Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-59IF.xls

XLS spreadsheet 38 KB Posted

Attached to
El Portal Vehicular Beach Access Ramp
Solicitation number
26-B-59IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida's Invitation for Bid 26-B-59IF, requiring bidders to document all proposed subcontractors and work allocations for Contract C-2075, the El Portal Vehicular Beach Access Ramp reconstruction project. The form mandates that bidders list the prime contractor and all subcontractors with their respective dollar values and percentage of work across specified disciplines including demolition and hauling, site security fencing, excavation and grading, coffer dam and dewatering, sheet pile installation, concrete, pavement paint and marking, signage, testing, and surveying. Bidders must complete all green-shaded cells designating dollar values for each contractor (prime and subcontractors), with all other calculations to be automatically generated; the total bid price must equal 100 percent and match the amount submitted on Exhibit G - Bid Price Sheet. Failure to complete and return this form may result in a non-responsive bid determination. The prime contractor bears responsibility for ensuring all subcontractors maintain appropriate licenses, and any subcontractor changes during project completion require prior written approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractor qualifications but will not permit modifications to the total base bid pricing.

The form serves the dual purpose of documenting subcontractor participation and determining local bid preference in accordance with solicitation requirements, though the related procurement indicates no local preference provisions apply due to FEMA funding restrictions. The estimated construction cost is $1,464,420.00, with the project funded through federal FEMA resources requiring compliance with Davis-Bacon Act wage standards and domestic preference mandates for U.S.-produced materials. Federal requirements mandate affirmative efforts to contract with small and minority businesses, women's business enterprises, and labor surplus area firms, though no specific set-asides are designated. Bidders must submit a bid bond equal to 5 percent of total bid price, with payment and performance bonds of 100 percent of contract price required upon award per Florida Statute 255.05.

View the file

Other files

File Type Posted
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS_-_USE_THIS_FORM_ONLY.xlsx XLSX spreadsheet
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#2_Revision).pdf PDF
Exhibit_E_-_Technical_Specifications_03.23.2026_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.docx DOCX document
Exhibit_D_-_Construction_Plans_26-B-59IF_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-59IF_-_REVISED_03.10.2026.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp.pdf PDF
Exhibit_L_-_Installation_Floater_Affidavit_26-B-59IF.docx DOCX document
Exhibit_K_-_Federal_Contract_Provisions_26-B-59IF.pdf PDF
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_I_-_Survey_26-B-59IF.pdf PDF
Exhibit_H_-_Geotechnical_Report_26-B-59IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures_26-B-59IF.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-59IF.pdf PDF
Exhibit_D_-_Construction_Plans_26-B-59IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-59IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-59IF.xls XLS spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-59IF.pdf PDF
Drawings_-_EL_PORTAL.pdf PDF
2026-02-03_Final_Design_Tech_Specs.pdf PDF
4_-_Geotechnical_Report.pdf PDF
3_-_Survey.pdf PDF
1_-_FDEP_CCCL_VO002489_AR_FO.pdf PDF
2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2075ITB No. 26-B-59IF
EXHIBIT B - PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Demolition and Hauling$ - 00.00%
Site Security Fencing$ - 00.00%
Excavation Grading and Site Work$ - 00.00%
Coffer Dam and Dewatering$ - 00.00%
Sheet Pile Installation$ - 00.00%
Concrete$ - 00.00%
Pavement Paint and Marking$ - 00.00%
Signage$ - 00.00%
Testing$ - 00.00%
Surveyor$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .