Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-59IF.xls
XLS spreadsheet 38 KB Posted
- Attached to
- El Portal Vehicular Beach Access Ramp
- Solicitation number
- 26-B-59IF
- Issued by
- Volusia County, Florida
About this file
This is an Exhibit B Prime/Subcontractor Form for Volusia County, Florida's reconstruction of the El Portal Vehicular Beach Access Ramp (Contract C-2075, ITB 26-B-59IF). The form requires bidders to identify all prime contractor and subcontractor involvement in the project, including specific work disciplines such as demolition and hauling, site security fencing, excavation and grading, coffer dam and dewatering, sheet pile installation, concrete work, pavement paint and marking, signage, testing, and surveying. Bidders must complete the form by assigning dollar values and percentages of work to each entity, with all green-shaded cells requiring completion to designate contractor participation. The total bid price submitted on this form must match the total bid price on Exhibit G—Bid Price Sheet. The form explicitly states that failure to complete and return it may result in a non-responsive bid, and any subcontractor changes during project execution require prior approval from the County Project Manager.
The form serves dual purposes: it documents the contractor composition for project tracking and establishes local preference determination in accordance with the solicitation requirements. All cells except those shaded green are automatically calculated, with the total percentage of work required to equal 100 percent across all prime and subcontractor assignments. Contractors performing self-directed work must note "self performing" in the appropriate line item with corresponding zero-dollar and zero-percent values. The Prime Contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and the County reserves the right to seek clarification on subcontractor qualifications while maintaining the fixed total base bid pricing throughout the contract term.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2075 | ITB No. 26-B-59IF | ||||
| EXHIBIT B - PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition and Hauling | $ - 0 | 0.00% | |
| Site Security Fencing | $ - 0 | 0.00% | |
| Excavation Grading and Site Work | $ - 0 | 0.00% | |
| Coffer Dam and Dewatering | $ - 0 | 0.00% | |
| Sheet Pile Installation | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Pavement Paint and Marking | $ - 0 | 0.00% | |
| Signage | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| Surveyor | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .