EXHIBIT_4_-_Northeast_Projects_Utility_Sites.pdf

PDF 13 MB Posted

Attached to
Design Services for Northeast Service Area Utility Infrastructure Improvements State and local contract opportunity
Solicitation number
25-8615
Issued by
Collier County, Florida

About this file

Exhibit 4 is a utility sites reference document supporting Collier County, Florida's Request for Professional Services (RPS No. 25-8615) for Design Services for Northeast Service Area Utility Infrastructure Improvements. The project scope encompasses comprehensive design and construction administration services for up to eight new Irrigation Quality (IQ) wells, potable water and IQ booster re-pump station improvements at three primary locations including Brightshore Village, Town of Big Cypress/Rivergrass, and Camp Keais Utility Site, along with utility transmission mains on Oil Well Road. The design team will provide preliminary and final design, geotechnical and land surveying, subsurface utility engineering, hydraulic modeling, permitting, bidding packages, opinion of probable costs, public involvement services, construction administration, and construction warranty services. A pre-proposal conference is scheduled for October 29, 2025, at 11:30 AM EST, with proposals due November 24, 2025, at 3:00 PM EST. The contract term includes potential extensions up to 180 days.

Evaluation of proposals will utilize a 100-point scoring system across six criteria: ability of professional personnel (20 points), certified minority business enterprise participation (5 points), past performance (25 points), project approach and time/budget requirements (20 points), location (10 points), and recent/current/projected workloads (20 points). The project is funded through the Northeast Interim Facilities Program, which addresses utility service needs for projected population growth from 2025 to 2031 in the northeast County area. Proposers must be enrolled in the E-Verify program, provide proof of employment eligibility, carry comprehensive insurance including Worker's Compensation, Commercial General Liability, Automobile Liability, and Professional Liability coverage, and comply with bonding requirements for projects exceeding $200,000. Submission of detailed reference questionnaires, conflict of interest certifications, and compliance with county utility standards is required, with all documents submitted electronically through the Collier County Procurement Services Division Online Bidding System.

View the file

Other files for this state and local contract opportunity

Other files attached to Design Services for Northeast Service Area Utility Infrastructure Improvements, newest first.
File Type Posted
25-8615_Sign-in_Sheets.pdf PDF
25-8615_Sign-in_Sheets.pdf PDF
Request_for_Professional_Services_Instructions_Version_1.pdf PDF
25-8615_Solicitiation.pdf PDF
25-8615_Solicitiation.pdf PDF
25-8615_Solicitiation.pdf PDF
Request_for_Professional_Services_Instructions_Version_1.pdf PDF
Request_for_Professional_Services_Instructions_Version_1.pdf PDF
H-_PO_Terms_and_Conditions_Rev.3.pdf PDF
A-_Checklist_-_Vendor_Checklist.pdf PDF
F-_25-8615_Insurance_Requirements_Version_2.pdf PDF
C-_Form_2_Conflict_of_Interest_Certification.pdf PDF
B-_Form_1_Vendor_Declaration_Statement.pdf PDF
C-_Form_2_Conflict_of_Interest_Certification.pdf PDF
D-_Form_3_Immigration_Certification.pdf PDF
E-_Form_4_Reference_Questionnaire.pdf PDF
G-_PSA_CCNA_Single_Project_Agreement_[2025_ver.1]_(3).pdf PDF
H-_PO_Terms_and_Conditions_Rev.3.pdf PDF
E-_Form_4_Reference_Questionnaire.pdf PDF
F-_25-8615_Insurance_Requirements_Version_2.pdf PDF
D-_Form_3_Immigration_Certification.pdf PDF
E-_Form_4_Reference_Questionnaire.pdf PDF
F-_25-8615_Insurance_Requirements_Version_2.pdf PDF
A-_Checklist_-_Vendor_Checklist.pdf PDF
B-_Form_1_Vendor_Declaration_Statement.pdf PDF
H-_PO_Terms_and_Conditions_Rev.3.pdf PDF
A-_Checklist_-_Vendor_Checklist.pdf PDF
B-_Form_1_Vendor_Declaration_Statement.pdf PDF
C-_Form_2_Conflict_of_Interest_Certification.pdf PDF
G-_PSA_CCNA_Single_Project_Agreement_[2025_ver.1]_(3).pdf PDF
D-_Form_3_Immigration_Certification.pdf PDF
G-_PSA_CCNA_Single_Project_Agreement_[2025_ver.1]_(3).pdf PDF
EXHIBIT_3_-_SFWMD_CUP_11-00052-W_Mod_6-3-2025.pdf PDF
EXHIBIT_1_-_TOBC_Agreement_well_site_Locations.pdf PDF
EXHIBIT_2_-_Map_Future_IQ_Wells_(1-5)_and_IQ_Main.pdf PDF
EXHIBIT_3_-_SFWMD_CUP_11-00052-W_Mod_6-3-2025.pdf PDF
EXHIBIT_1_-_TOBC_Agreement_well_site_Locations.pdf PDF
EXHIBIT_2_-_Map_Future_IQ_Wells_(1-5)_and_IQ_Main.pdf PDF
EXHIBIT_6_-_Utility_Standards.pdf PDF
EXHIBIT_4_-_Northeast_Projects_Utility_Sites.pdf PDF
EXHIBIT_5_-_2nd_Looping.pdf PDF
EXHIBIT_6_-_Utility_Standards.pdf PDF
EXHIBIT_5_-_2nd_Looping.pdf PDF
EXHIBIT_2_-_Map_Future_IQ_Wells_(1-5)_and_IQ_Main.pdf PDF
EXHIBIT_5_-_2nd_Looping.pdf PDF
EXHIBIT_4_-_Northeast_Projects_Utility_Sites.pdf PDF
EXHIBIT_3_-_SFWMD_CUP_11-00052-W_Mod_6-3-2025.pdf PDF
EXHIBIT_1_-_TOBC_Agreement_well_site_Locations.pdf PDF
EXHIBIT_6_-_Utility_Standards.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 4

File details come from the government source that posted it. Updated .