F-_25-8615_Insurance_Requirements_Version_2.pdf

PDF 231 KB Posted

Attached to
Design Services for Northeast Service Area Utility Infrastructure Improvements State and local contract opportunity
Solicitation number
25-8615
Issued by
Collier County, Florida

About this file

This is an Insurance Requirements and Bonding Form for Collier County, Florida's Request for Professional Services (RPS No. 25-8615) for Design Services for Northeast Service Area Utility Infrastructure Improvements. The project involves comprehensive design and construction administration services for constructing up to eight new Irrigation Quality (IQ) wells, potable water and IQ booster re-pump station improvements at Brightshore Village, Town of Big Cypress/Rivergrass, and Camp Keais Utility Site, and utility transmission mains on Oil Well Road. The design team will perform preliminary design, geotechnical and land surveying, subsurface utility engineering, hydraulic modeling, final design, permitting, bidding packages, opinion of probable costs, public involvement services, construction administration, and construction warranty services. The pre-proposal conference is scheduled for October 29, 2025, at 11:30 AM EST, with proposal submissions due on November 24, 2025, at 3:00 PM EST. The insurance requirements must provide coverage for a minimum of six months from the date of award.

Bidders must comply with comprehensive insurance and bonding requirements including Worker's Compensation at statutory limits of Florida Statutes Chapter 440; Employer's Liability with a single limit per occurrence of $1,000,000; Commercial General Liability with $1,000,000 per occurrence and $2,000,000 aggregate; Automobile Liability with $1,000,000 per occurrence; and Professional Liability coverage. A bid bond equal to 5% of the cost proposal must be submitted with the proposal response. For projects exceeding $200,000, Performance and Payment Bonds written for 100% of the contract award amount are required upon contract execution, with surety rated A- or better by A.M. Best Company. Collier County must be named as an additional insured on the Commercial General Liability certificate, with the certificate holder listed as "Collier County Board of County Commissioners, 3295 Tamiami Trail East, Naples, FL 34112." All certificates require 30 days cancellation notice, and subcontractors must comply with identical insurance requirements. Collier County will procure and maintain Builders Risk Insurance on construction projects where deemed necessary, with premiums billed to the project.

View the file

Other files for this state and local contract opportunity

Other files attached to Design Services for Northeast Service Area Utility Infrastructure Improvements, newest first.
File Type Posted
25-8615_Sign-in_Sheets.pdf PDF
25-8615_Sign-in_Sheets.pdf PDF
25-8615_Solicitiation.pdf PDF
25-8615_Solicitiation.pdf PDF
Request_for_Professional_Services_Instructions_Version_1.pdf PDF
Request_for_Professional_Services_Instructions_Version_1.pdf PDF
Request_for_Professional_Services_Instructions_Version_1.pdf PDF
25-8615_Solicitiation.pdf PDF
A-_Checklist_-_Vendor_Checklist.pdf PDF
B-_Form_1_Vendor_Declaration_Statement.pdf PDF
C-_Form_2_Conflict_of_Interest_Certification.pdf PDF
G-_PSA_CCNA_Single_Project_Agreement_[2025_ver.1]_(3).pdf PDF
D-_Form_3_Immigration_Certification.pdf PDF
G-_PSA_CCNA_Single_Project_Agreement_[2025_ver.1]_(3).pdf PDF
B-_Form_1_Vendor_Declaration_Statement.pdf PDF
C-_Form_2_Conflict_of_Interest_Certification.pdf PDF
D-_Form_3_Immigration_Certification.pdf PDF
E-_Form_4_Reference_Questionnaire.pdf PDF
G-_PSA_CCNA_Single_Project_Agreement_[2025_ver.1]_(3).pdf PDF
H-_PO_Terms_and_Conditions_Rev.3.pdf PDF
E-_Form_4_Reference_Questionnaire.pdf PDF
F-_25-8615_Insurance_Requirements_Version_2.pdf PDF
D-_Form_3_Immigration_Certification.pdf PDF
E-_Form_4_Reference_Questionnaire.pdf PDF
F-_25-8615_Insurance_Requirements_Version_2.pdf PDF
A-_Checklist_-_Vendor_Checklist.pdf PDF
B-_Form_1_Vendor_Declaration_Statement.pdf PDF
H-_PO_Terms_and_Conditions_Rev.3.pdf PDF
H-_PO_Terms_and_Conditions_Rev.3.pdf PDF
A-_Checklist_-_Vendor_Checklist.pdf PDF
C-_Form_2_Conflict_of_Interest_Certification.pdf PDF
EXHIBIT_4_-_Northeast_Projects_Utility_Sites.pdf PDF
EXHIBIT_3_-_SFWMD_CUP_11-00052-W_Mod_6-3-2025.pdf PDF
EXHIBIT_1_-_TOBC_Agreement_well_site_Locations.pdf PDF
EXHIBIT_6_-_Utility_Standards.pdf PDF
EXHIBIT_1_-_TOBC_Agreement_well_site_Locations.pdf PDF
EXHIBIT_2_-_Map_Future_IQ_Wells_(1-5)_and_IQ_Main.pdf PDF
EXHIBIT_3_-_SFWMD_CUP_11-00052-W_Mod_6-3-2025.pdf PDF
EXHIBIT_1_-_TOBC_Agreement_well_site_Locations.pdf PDF
EXHIBIT_2_-_Map_Future_IQ_Wells_(1-5)_and_IQ_Main.pdf PDF
EXHIBIT_6_-_Utility_Standards.pdf PDF
EXHIBIT_4_-_Northeast_Projects_Utility_Sites.pdf PDF
EXHIBIT_5_-_2nd_Looping.pdf PDF
EXHIBIT_6_-_Utility_Standards.pdf PDF
EXHIBIT_4_-_Northeast_Projects_Utility_Sites.pdf PDF
EXHIBIT_5_-_2nd_Looping.pdf PDF
EXHIBIT_2_-_Map_Future_IQ_Wells_(1-5)_and_IQ_Main.pdf PDF
EXHIBIT_5_-_2nd_Looping.pdf PDF
EXHIBIT_3_-_SFWMD_CUP_11-00052-W_Mod_6-3-2025.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 2 10.2.25

Solicitation Number, Services, or Products Being Procured:

Insurance / Bond Type Required Limits

Worker’s Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and Requirements

Evidence of Workers’ Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption. An application for exemption can be obtained online at https://apps.fldfs.com/bocexempt/

1.

Employer’s Liability $ single limit per occurrence

3. Commercial General Liability (Occurrence Form) patterned after the current ISO form

Bodily Injury and Property Damage

$ single limit per occurrence, $2,000,000 aggregate for Bodily Injury Liability and Property Damage Liability. The General Aggregate Limit shall be endorsed to apply per project. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability.

4. Indemnification To the maximum extent permitted by Florida law, the Contractor/Vendor shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys’ fees and paralegals’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor/ Vendor or anyone employed or utilized by the Contractor/Vendor in the performance of this Agreement.

5. Automobile Liability $ Each Occurrence; Bodily Injury & Property Damage Owned/Non-owned/Hired; Automobile Included

6 Other insurance as noted: Watercraft $ Per Occurrence

United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work.

$ Per Occurrence

Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work.

$ Per Occurrence

Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement.

$ Per Occurrence

☐Umbrella/Excess Coverage $_____________ Per Occurrence

Pollution $ Per Occurrence

Professional Liability $ Per claim & in the aggregate

Cyber Liability $ Per Occurrence Valuable

$ Per Occurrence

$ __ Per Occurrence

Technology Errors & Omissions

Other:

Other: $ __ Per Occurrence

☐Other: $____________ Per Occurrence

INSURANCE AND BONDING REQUIREMENTS FORM

2.

https://apps.fldfs.com/bocexempt/ emily jackson Rectangle

Version 2 10.2.25

7. Bid Bond Shall be submitted with the proposal response in the form of proposal bond in a sum equal to 5% of the cost proposal.

8. Performance and Payment Bonds

For projects in excess of $200,000, bonds shall be submitted with the executed contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Bidder receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as “A-“ or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders’ surplus, all as reported in the most current Best Key Rating Guide, published by A.M.

Best Company, Inc. of 75 Fulton Street, New York, New York 10038.

9. Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions.

10. Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Vendor’s policy shall be endorsed accordingly.

11. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County.

12. On all certificates, the Certificate Holder must read: Collier County Board of County Commissioners, 3295 Tamiami Trail East, Naples, FL 34112

13. Thirty (30) Days Cancellation Notice required.

14. Collier County shall procure and maintain Builders Risk Insurance on all construction projects where it is deemed necessary. Such coverage shall be endorsed to cover the interests of Collier County as well as the Contractor. Premiums shall be billed to the project and the Contractor shall not include Builders Risk premiums in its project proposal or project billings. All questions regarding Builder’s Risk Insurance will be addressed by the Collier County Risk Management Division.

Approved by: Signature:

BIDDER/PROPOSER’S INSURANCE ACCEPTANCE

By submission of the bid/proposal Bidder/Proposer accepts and understands the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. The insurance submitted must provide coverage for a minimum of six (6) months from the date of the award.

BIDDER/PROPOSER’S INSURANCE ACCEPTANCE

undefined: 1,000,000
Commercial General: On
undefined_2: 1,000,000
Indemnification: On
Automobile Liability: On
Other insurance as noted: On
undefined_3: 1,000,000
undefined_4:
Watercraft: Off
United States Longshoremans and Harborworkers Act coverage shall be maintained: Off
undefined_5:
Maritime Coverage Jones Act shall be maintained where applicable to the: Off
undefined_6:
Aircraft Liability coverage shall be carried in limits of not less than 5000000 each: Off
undefined_7:
undefined_8:
UmbrellaExcess Coverage: Off
Pollution: Off
Professional Liability: On
Cyber Liability: Off
Technology Errors Omissions: Off
Other insert text box here: Off
Other insert text box here_2: Off
Other insert text box here_3: Off
undefined_9:
undefined_10: 1,000,000
undefined_11:
undefined_12:
Version 2 10225:
Bid Bond: Off
Shall be submitted with the proposal response in the form of proposal bond in a sum equal to 5 of the cost proposal:
2025-10-22T08:49:22-0400
GonzalezGreily
Employers Liability: On
Worker's Compensation: On
Performance and Payment: Off
9: On
10: On
11: On
12: On
13: On
Project Title: 25-8615 Design Services Northeast Service Area Utility Infrastructure Improvements
undefined_13:
undefined_14:
undefined_15:
undefined_16:
undefined_17:
undefined_18:

File details come from the government source that posted it. Updated .