Exhibit B - Schedule of Unit Rates.pdf
PDF 350 KB Posted
- Attached to
- 2027 Milling and Resurfacing Project
- Solicitation number
- 146156
- Issued by
- Polk County, Florida
About this file
This is a Schedule of Unit Rates document (Exhibit B) for the Central Florida Tourism Oversight District's 2027 Milling and Resurfacing Project, issued under Invitation to Bid C007139 dated September 9, 2026. The document establishes unit pricing for potential additions and deletions to the contract work as directed by the Owner. The unit price schedule covers 120 line items organized into four categories: Erosion Control (items 1-18), Temporary Traffic Control and Striping (items 19-59), Roadway Work (items 60-75), and Signage and Striping plus Landscape (items 76-120). These items include silt fencing, mowing, traffic control devices, temporary striping in various widths and configurations, milling of existing asphalt at different depths, structural course placement, curb and gutter installation, and sod installation. The document specifies that unit prices remain in effect for the duration of the contract and apply to both additions and deletions on a net quantity basis.
All unit price items are inclusive of materials, labor, equipment, permits, supervision, engineering, taxes, insurance, overhead, and profit. The document requires bidders to submit detailed labor wage rates for specified categories (Foreman, Skilled Laborers, and Unskilled Laborers) with separate straight-time and overtime rates, as well as hourly, daily, weekly, and monthly rates for contractor-owned equipment. Hourly wage rates and equipment rates are all-inclusive and remain fixed through contract completion. The basis of award is the lowest combined bidding for the Base Bid. Overtime rates apply to hours exceeding 40 per week on a five-day work week basis. The Owner reserves the right to utilize unit pricing, lump sum pricing, or time and material pricing as determined in accordance with the General Conditions of the Contract for Construction.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT Exhibit “B”
2027 Milling & Resurfacing Project Schedule of Unit Prices
Invitation to Bid: C007139 September 9, 2026
EXHIBIT “B”
SCHEDULE OF UNIT PRICES
In accordance with Article 12 of the General Conditions of the Contract for Construction, the following Unit Price
Schedule may be used for additions and/or deletions to the Contract Work as the Owner may direct.
1. Unit Price items shall be inclusive of all items of expense, including but not limited to applicable materials (delivered to the Job Site and unloaded), labor (including receiving, handling, scaffolding, distributing, storing, hoisting, installation, clean-up and protection), equipment, drafting services, trucking, permits, appliances, supervision, engineering, taxes, insurance, overhead, profit and bonds.
2. Except where specific exceptions are indicated, it is understood that all equipment and material to be furnished is to be identical with that which is called for in the Specifications.
3. The Unit Price indicated for each item hereinafter described shall remain in effect for the duration of the Contract and shall apply to both additions and deletions. Any changes in the Work shall be computed on a net quantity basis multiplied by the Unit Price.
4. The Owner reserves the right to choose Unit Price; Lump Sum; or Time & Material pricing in accordance with Article 12 of the GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION.
Item Description Unit Unit Cost
Erosion Control
1 Silt Fence LF
2 Double Row Silt Fence LF
3 Mowing AC
4 Inlet Protection Device EA
5 Soil Tracking Prevention Trap (Temporary) EA
6 Artificial Coverings / Roll Erosion Control SY
7 Power Broom ED
8 Street Sweeper (With Vacuum Pick-up) ED
MOT
9 Work Zone Sign ED
10 Portable Changeable Message Sign, Temp. ED
11 Arrow Board /Advance Warning Arrow Panel ED
12 Temp. Barricades - Types I, II, DI, VP, Drum, LC ED
13 Temp. Barricades – Type III, 6' ED
14 High Intensity Flash LI, Temp, Type B ED
15 Traffic Control Off-Duty Law Enforcement Officer MH
16 MOT Crew & Equipment ED
17 Temporary Paint Striping 4” Yellow Rumble Strips GM
18 Temporary Paint Striping 6” White GM
Invitation to Bid: C007139 September 9, 2026
Item Description Unit Unit Cost
19 Temporary Paint Striping 6” Yellow GM
20 Temporary Paint Striping 6” Double Yellow GM
21 Temporary Paint Striping 6” White (3’-9’ Skip) w/ W/R RPMS @24’ GM
22 Temporary Paint Striping 6” Double Yellow w/ Y/Y RPMS @10’ GM
23 Temporary Paint Striping 6” White w/ W/R RPMS @20’ GM
24 Temporary Paint Striping 6” White (2’-4’ Skip) GM
25 Temporary Paint Striping 6” White (6’-10’ Skip) GM
26 Temporary Paint Striping 6” White (10’-30’ Skip) w/ W/R RPMS @40’ GM
27 Temporary Paint Striping 6” Yellow (6’-10’ Skip) GM
28 Temporary Paint Striping 6” Yellow (2’-4’ Skip) GM
29 Temporary Paint Striping 6” White (3’-9’ Skip) GM
30 Temporary Paint Striping 6” White w/ W/R RPMS @40’ GM
31 Temporary Paint Striping 6” Yellow w/ Y/Y RPMS @10’ GM
32 Temporary Paint Striping 6” Yellow w/ Y/Y RPMS @40’ GM
33 Temporary Paint Striping 6” Double Yellow w/ Y/Y RPMS @20’ GM
34 Temporary Paint Striping 6” Double Yellow – Black Contrast (Paint) GM
35 Temporary Paint Striping 6” White – Black Contrast (Paint) GM
36 Temporary Paint Striping 6” Double Yellow w/ Y/Y RPMS @40’ GM
37 Temporary Paint Striping 6” Yellow – Black Contrast (Paint) GM
38 Temporary Paint Striping 6” White – Black Contrast (Paint) (10’-30’ Skip) GM
39 Temporary Paint Striping 8” White GM
40 Temporary Paint Striping 8” Yellow GM
41 Temporary Paint Striping 8” White w/ W/R RPMS @40’ GM
42 Temporary Paint Striping 8” White @6’ GM
43 Temporary Paint Striping 8” White @10’ GM
44 Temporary Paint Striping 8” White w/ W/R RPMS @10’ GM
45 Temporary Paint Striping 8” White w/ W/R RPMS @20’ GM
46 Temporary Paint Striping 12” White GM
47 Temporary Paint Striping 12” Yellow GM
48 Temporary Paint Striping 12” White (3’-9’ Skip) w/ W/R RPMS @24’ GM
49 Temporary Paint Striping 12” Yellow @4’ GM
50 Temporary Paint Striping 18” Yellow GM
51 Temporary Paint Striping 18” Yellow @10’ GM
52 Temporary Paint Striping 18” White @7’ GM
53 Temporary Paint Striping 18” White @10’ GM
54 Temporary Paint Striping 18” White @20’ GM
55 Temporary Paint Striping 24” White GM
56 Temporary Paint Striping 24” White @6’ GM
57 Temporary Paint Striping MD/W RPMS @8’ GM
58 Temporary Paint Striping Yellow REFL Paint w/ MD/Y RPMS @ 8’ GM
59 Temporary Paint Striping Yellow REFL Paint w/ MD/Y RPMS @ 12’ GM
Invitation to Bid: C007139 September 9, 2026
Item Description Unit Unit Cost
Roadway
60 Friction Course FC-12.5 Traffic E (PG 82-22) (1.5”) TN
61 Type SP Structural Course (Traffic E) (PG 82-22) (3.5”) TN
62 Type SP Structural Course (Traffic E) (PG 82-22) (3”) TN
63 Type SP Structural Course (Traffic E) (PG 82-22) (2.5”) TN
64 Type SP Structural Course (Traffic E) (PG 82-22) (2”) TN
65 Type SP Structural Course (Traffic E) (PG 82-22) (1.5”) TN
66 Patterned Pavement SY
67 Mill Existing Asphalt Pavement Average Depth 5” SY
68 Mill Existing Asphalt Pavement Average Depth 4.5” SY
69 Mill Existing Asphalt Pavement Average Depth 4” SY
70 Mill Existing Asphalt Pavement Average Depth 3.5” SY
71 Mill Existing Asphalt Pavement Average Depth 1.5” SY
72 Concrete Header Curb Removal LF
73 Type F Curb & Gutter LF
74 Type E Curb & Gutter LF
75 Concrete Barrier Wall LF
Signage and Striping
76 4” Yellow Rumble Strips GM
77 6” White GM
78 6” Yellow GM
79 6” Double Yellow GM
80 6” White (3’-9’ Skip) w/ W/R RPMS @24’ GM
81 6” Double Yellow w/ Y/Y RPMS @10’ GM
82 6” White w/ W/R RPMS @20’ GM
83 6” White (2’-4’ Skip) GM
84 6” White (6’-10’ Skip) GM
85 6” White (10’-30’ Skip) w/ W/R RPMS @40’ GM
86 6” Yellow (6’-10’ Skip) GM
87 6” Yellow (2’-4’ Skip) GM
88 6” White (3’-9’ Skip) GM
89 6” White w/ W/R RPMS @40’ GM
90 6” Yellow w/ Y/Y RPMS @10’ GM
91 6” Yellow w/ Y/Y RPMS @40’ GM
92 6” Double Yellow w/ Y/Y RPMS @20’ GM
93 6” Double Yellow – Black Contrast (Paint) GM
94 6” White – Black Contrast (Paint) GM
95 6” Double Yellow w/ Y/Y RPMS @40’ GM
96 6” Yellow – Black Contrast (Paint) GM
97 6” White – Black Contrast (Paint) (10’-30’ Skip) GM
98 8” White GM
Invitation to Bid: C007139 September 9, 2026
Item Description Unit Unit Cost
99 8” Yellow GM
100 8” White w/ W/R RPMS @40’ GM
101 8” White @6’ GM
102 8” White @10’ GM
103 8” White w/ W/R RPMS @10’ GM
104 8” White w/ W/R RPMS @20’ GM
105 12” White GM
106 12” Yellow GM
107 12” White (3’-9’ Skip) w/ W/R RPMS @24’ GM
108 12” Yellow @4’ GM
109 18” Yellow GM
110 18” Yellow @10’ GM
111 18” White @7’ GM
112 18” White @10’ GM
113 18” White @20’ GM
114 24” White GM
115 24” White @6’ GM
116 MD/W RPMS @8’ GM
117 Yellow REFL Paint w/ MD/Y RPMS @ 8’ GM
118 Yellow REFL Paint w/ MD/Y RPMS @ 12’ GM
Landscape
119 Sod (Bahia) SY
120 Sod (St. Augustine) SY
END OF EXHIBIT “B”
Invitation to Bid: C007139 September 9, 2026
SCHEDULE OF UNIT PRICES
Unit Prices may be utilized as the basis for adjustments to the Contract Sum for additions to and deletions from the
Contract Work, as the Owner may direct, in accordance with Article 12 of the General Conditions of the Contract for
Construction. All Hourly Rates (labor wages and equipment rates) are inclusive of Contractor’s overhead, profit and cost of all employee burdens, benefits, insurance and Worker’s Compensation coverage. The Contractor shall provide, as supporting data, evidence of the direct cost of labor, Contractor’s overhead, profit and each category of employee burden, benefit and related cost. Overtime rates are applicable to a five-day work week for hours worked in excess of 40 hours per week, excluding weekends and holidays.
A. Hourly Wage Rates:
The Bidder shall list each labor category applicable to the performance of the Contract Work and provide the corresponding wage rates for each in the table below.
Wage rates shall remain in effect through Contract Completion
Labor Category Total Straight Time
Wage Rate
Total Overtime
Wage Rate
Foreman $__________ $__________
Laborer – Skilled $__________ $__________
Laborer - Unskilled $__________ $__________
Invitation to Bid: C007139 September 9, 2026
B. Contractor-owned Equipment Rates:
The table below lists each type of Contractor-owned equipment to be utilized in the performance of the
Work and the hourly, daily, weekly and monthly rate corresponding to each. Each and every listed rate is an all-inclusive rate, which includes but is not necessarily limited to, the cost of purchasing, leasing, maintaining, licensing, transporting and fueling the equipment, the Contractor’s overhead and any profit to be derived by the Contractor from the use of the equipment pursuant to the Agreement, and is not subject to additional markup by the Contractor. Each and every equipment rate shall remain in effect for the duration of the Contract and shall apply for the purpose of calculating changes to the amount of the Contract Sum attributable to both additions to and deletions from the Work (collectively, changes to the Work). Any costs for such equipment that are attributable to changes to the Work shall be computed on a net hourly, daily, weekly or monthly basis, as applicable, multiplied by the corresponding rate. The rates applied in such computations shall be strictly applied in the following manner: the hourly rate shall be applied when the equipment is utilized for less than one (1) eight-hour day; the daily rate shall be applied when the equipment is utilized for more than one (1) but less than five (5) consecutive days; the weekly rate shall be applied when the equipment is utilized for more than five (5) consecutive days but less than four (4) consecutive weeks; and, the monthly rate shall be applied when the equipment is utilized for four (4) or more consecutive weeks, including any net portions thereof, which shall be applied on a prorated basis. The equipment rates set forth below are exclusive of the cost of Labor, if any, that is necessary to operate the equipment. The equipment rates included in the list below do not apply to rented equipment, the costs for which are subject to the corresponding provisions set forth in Article 12 of the General Conditions of the Contract for
Construction.
The Bidder shall list each type of Contractor-owned equipment applicable to the performance of the Contract
Work and provide the corresponding daily, weekly and monthly rate for each in the table below.
ATTACHMENT 'A' OF EXHIBIT 'B'
EQUIPMENT TYPE
(LIST)
HOURLY
RATE
DAILY
RATE
WEEKLY
RATE
MONTHLY RATE
| LF: |
| LF_2: |
| AC: |
| EA: |
| EA_2: |
| SY: |
| ED: |
| ED_2: |
| ED_3: |
| ED_4: |
| ED_5: |
| ED_6: |
| ED_7: |
| ED_8: |
| MH: |
| ED_9: |
| GM: |
| GM_2: |
| Unit CostGM: |
| Unit CostGM_2: |
| Unit CostGM_3: |
| Unit CostGM_4: |
| Unit CostGM_5: |
| Unit CostGM_6: |
| Unit CostGM_7: |
| Unit CostGM_8: |
| Unit CostGM_9: |
| Unit CostGM_10: |
| Unit CostGM_11: |
| Unit CostGM_12: |
| Unit CostGM_13: |
| Unit CostGM_14: |
| Unit CostGM_15: |
| Unit CostGM_16: |
| Unit CostGM_17: |
| Unit CostGM_18: |
| Unit CostGM_19: |
| Unit CostGM_20: |
| Unit CostGM_21: |
| Unit CostGM_22: |
| Unit CostGM_23: |
| Unit CostGM_24: |
| Unit CostGM_25: |
| Unit CostGM_26: |
| Unit CostGM_27: |
| Unit CostGM_28: |
| Unit CostGM_29: |
| Unit CostGM_30: |
| Unit CostGM_31: |
| Unit CostGM_32: |
| Unit CostGM_33: |
| Unit CostGM_34: |
| Unit CostGM_35: |
| Unit CostGM_36: |
| Unit CostGM_37: |
| Unit CostGM_38: |
| Unit CostGM_39: |
| Unit CostGM_40: |
| Unit CostGM_41: |
| TN: |
| TN_2: |
| TN_3: |
| TN_4: |
| TN_5: |
| TN_6: |
| SY_2: |
| SY_3: |
| SY_4: |
| SY_5: |
| SY_6: |
| SY_7: |
| LF_3: |
| LF_4: |
| LF_5: |
| LF_6: |
| GM_3: |
| GM_4: |
| GM_5: |
| GM_6: |
| GM_7: |
| GM_8: |
| GM_9: |
| GM_10: |
| GM_11: |
| GM_12: |
| GM_13: |
| GM_14: |
| GM_15: |
| GM_16: |
| GM_17: |
| GM_18: |
| GM_19: |
| GM_20: |
| GM_21: |
| GM_22: |
| GM_23: |
| GM_24: |
| GM_25: |
| Unit CostGM_42: |
| Unit CostGM_43: |
| Unit CostGM_44: |
| Unit CostGM_45: |
| Unit CostGM_46: |
| Unit CostGM_47: |
| Unit CostGM_48: |
| Unit CostGM_49: |
| Unit CostGM_50: |
| Unit CostGM_51: |
| Unit CostGM_52: |
| Unit CostGM_53: |
| Unit CostGM_54: |
| Unit CostGM_55: |
| Unit CostGM_56: |
| Unit CostGM_57: |
| Unit CostGM_58: |
| Unit CostGM_59: |
| Unit CostGM_60: |
| Unit CostGM_61: |
| SY_8: |
| SY_9: |
| Foreman: |
| undefined: |
| undefined_2: |
| Laborer Skilled: |
| undefined_3: |
| undefined_4: |
| undefined_5: |
| undefined_6: |
| Laborer UnskilledRow1: |
| undefined_7: |
| undefined_8: |
| Laborer UnskilledRow2: |
| undefined_9: |
| undefined_10: |
| Laborer UnskilledRow3: |
| undefined_11: |
| undefined_12: |
| Laborer UnskilledRow4: |
| undefined_13: |
| undefined_14: |
| Laborer UnskilledRow5: |
| undefined_15: |
| undefined_16: |
| Laborer UnskilledRow6: |
| undefined_17: |
| undefined_18: |
| Laborer UnskilledRow7: |
| undefined_19: |
| undefined_20: |
| Laborer UnskilledRow8: |
| undefined_21: |
| undefined_22: |
| Laborer UnskilledRow9: |
| undefined_23: |
| undefined_24: |
| Laborer UnskilledRow10: |
| undefined_25: |
| undefined_26: |
| Laborer UnskilledRow11: |
| undefined_27: |
| undefined_28: |
| Laborer UnskilledRow12: |
| undefined_29: |
| undefined_30: |
| Laborer UnskilledRow13: |
| undefined_31: |
| undefined_32: |
| Laborer UnskilledRow14: |
| undefined_33: |
| undefined_34: |
| Laborer UnskilledRow15: |
| undefined_35: |
| undefined_36: |
| EQUIPMENT TYPE LISTRow1: |
| undefined_37: |
| undefined_38: |
| undefined_39: |
| EQUIPMENT TYPE LISTRow2: |
| undefined_40: |
| undefined_41: |
| undefined_42: |
| EQUIPMENT TYPE LISTRow3: |
| undefined_43: |
| undefined_44: |
| undefined_45: |
| EQUIPMENT TYPE LISTRow4: |
| undefined_46: |
| undefined_47: |
| undefined_48: |
| EQUIPMENT TYPE LISTRow5: |
| undefined_49: |
| undefined_50: |
| undefined_51: |
| EQUIPMENT TYPE LISTRow6: |
| undefined_52: |
| undefined_53: |
| undefined_54: |
| EQUIPMENT TYPE LISTRow7: |
| undefined_55: |
| undefined_56: |
| undefined_57: |
| EQUIPMENT TYPE LISTRow8: |
| undefined_58: |
| undefined_59: |
| undefined_60: |
| EQUIPMENT TYPE LISTRow9: |
| undefined_61: |
| undefined_62: |
| undefined_63: |
| EQUIPMENT TYPE LISTRow10: |
| undefined_64: |
| undefined_65: |
| undefined_66: |
| EQUIPMENT TYPE LISTRow11: |
| undefined_67: |
| undefined_68: |
| undefined_69: |
| EQUIPMENT TYPE LISTRow12: |
| undefined_70: |
| undefined_71: |
| undefined_72: |
| EQUIPMENT TYPE LISTRow13: |
| undefined_73: |
| undefined_74: |
| undefined_75: |
| EQUIPMENT TYPE LISTRow14: |
| undefined_76: |
| undefined_77: |
| undefined_78: |
| EQUIPMENT TYPE LISTRow15: |
| undefined_79: |
| undefined_80: |
| undefined_81: |
| EQUIPMENT TYPE LISTRow16: |
| undefined_82: |
| undefined_83: |
| undefined_84: |
| 1_2: |
| 2_2: |
| 3_2: |
| 4_2: |
| 5_2: |
| 6_2: |
| 7_2: |
| 8_2: |
| 9_2: |
| 10_2: |
| 11_2: |
| 12_2: |
| 13_2: |
| 14_2: |
| 15_2: |
| 16_2: |
File details come from the government source that posted it. Updated .