Exhibit C 15400 Plumbing.pdf
PDF 575 KB Posted
- Attached to
- Honuakaha Hot Water Return Systems Modifications
- Solicitation number
- B27000116
- Issued by
- Honolulu County, Hawaii
About this file
This is a plumbing specification exhibit for the Hawaii Community Development Authority (HCDA) Invitation for Bid (IFB) HCDA-CIP-2026-03 for modifications to the domestic tankless hot water return systems serving 151 rental units at 545 Queen Street in Honolulu, Oahu. The project requires comprehensive plumbing work including installation of Type L seamless rigid copper tubing with wrought copper or cast copper alloy solder-type fittings, check valves, ball valves, circuit setter valves, strainers, pipe insulation with aluminum jacketing, hangers and supports, and associated accessories. All work must comply with the Honolulu Building Code, Plumbing Code, Board of Water Supply Construction Standards, Fire Marshal Regulations, and Hawaii Department of Health Regulations. Contractors are required to submit five bound copies of shop drawings at a minimum scale of 1/8 inch per foot and equipment/materials data prior to installation, maintain record drawings throughout the project, and obtain all applicable permits and certificates from public authorities having jurisdiction.
The specification mandates that all materials be new and of the highest quality, with workmanship performed by skilled personnel under adequate supervision. Contractors must conduct site visits to examine existing conditions and verify all dimensions before bidding, as reasonable modifications to indicated locations to suit actual job conditions shall not constitute a basis for requesting additional compensation. Water piping must be tested at 150 psig in accordance with applicable plumbing codes, and all domestic hot water and hot water return lines must be flushed, sterilized with chlorine solution to achieve 200 PPM residual chlorine, allowed to stand for a minimum of three hours, and then flushed until chlorine levels are reduced to less than 0.2 PPM. Contractors provide a one-year written guarantee on all work from the date of final HCDA acceptance and are responsible for all damages caused by leaks or defects in materials, equipment, or installation during this period, except for defects resulting from misuse, accident, or negligence by other parties.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plumbing Honuakaha Hot Water Return System Modifications
IFB HCDA-CIP-2026-03 15400-1
DIVISION 15 - MECHANICAL
SECTION 15400 - PLUMBING
PART 1 - GENERAL
1.01 SUMMARY
A. Provide all labor and materials, service and equipment to complete the plumbing work as indicated on the drawings and/or specified herein.
B. It shall be the responsibility of the Contractor to examine the project site and determine for himself the existing conditions.
1.02 CONTRACT DRAWINGS
A. Contract drawings are diagrammatic, indicating general layout and approximate locations towards establishing the scope for uniform estimating basis for all bidders. Drawings are not intended to be detailed construction working drawings; they do not show every offset, bend, elbow, etc., required for installation in the space provided. All locations, dimensions and finish conditions for mechanical work shall be checked and coordinated with the shop drawings.
B. Resolve all discrepancies between the plans and specifications of this Division, or between the plans and specifications of this Division versus those of other trades with the Hawaii Community Development Authority (HCDA) Engineer before proceeding with the work.
C. Reasonable modifications to indicated locations and arrangement to suit job conditions shall not constitute a basis for requesting additional compensation.
D. Work in this section must be coordinated with other trades to provide a properly installed and properly functioning system.
1.03 REQUIRED SUBMITTALS
A. Submit in accordance with SUBMITTALS.
B. Equipment/Materials Data and Shop Drawings: Prior to start of any installation, submit five (5) bound copies of shop drawings and equipment/materials data for all work to the HCDA Engineer for review.
Contractor agrees that the purpose of equipment/materials data and shop drawings submittal is to demonstrate to the HCDA Engineer the Contractor's understanding of the design concept by indicating which materials he intends to furnish and install and the fabrication and installation methods he intends to use.
EXHIBIT C
Plumbing Honuakaha Hot Water Return System Modifications IFB HCDA-CIP-2026-03 15400-2
C. Equipment/Materials Data: Submit five (5) bound copies of brochures or catalog cuts together with a cover sheet listing the items, manufacturers, and model numbers. Submit all items at one time; incomplete submittals are not acceptable and shall be returned without review. Submittal shall be clearly designated as to the intended item with identification (unit number or other marking) to show location, service, and function.
D. Shop Drawings: Submit five (5) bound copies of shop drawings. Shop Drawings shall use a minimum scale of 1/8 inch per foot on drawing sheets the same size as contract drawings. Include floor plans, installation details of piping, and identifying and indicating proposed location, layout and arrangement of items of piping, and other items that must be shown to ensure a coordinated installation. Demolition work shall indicate proposed methods and sequence of operations. Include coordination for temporary shut-off and continuation of utility services as required. Drawings shall indicate adequate clearance for operation, maintenance. Contract drawings shall not be reproduced and submitted as shop drawings.
E. Record Drawings: The Contractor shall keep at the jobsite a complete, neat and accurate record of all approved deviations from the contract drawings, shop drawings and specifications, indicating the work as actually installed. At the end of the job all record information shall be transferred to a clean set of reproducible prints.
1.04. PERMITS AND CERTIFICATES
A. Obtain and pay for all applicable permits, certificates, fees, and inspections required by any public authority having jurisdiction over this work.
B. The HCDA reserves the right to require a written certificate as a pre-condition to acceptance of work. Certificates shall be dated and signed by a responsible employee of this Contractor as proof of performance of the work.
1.05. CODES, RULES, AND REGULATIONS
A. All work shall be performed in strict accordance with the applicable provisions of the Building Code and the Plumbing Code of the City and County of Honolulu, Construction Standards of the Board of Water Supply, Regulations of the Fire Marshall and Regulations of the Department of Health of the State of Hawaii.
B. Where the Contract Documents indicate materials or construction in excess of code requirements, the Contract Documents shall govern.
C. Should there be any direct conflict between applicable codes and the drawings and/or these specifications, the codes shall govern.
IFB HCDA-CIP-2026-03 15400-3
1.06 RESPONSIBILITIES OF CONTRACTOR
A. Prior to submitting a bid, the Bidder shall examine all drawings and specifications issued and shall visit the site of the work to become familiar with all visible existing conditions, codes, rules, and regulations in effect at the site. As a result of having visited the site, the successful bidder (Contractor) shall be responsible for the installation of the work as it relates to such visible existing conditions.
B. The Contractor shall verify all dimensions governing the mechanical work and examine adjoining work on which mechanical equipment is dependant and shall report any work that must be corrected. No waiver of responsibility for defective work shall be claimed or allowed due to failure to report unfavorable conditions affecting the mechanical work.
C. Contractor is assumed to be skilled in his trade and is solely responsible for compliance with health and safety regulations, performing the work in a safe and competent manner, and in installation procedures required for the work outlined in these specifications.
1.07 GUARANTEE
A. Contractor shall provide a written guarantee that all work is as specified, and shall be bound to reinstall material or equipment defective due to workmanship or materials for a period of one (1) year from the date of final acceptance of the installation by the HCDA except for equipment and materials noted otherwise. Contractor shall not be responsible, however, for defects proven to the HCDA’s satisfaction to be due to misuse, accident or negligence by other parties.
B. Further, Contractor shall be held responsible for all damages to any part of the premises, building or contents caused by leaks or other defects in pipe, fixtures, equipment or materials provided under this specification, for a period of one (1) year from the date of final acceptance of the installation by the HCDA.
C. Terms of this guarantee are in addition to other guarantee provisions of the specifications, and do not substitute for other more stringent terms, if any.
D. Existing conditions, materials, sizes and dimensions shown on these drawings represent the best available information obtained from existing drawings and field investigations. Prospective bidders shall visit the premises and familiarize themselves with all work details and conditions before submitting a bid. Reasonable modifications to indicated arrangements to suit actual conditions shall not constitute a basis for requesting additional funds from the HCDA.
E. Prior to ordering materials the Contractor shall verify all existing conditions, materials, sizes and dimensions that effect their work, and shall coordinate
IFB HCDA-CIP-2026-03 15400-4
their work with all crafts involved.
PART 2 - PRODUCTS
2.01 GENERAL
A. All products, materials, and equipment except as otherwise noted, shall be new and of the best quality available in their respective kinds, free from all defects and shall be of the make and types specified or approved equal.
Trade names and manufacturers names denote the character and quality of equipment desired and shall not be construed as limiting competition.
B. The supplier, by submitting, certifies that the equipment and materials being proposed are proper for the application intended and that equipment has the capacity called for.
C. All products, materials, and accessories shall be furnished and installed as a complete system ready for the HCDA’s beneficial use.
2.05 PIPING MATERIALS
A. Water Piping, Above Grade: Above ground piping shall be Type "L" seamless rigid copper tubing conforming to ASTM B88 with wrought copper or cast copper alloy solder type fittings conforming to ANSI B16.22 or ANSI B16.18. Solder shall be 95-5 tin-antimony or approved equal.
2.06 HANGERS AND SUPPORTS
Products of Grinnell, Superstrut, B-Line, PHD Manufacturing, or approved equal.
Hangers, supports and accessories used shall be applied in accordance with the manufacturer's recommendation for type of service and application. All supports, rods and accessories shall be galvanized. In addition, supports for copper pipe shall be plastic coated. All hangers and supports shall allow for expansion and contraction. Suspended lines shall be suitably braced to prevent vibration and shall maintain required grading by proper adjustment.
2.07 CHECK VALVE
Bronze body, , swing type, renewable disc, screwed cap and ends, 125 psi SWP.
2.08 BALL VALVE
Bronze construction, two-piece body, 600-psi WOG, full-port, insulated quarter-turn handle, double O-ring stem seals, blowout-proof stem, PTFE seats.
IFB HCDA-CIP-2026-03 15400-5
2.09 CIRCUIT SETTER VALVES:
Bell & Gossett bronze plug cock with square head, screwed ends.
2.10 STRAINER:
Y-strainers for lines 2” and smaller, bronze body, 20 mesh stainless steel screen, screwed ends, hose end valve, 300 psi WOG.
2.11 SLEEVES
Furnish and install 24-gauge galvanized sheet metal sleeves for all pipes through stud walls and galvanized steel pipe for sleeves through concrete walls. Seal exterior wall sleeve watertight.
2.12 UNIONS
Provide unions at all equipment and accessory locations and at screwed valves.
Provide dielectric unions at lines of dissimilar metals. EPCO Model FX or approved equal.
2.13 PIPE INSULATION
Pipe insulation for hot water return piping shall be black flexible elastomeric performed pipe insulation, UL listed 25/50 flame/smoke developed rating.
Armstrong standard Armaflex pipe insulation, 3/4-inch thickness or approved equal. All hot water return piping shall be wrapped with 0.016-inch thick aluminum jacketing. Installation of snap and metal bands shall be as recommended by the manufacturer.
2.14 ACCESS PANELS
Access panels for access to valves, etc., shall be hinged, Milcor 12” x 12” or approved equal.
PART 3 - EXECUTION
3.01 GENERAL
A. Perform work using adequate numbers of personnel skilled in the appropriate trades and provide adequate supervision and management of the work.
B. All workmanship shall be of the highest standards. The piping system shall be laid out to insure a neat, systematic and orderly arrangement of all work.
Vertical piping lines shall be plumb. Exposed pipes, where indicated shall be run parallel with walls.
C. Obtain approval of shop drawings before proceeding with any fabrication of
IFB HCDA-CIP-2026-03 15400-6
materials or installation. Equipment shall be installed and located in conformity to detailed shop drawings.
3.02 PROTECTION OF MATERIALS AND EQUIPMENT
Pipe openings shall be closed with caps or plugs during installation. Equipment shall be tightly covered and protected against dirt, water and chemical or mechanical injury. At completion of the work, materials and equipment shall be thoroughly cleaned and in a condition satisfactory to the HCDA.
3.03 CUTTING AND PATCHING
A. The Contractor shall arrange for all cutting, fitting and patching necessary to accommodate the plumbing work as the job progresses and such cutting and patching shall be done by that trade experienced in the particular type of work required.
B. Where cutting framing or structural members is unavoidable, the Contractor shall obtain the approval of the HCDA before proceeding.
3.04 PIPING INSTALLATION
A. No pipe shall be closed up, furred in, buried or otherwise hidden until it has been inspected, tested, and approved by the Plumbing Inspector and the HCDA. Should any of the work be covered up or enclosed prior to all required inspections and approvals, uncover the work as required and, after it has been completely inspected and approved, make all repairs and replacements with such materials and workmanship as are necessary to the approval of the HCDA and at no additional cost to the HCDA.
B. All piping shall be inspected inside and out before installation and no obstructions shall be allowed. Pipe ends shall be taper reamed to full I.D.
and all burrs removed.
C. Anchor piping in building with approved clamps. Straps for copper tubing shall be copper or brass or copper plated. Where copper contacts ferrous materials, wrap with two layers of plastic tape.
D. Provide dielectric unions where copper piping is connected to ferrous pipe.
E. Install all piping generally level and plumb, free from traps, and in a manner to conserve space for other work.
F. Piping except where specifically shown otherwise shall be concealed in walls, utility chases, partitions, ceiling spaces and roof spaces. Piping shall be installed to maintain headroom and keep passageways and access openings clear. Where necessary, piping shall offset to maintain the required clearances to coincide with structural features of building.
IFB HCDA-CIP-2026-03 15400-7
G. Escutcheons shall be installed around all exposed pipe passing through a finished floor, wall, or ceiling. Escutcheons shall be of sufficient outside diameter to cover the sleeve opening and shall fit snugly around the pipe.
3.05 HANGERS
A. Hangers and supports for all pipe work shall be installed to provide for expansion and contraction, prevent vibrations, prevent sags, and maintain required grading by proper adjustment.
B. Support Spacing:
1. Hangers and supports shall be placed at each offset or change in direction, at ends of branches over five feet in length, at riser pipes and along piping as necessary.
2. Horizontal piping support spacing shall be as follows:
Steel and Copper: 1-1/4” and larger 8 ft.
1” and smaller 6 ft.
PVC: 1-1/2” - 4” 6 ft.
4” - 6” 4 ft.
3.06 PIPE INSULATION
Installation shall be performed by skilled mechanics and shall conform to the manufacturer’s printed instructions.
3.07 WATER SYSTEM
A. Cross Connections and Interconnections:
No plumbing devices or piping shall provide a cross connection or interconnection between a distribution supply for drinking or domestic purposes and a polluted supply such as a drainage system or a soil or waste pipe, so as to make possible the backflow of sewage, polluted water, or waste into the water supply system.
B. Pipe Joints:
1. All joints shall be tight; any joint found leaking when tested shall be completely rejoined and re-tested. Threaded joints shall be made up with approved, non-hardening thread lubricant and screwed tight.
2. Provide dielectric unions where copper tubing connects to steel pipe.
C. Pipe Testing:
Contractor shall furnish all equipment for tests and any required retests and
IFB HCDA-CIP-2026-03 15400-8
pay for all cost of repairing any damage resulting from such tests.
Contractor shall adjust systems until they are approved. Tests shall be performed in the presence of, and to the satisfaction of the HCDA and inspector of the HCDA.
1. Water piping shall be tested in accordance with the Plumbing Code.
Water piping shall be tested at 150 psig.
2. Any faulty or defective material or installation workmanship discovered at this time shall be replaced by Contractor at no cost to the HCDA.
D. Pipe Disinfection of Water Lines:
1. All domestic hot water and hot water return lines shall be thoroughly flushed and drained after installation. Sterilization shall be accomplished by opening taps at the end of all branches, and slowly filling the system adding liquid chlorine, or hypochlorite solution, to the water until water flowing from all branches indicates not less than 200 P.P.M. residual chlorine; the system allowed to stand for not less than three (3) hours, with all valves opened and closed several times during this period; then drained and thoroughly flushed until all traces of chlorine are eliminated (less than 0.2 P.P.M.) Certificate shall be submitted to the Project Engineer. The Contractor shall be responsible for the proper disposal of chlorinated water to safeguard public health and environment in accordance with applicable Department of Health requirements.
3.08 CLEAN UP AND REPAIRS
A. Debris shall not be allowed as a result of this work. Upon completion of this work, remove all debris and excess materials, tools, etc., resulting from this work from the jobsite and leave the locations of this work broom-clean and in acceptable manner as approved by the HCDA.
B. This Contractor shall clean all equipment set by him of oil, grease, stains, etc. All plates, trims, etc., shall be polished.
C. All equipment piping and lines shall be thoroughly cleaned before leaving the work.
END OF SECTION