOC document
10._Attch_10 _L-5_PP_Transmittal_Letter_(Govt_Kt)_GEODSS.doc DOC document
1._Attch_1 _DD_254.pdf PDF
5._Attch_5 _Quality_Assurance_Surveillance_Plan.doc DOC document
2._Attch_2 _Performance_Work_Statement.pdf PDF
4a._Attch_4 _Socorro_CBA_Addendum.pdf PDF
Diego_Garcia_Energy_Management_Program.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
0. FA2517-13-R-8001 GEODSS REVISED Notice of Site Visit.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
0. FA2517-13-R-8001 GEODSS Notice of Site Visit.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
Oct Nov and Dec Facilities PMIs.pdf PDF
Det 1-Equipment Repair PM Log.pdf PDF
Det 1-Work Orders.pdf PDF
Sep Facilities and CAS PMI's.pdf PDF
Det 1-PMI INDEX.PDF PDF
Socorro CBA.pdf PDF
Socorro CBA Addendum.pdf PDF
Maui CBA.pdf PDF
Maui Wage Determination.pdf PDF
Socorro Wage Determination.pdf PDF
DET 1 RPIE PCCIE Inventory.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHAPTER DATA ITEM PWS REF UNITS

FY13

DET 1

TOTALS

FY13

DET 2

TOTALS

FY13

DET 3

TOTALS

1 Briefings, Meetings, Tours 1.2.6 Hours 150 192 239.5

Higher Headquarters, JSpOC, and

USTRATCOM Taskings 2.1.2 # of Taskings 696592 1919417 999963

Higher Headquarters, JSpOC, and

USTRATCOM Reports 2.1.2

# of Voice and

Hardcopy

Reports 4289 4170 2191

2 Space Object Identification (SOI) Attempts 2.1.2.2

# of SOI

Attempts 1160 5004 1237

2 Space Object Identification (SOI) Support 2.1.2.2 Hours 116 415.9 171.77

2 Software Upgrade Modifications 2.2.3.2

# of Software

Upgrades 1 0 1

2 Hardware Upgrade Modifications 2.2.3.2

# of Hardware

Upgrades 0 0 3

3 Exercises and Inspection Support 3.1 Hours 8 8 31

3 Exercises and Inspections 3.1

# of Exercises and Inspections 1 4 8

3 Contractor Team Support 3.2.3 Hours 37 45 19.5

4 Depot Level Maintenance 4.1.1 # of Requests 3 2 4

4 Time Compliance Technical Order (TCTO) 4.2.6.1 # of TCTOs 0 0 0

Test, Measurement, and Diagnostic

Equipment (TMDE) 5

# of Items

Sent for

Calibration 16 32 30

7 Service Disruptions 7.1.1 # of Outages 0 5 17

7 Network Security Notices Requiring Action 7.4.1.3

# of Actionable

Notices 0 0 9

7 Long Haul Circuit Outages 7.6 # of Outages 16 11 15

7 Long Haul Circuit Outages 7.6 Hours 95 45 13.5

8 Meetings and Training 8.1.9 Hours 8 107 158

9 Documentation: RPIE, EAID, PCCIE, & GFP 9.3.1.4 Hours 12 24 2

9 Backflow Prevention Program (Det 1 & 2) 9.4.1 Hours 1 2 0

9 Uninterruptible Power Supply (UPS) 9.6 Hours 12 14 6

11 Visit Requests 11.4

# of Visit

Requests 134 13 43

11 Escorted Entry 11.5.3

# of Personnel

Escorted 4 413 165

11 Escorted Entry 11.5.3 Hours 9 302 70.5

Force Protection Condition (FPCON)

Measures Supported 11.6

# of Measures

Supported 0 0 0

Force Protection Condition (FPCON)

Measures Supported 11.6 Hours 0 0 0

GEODSS FY13 WORKLOAD DATA

COMSEC ITEMS UNITS

DET 1

QTY

DET 2

QTY

DET 3

QTY

COMSEC Items

# of Items

21 7 0

AMC PASSENGER TARRIFS FOR FY14

Location/Channel/Codes

Non-Fed

Cost (one-way)

Non-Fed

Cost (roundtrip)

SINGAPORE (QPG)-DIEGO GARCIA (NKW) $875 $1,750

FUEL COSTS AT DIEGO GARCIA

Diesel/DS-2 $3.49/gallon

Gasoline Unleaded $3.53/gallon

JP-5 $3.65/gallon

The drive is 36 miles round trip each day

File details come from the government source that posted it. Updated .