REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS)
Solicitation number
FA2517-13-R-8001
Issued by

About this file

Questions and Answers from the Site Visit - 30 June 2014

View the file

Other files

File Type Posted
GEODSS_RFP_Questions_3.pdf PDF
WD_CBA-2009-2470 _Rev_4_(Socorro).pdf PDF
FA2517-13-R-8001-0002_Conformed.pdf PDF
FA2517-13-R-8001-0002.pdf PDF
4._Attch_4 _REVISED_Socorro_CBA.pdf PDF
GEODSS_RFP_Questions_Round_2.pdf PDF
FA2517-13-R-8001-0001.pdf PDF
FA2517-13-R-8001-0001_Conformed.pdf PDF
OCI_Answer.pdf PDF
CBA_WD_2009-2470_Rev_3 _Socorro_NM.pdf PDF
WD_CBA-2009-2741 _Rev_4_(Maui).pdf PDF
GEODSS_RFP_Questions_1.pdf PDF
Site_Visit_Minutes.pdf PDF
Site_Visit_Attendees.pdf PDF
9._Attch_9 _L-4_PP_Client_Authorization_Letter_(Commercial)_GEODSS.doc DOC document
0._Request_for_Proposal_FA2517-13-R-8001.pdf PDF
1a._Attch_1 _DD_254_Continuation.docx DOCX document
11._Attch_11 _L-6_Staffing_Matrix_GEODSS.doc DOC document
3._Attch_3 _Maui_CBA.pdf PDF
12._Attch_12 _L-7_Site_Visit__Visit_Access_Request_(ESL_Form_100).xlsx XLSX spreadsheet
8._Attch_8 _L-3_PP_Consent_Letter_GEODSS.doc DOC document
6._Attch_6 _L-1_PP_Relevancy_Matrix_GEODSS.xls XLS spreadsheet
4._Attch_4 _Socorro_CBA.pdf PDF
7._Attch_7 _L-2_PP_Questionnaire_GEODSS.doc DOC document
10._Attch_10 _L-5_PP_Transmittal_Letter_(Govt_Kt)_GEODSS.doc DOC document
1._Attch_1 _DD_254.pdf PDF
5._Attch_5 _Quality_Assurance_Surveillance_Plan.doc DOC document
2._Attch_2 _Performance_Work_Statement.pdf PDF
4a._Attch_4 _Socorro_CBA_Addendum.pdf PDF
Diego_Garcia_Energy_Management_Program.pdf PDF
GEODSS_FY13_Workload_Data.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
0. FA2517-13-R-8001 GEODSS REVISED Notice of Site Visit.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
0. FA2517-13-R-8001 GEODSS Notice of Site Visit.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
Oct Nov and Dec Facilities PMIs.pdf PDF
Det 1-Equipment Repair PM Log.pdf PDF
Det 1-Work Orders.pdf PDF
Sep Facilities and CAS PMI's.pdf PDF
Det 1-PMI INDEX.PDF PDF
Socorro CBA.pdf PDF
Socorro CBA Addendum.pdf PDF
Maui CBA.pdf PDF
Maui Wage Determination.pdf PDF
Socorro Wage Determination.pdf PDF
DET 1 RPIE PCCIE Inventory.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEODSS Industry Day

Questions and Answers

Question

# QUESTION ANSWER

1 How big is the backup generator? 200KW.

Have there been any problems with switchover to the generator after a power loss?

No. There is an automatic transfer switch in place and the transfer of power has been smooth.

3 When you lose power, is water lost also? No, as long as the generator kicks on.

Does the GEODSS site share power with MIT Lincoln Laboratory? The sites are fed the same commercial power. GEODSS does not share emergency power (generator) with MIT

Lincoln Laboratory

5 Are people always on site from MIT Lincoln Laboratory? No. Their presence on site varies.

6 Who owns and what is the purpose of the surrounding buildings? WSMR proper, leased out to multiple agents

What is the typical crew makeup? Crew make-up will be up to the offeror on how to best meet the requirements of the PWS.

8 What security level are typical operations conducted at? Secret

Why are the domes being replaced? As part of the sustainment/service life extension of the system.

Who are the manufacturers of the new domes? The new domes are called Observa Domes and are made by Laboratories, INC.

11 Can the brake system for the domes be done manually? Yes.

What is the purpose of the barcodes on the towers and domes? Tower scans the barcodes to know which direction it is pointing. Each barcode is representative of azimuth degree

Are there any differences between the sites in terms of the physical layout?

Dets 1 and 2 are virtually the same, at Det 3 the towers are stand-alone and not connected to the Ops building.

Who develops mission planning? Taskings are determined by JSpOC, but mission scheduling is a PWS requirement (PWS 2.1.1)

How do you plan the SOI taskings that need to be completed? SOI taskings are determined by NASIC. As part of mission scheduling, the contractor determines how to complete

100% of objects tasked each month.

Can the contractor communicate directly with National Air and Space

Intelligence Center (NASIC)?

Yes.

Do you use astrometric or mount model calibration? There are numerous calibration in the T.O., some use mount data others use astrometric.

18 Can the O&M contractor suggest TTPs? Yes. See PWS 3.1.4.1

Does the Det CC/COR conduct operations and require training? The Det CC/COR does not conduct operations, but receive

Basic Mission Qualification training from the contractor.

What are the requirements for mount calibration? These are covered in the requisite TO (available in the

Bidder's Library).

21 What is the wind limitation on the towers? 27 mph.

GEODSS Industry Day

Questions and Answers

Question

# QUESTION ANSWER

22 How long does calibration take? 10 minutes.

23 Do the domes have rain sensors? Yes.

File details come from the government source that posted it. Updated .