COOS BAY DISTRICT 7 OFFICE REMODEL – PROJECT SPECIFICATIONS
This document is a Project Manual and specifications exhibit for the Oregon Department of Transportation (ODOT) Coos Bay District 7 Office Remodel, located at 1155 S 5th Street, Coos Bay, Oregon 97420 (Project Number F4060901). The scope of work encompasses selective demolition of existing demountable and wood-framed walls, relocation of selected demountable walls, construction of new wood-framed walls, construction of a new ADA-compliant restroom, installation of new electrical and data ports, relocation of ceiling-mounted lighting fixtures, installation of a new transaction window, and miscellaneous related items. Work is divided into multiple construction divisions including selective demolition, rough carpentry, hollow metal frames, flush wood doors, vinyl windows, door hardware, gypsum board, resilient flooring and base, interior painting, high-performance coatings, and restroom accessories. Construction operating hours are limited to 0600 to 1700 Monday through Friday, with any deviations requiring Construction Project Manager (CPM) Jose R Franco-Ramos approval. The project site is partially occupied by the Oregon Department of Vehicles (DMV), requiring that construction activities not disrupt DMV operations through noise, dust, or other impacts. A preconstruction meeting must occur no later than five business days following the Notice to Proceed (NTP). The contractor must provide one female and one male ADA-compliant portable toilet for DMV personnel and clients, cleaned and serviced weekly, and maintain all existing utilities serving the occupied portion of the building.
The specifications establish detailed submittal and coordination procedures requiring contractors to submit action and informational submittals in PDF format to the CPM with a minimum 10-day review period. Substitution requests are permitted only during the bidding process, submitted a minimum of seven days prior to bid closing. The contract documents indicate that ODOT has submitted documents for plan review with local Authorities Having Jurisdiction and will pay the plan review fee; however, the contractor is responsible for obtaining and paying for all construction and trades permits. All equipment must include functional muffling devices, and high-noise operations require two-day advance CPM notification and written approval. The contractor must use dust control barriers during demolition, provide fire extinguishers on site, and comply with construction waste management and recycling requirements. Lock cores and finished hardware will be provided by ODOT following construction completion. As-built drawings must be submitted as one paper copy upon project closeout.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COOS BAY DISTRICT 7 OFFICE
REMODEL
Coos Bay, Oregon
Prepared by Oregon Department of Transportation
1155 S 5th ST Coos Bay Oregon 97420
Project Number F4060901
PROJECT
MANUAL
Oregon Department of Transportation F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
- 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
000110 Table of Contents
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY
012500 SUBSTITUTION PROCEDURES
013100 PROJECT MANAGEMENT AND COORDINATION
013300 SUBMITTAL PROCEDURES
015000 TEMPORARY FACILITIES AND CONTROLS
016000 PRODUCT REQUIREMENTS
017300 EXECUTION
017419 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
017700 CLOSEOUT PROCEDURES
017839 PROJECT RECORD DOCUMENTS
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
072100 THERMAL INSULATION
DIVISION 08 - OPENINGS
081213 HOLLOW METAL FRAMES
081416 FLUSH WOOD DOORS
085313 VINYL WINDOWS
087100 DOOR HARDWARE
DIVISION 09 - FINISHES
092900 GYPSUM BOARD
096513 RESILIENT BASE AND ACCESSORIES
096516 RESILIENT SHEET FLOORING
099124 INTERIOR PAINTING (MPI STANDARDS)
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
- 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
099600 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
102800 TOILET, BATH, AND LAUNDRY ACCESSORIES
FACILITY SERVICES SUBGROUP
DIVISION 22 - PLUMBING
224200 COMMERCIAL PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
233400 HVAC FANS
DIVISION 26 - ELECTRICAL
260000 BASIC ELECTRICAL REQUIREMENTS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
281500 ACCESS CONTROL DEVICES
END OF TABLE OF CONTENTS
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUMMARY 011000 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Time of commencement and completion.
4. Contractor's use of site and premises.
5. Excessive noise.
6. Coordination with occupants.
7. Work restrictions.
8. Specification and Drawing conventions.
9. Dust Control Barrier.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
1.2 PROJECT INFORMATION
A. Project Identification: ODOT Coos Bay District 7 Office Remodel.
1. Project Location: 1155 S 5th St, Coos Bay, OR 97420.
B. Owner: Oregon Department of Transportation, 885 Airport Rd SE Bldg X, Salem, Oregon 97301.
C. Construction Project Manager (CPM): Oregon Department of Transportation, 885 Airport Rd SE, Bldg. X, Salem, Oregon, 97301 97301 .
1. CPM: Jose R Franco-Ramos (Franco), jose.r.franco-ramos@odot.oregon.gov, cell phone 503.930.9177 (CPM).
2. Project Architect: Mike Schweizer, mike.schweizer@odot.oregon.gov, cell phone 541.602.5705.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following: Demolition of existing demountable and wood framed walls and relocation of selected demountable walls and new wood framed walls, construction of a new ADA restroom, addition of new electrical and data ports, relocation of ceiling mounted
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUMMARY 011000 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
lighting, new transaction window and related miscellaneous items.
1.4 TIME OF COMMENCEMENT AND COMPLETION
A. Notice to proceed: A written notice to proceed will be provided by the Construction Project Manager (CPM) to the Contractor as indicated in the invitation to bid. The Contractor shall begin the work upon receipt of the notice to proceed. Notwithstanding any other provision of the contract the Owner shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed, whether or not the Owner has knowledge of the furnishing of work.
1.5 CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS
A. Contractor shall be supplied electronically, with one set of full-size drawings, half size reduced drawings and specifications. At least one complete set of contract documents, including one full-size set of drawings shall be kept at the site of construction in good condition, and at all times available to the CPM.
1.6 PERMITS AND FEES
A. Other than noted the acquisition of all required permits, and payment of all fees, inspection charges and other similar costs shall be the responsibility of the contractor.
ODOT has submitted documents for plan review with the local Authorities Having Jurisdiction and will pay the Plans Review fee. The Contractor shall be responsible for obtaining and paying for all other construction and trades permits as may be required by Federal, State and Local Officials.
1.7 CONTRACTOR'S USE OF SITE AND PREMISES
A. Construction Operating Hours: Operating hours shall be limited to 0600 to 1700 Monday through Friday. Deviations from noted hours shall be with approval by CPM.
B. A portion of the building is occupied by the Oregon Department of Vehicles (DMV).
Construction activities shall be conducted such that the DMV operation is not impacted by noise, dust and construction activities.
C. Limits on Use of Site: Contractors lay down/staging area will be coordinated through CPM. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Driveways, Walkways, Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUMMARY 011000 - 3
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
1.8 EXCESSIVE NOISE
A. All equipment shall have muffling devices in good working order at all times. Equipment not so equipped will be removed from site.
B. Cooperate with Owner in locating high noise producing equipment in areas least offensive and/or provide sound enclosure or shielding to dampen sound.
C. Playing of loud music or similar noise will not be allowed at the work site.
1.9 WORK RESTRICTIONS
A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify CPM not less than two days in advance of proposed utility interruptions.
2. Obtain CPM permission in writing before proceeding with utility interruptions.
B. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.
1. Notify CPM not less than two days in advance of proposed disruptive operations.
2. Obtain CPM written permission before proceeding with disruptive operations.
3. Provide a dust control barrier, as noted on the Demolition Plan, for the duration of the project or until removal is approved by the CPM.
C. Smoking and Controlled Substance Restrictions: Use of tobacco products , alcoholic beverages, and other controlled substances on Project site is not permitted.
PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUBSTITUTION PROCEDURES 012500 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 012500 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 Substitution Requests.
A. Substitution requests shall be made only by the General Contractor
B. Substitution Requests shall be submitted to the Purchasing Agent identified in OregonBuys.
C. Substitution requests shall be allowed only during bidding process.
D. Substitution requests shall be submitted to the Purchaser a minimum of seven days prior to bid closing date.
E. PCS will request additional information or issue acceptance or rejection within two days.
F. Documentation:
1. Justification.
2. Coordination information.
3. Detailed comparison.
4. Product Data.
5. Samples.
6. Certificates and qualification data.
7. List of similar installations.
8. Material test reports.
9. Research reports.
10. Detailed comparison of Contractor's construction schedule.
11. Cost information.
1.2 SUBSTITUTIONS
A. Substitutions for Convenience: Not allowed.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 012500
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PROJECT MANAGEMENT AND
COORDINATION
013100 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Description
2. General coordination procedures.
3. Coordination drawings.
4. Requests for Information (RFI's).
5. Project meetings.
6. Terms
1.2 DESCRIPTION
A. The Contractor shall coordinate with the CPM during the duration of the project.
1. The Contractor will be responsible for keeping the CPM informed of all activity throughout the project identified in this Contract.
1.3 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.
Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Coordinate with installation contractors hired directly by ODOT.
B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's construction schedule.
2. Preparation of the schedule of values.
3. Installation and removal of temporary facilities and controls.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PROJECT MANAGEMENT AND
COORDINATION
013100 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
1.4 QUALITY ASSURANCE
A. Throughout the progress of the work, the Contractor shall provide all necessary personnel thoroughly familiar with the Specifications and Drawings, completely trained and experienced in the necessary skills, who shall be present at the site and direct all work performed.
B. Conditions of Surfaces: Surfaces previously prepared or installed by another trade shall be inspected carefully before applying subsequent materials or finishes. If an unsatisfactory condition to that finish exists, notify the General Contractor and CPM in writing immediately. Otherwise assume full responsibility for resulting appearance, condition and acceptance of finished surfaces.
C. Covering Up: No Contractor or Subcontractor shall cover up work or conceal work of other Contractor/Subcontractor until same has been inspected and/or approved.
1.5 REQUEST FOR INFORMATION (RFI)
A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. CPM will return without response those RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Owner name.
2. Project Name
3. Name of CPM.
4. Date.
5. Name of Contractor.
6. RFI number, numbered sequentially.
7. RFI subject.
8. Specification Section number and title and related paragraphs, as appropriate.
9. Drawing number and detail references, as appropriate.
10. Field dimensions and conditions, as appropriate.
11. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state schedule and cost impact in the RFI.
12. Contractor's signature.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PROJECT MANAGEMENT AND
COORDINATION
013100 - 3
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
C. RFI Forms: Electronic format containing information as noted above. Software-generated form with substantially the same content as indicated above, acceptable to the CPM.
D. RFI's will be reviewed to determine action required, and response. Allow five days for CMP response to each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.
1. The following Contractor-generated RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract
Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of review actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. CPM's action may include a request for additional information, in which case CPM's time for response will date from time of receipt.
3. CPM's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal in accordance with General Provisions.
a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify CPM in writing within three days of receipt of the RFI response.
1.6 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.
B. Preconstruction Meeting: A preconstruction meeting, before starting construction, at a time convenient to Owner and CPM, but no later than five business days following
NTP.
1. Attendees: Authorized representatives of Owner and their consultants;
Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PROJECT MANAGEMENT AND
COORDINATION
013100 - 4
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
a. Responsibilities and personnel assignments.
b. Tentative construction schedule.
c. Coordination between Contractor and CPM.
d. Critical work sequencing and long lead items.
e. Designation of key personnel and their duties.
f. Subcontractor company, personnel names, and contact information.
g. Lines of communications.
h. Procedures for processing field decisions and Change Orders.
i. Procedures for RFIs.
j. Procedures for testing and inspecting.
k. Procedures for processing Applications for Payment.
l. Distribution of the Contract Documents.
m. Submittal procedures.
n. Preparation of Record Documents.
o. Use of the premises.
p. Work restrictions.
q. Working hours.
r. Owner's occupancy requirements.
s. Responsibility for temporary facilities and controls.
t. Construction waste management and recycling.
u. Parking availability.
v. Office, work, and storage areas.
w. Equipment deliveries and priorities.
x. First aid.
y. Security.
z. Progress cleaning.
3. Minutes: Contractor shall record and distribute meeting minutes.
C. Progress Meetings: Conduct progress meetings as directed by CPM .
1. Attendees: In addition to representatives of Owner , each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting.
Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
1.7 TERMS
A. "APPROVED" as used herein means "approved by the ODOT CPM.
B. 'FOR APPROVAL" means "for the CPM approval."
C. "SELECTED" means "selected by the CPM."
D. "PROVIDE" means "furnish and install."
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PROJECT MANAGEMENT AND
COORDINATION
013100 - 5
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
E. Where words "or approved" are used, Construction Project Manager is sole judge of quality and suitability of proposed alternate or substitution.
F. "CONSTRUCTION PROJECT MANAGER" (CPM) refers to the individual selected by ODOT to manage the project.
G. "Project Coordination" refers to the on-site individual (if) selected by ODOT to be the local liaison the contractor.
H. "INSTALL" means "furnish and install."
I. Items noted as "N.I.C." are "Not in Contract" and will be furnished and installed by Owner or others.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 013100
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUBMITTAL PROCEDURES 013300 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Submittal schedule requirements.
2. Administrative and procedural requirements for submittals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that requires responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."
B. Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."
1.3 SUBMITTAL SCHEDULE
A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates.
Include additional time required for making corrections or revisions to submittals noted by CPM and additional time for handling and reviewing submittals required by those corrections.
1.4 SUBMITTAL FORMATS
A. Submittal Information: Include the following information in each submittal:
1. Project name.
2. Date.
3. Name of Contractor.
4. Names of subcontractor, manufacturer, and supplier.
5. Unique submittal number, including revision identifier. Include Specification
Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.
6. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.
7. Drawing number and detail references, as appropriate.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUBMITTAL PROCEDURES 013300 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
8. Indication of full or partial submittal.
9. Signature of transmitter.
B. Options: Identify options requiring selection by CPM.
C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by CPM on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.
D. Submittals shall be electronic.
1.5 SUBMITTAL PROCEDURES
A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.
1. Email: Prepare submittals as PDF package, and transmit to CPM by sending via email. Include PDF transmittal form. Include information in email subject line as requested by CPM.
B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.
3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.
C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
1. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
2. Resubmittal Review: Allow 10 days for review of each resubmittal.
D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
F. Use for Construction: Retain complete copies of submittals on Project site. Use only
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUBMITTAL PROCEDURES 013300 - 3
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
final action submittals that are marked with approval notation from Architect's action stamp.
1.6 SUBMITTAL REQUIREMENTS
A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's catalog cuts.
b. Manufacturer's product specifications.
c. Standard color charts.
d. Statement of compliance with specified referenced standards.
e. Testing by recognized testing agency.
f. Application of testing agency labels and seals.
g. Notation of coordination requirements.
h. Availability and delivery time information.
4. For equipment, include the following in addition to the above, as applicable:
a. Wiring diagrams that show factory-installed wiring.
b. Printed performance curves.
c. Operational range diagrams.
d. Clearances required to other construction, if not indicated on accompanying Shop Drawings.
5. Submit Product Data before Shop Drawings, and before or concurrent with Samples.
B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Identification of products.
b. Schedules.
c. Compliance with specified standards.
d. Notation of coordination requirements.
e. Notation of dimensions established by field measurement.
f. Relationship and attachment to adjoining construction clearly indicated.
g. Seal and signature of professional engineer if specified.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SUBMITTAL PROCEDURES 013300 - 4
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
1.7 CONTRACTOR'S REVIEW
A. Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CPM.
B. Contractor's Approval: Indicate Contractor's approval for each submittal with contractors approval stamp . Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
1. CPM will not review submittals received from Contractor that do not have Contractor's review and approval.
1.8 ODOT REVIEW
A. Action Submittals: CPM will review each submittal, indicate corrections or revisions required.
1. PDF Submittals: CPM will indicate, via markup on each submittal, the appropriate action as follows:
a. Submittals will be returned marked Approved, Approved as Noted, Revise and Resubmit. Incomplete submittals will be marked Rejected and not reviewed.
B. Informational Submittals: CPM will review each submittal and will not return it, or will return it if it does not comply with requirements. CPM will forward each submittal to appropriate party.
C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from CPM.
D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.
E. Submittals received from sources other than Contractor will be returned without review.
F. Submittals not required by the Contract Documents will be returned by CPM without action.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 013300
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
TEMPORARY FACILITIES AND CONTROLS 015000 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 USE CHARGES
A. Water Service: Available from existing system without charge.
B. Electric Power Service: Available from existing system without charge.
1.2 TEMPORARY FACILITIES
A. Contractor may utilize construction area as a field office..
B. Contractor and employees may utilize the toilet and wash facilities within the building.
C. Provide one female and one male ADA compliant portable toilets for the use of DMV personnel and clients for the duration of the construction project. The portable toilets shall be cleaned and supplies replaced on a minimum of once weekly.
1.3 EQUIPMENT
A. Fire extinguishers located on site at all times..
1.4 TEMPORARY UTILITY INSTALLATION
A. Electric Power Service: Provide suitable construction grade extension cords as required to connect to existing facilities.
B. Lighting: Provide temporary lighting as required.
C. Locate Portable Toilets at the direction of the CPM.
1.5 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Provide security fencing around staging and materials storage area at contractor's option.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 015000
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PRODUCT REQUIREMENTS 016000 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 016000 - PRODUCT REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; and comparable products.
1.2 QUALITY ASSURANCE
A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 016000
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
EXECUTION 017300 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 017300 - EXECUTION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general administrative and procedural requirements governing execution of the Work, including, but not limited to, the following:
1. Construction layout.
2. Installation of the Work.
3. Cutting and patching.
4. Progress cleaning.
5. Protection of installed construction.
6. Correction of the Work.
1.2 DEFINITIONS
A. Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.
B. Patching: Fitting and repair work required to restore construction to original conditions after installation of subsequent work.
1.3 QUALITY ASSURANCE
A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.
1. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
2. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.
3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in CPM's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
EXECUTION 017300 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Comply with requirements specified in other Sections.
B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to CPM for the visual and functional performance of in-place materials. Use materials that are not considered hazardous.
C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb, and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure satisfactory results as judged by CPM. Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations, so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy of type expected for Project.
E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on-site and placement in permanent locations.
F. Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels.
G. Templates: Obtain and distribute to the parties involved templates for Work specified to
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
EXECUTION 017300 - 3
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
be factory prepared and field installed. Check Shop Drawings of other portions of the Work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.
END OF SECTION 017300
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
CONSTRUCTION WASTE MANAGEMENT
AND DISPOSAL
017419 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Disposing of nonhazardous demolition and construction and waste.
1.2 DEFINITIONS
A. Construction Waste: Building, structure, and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Disposal: Removal of demolition or construction waste and subsequent salvage, sale, recycling, or deposit in a landfill.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 017419
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
PROJECT RECORD DOCUMENTS 017839 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 017839 - PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for Project Record Documents, including the following:
1. As-built Drawings.
1.2 CLOSEOUT SUBMITTALS
A. As-built Drawings: Comply with the following:
1. Number of Copies: Submit one copy of Contractors As-built Drawings .
2. Submit copies of As-built Drawings as follows:
a. Initial Submittal:
1) Submit one paper-copy of updated As-built Drawings.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 017839
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SELECTIVE DEMOLITION 024119 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
1.2 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify CPM of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
3.2 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
SELECTIVE DEMOLITION 024119 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
3. Dispose of demolished items and materials promptly. Comply with requirements in Section 017419 "Construction Waste Management and Disposal."
4. Prior to disposal verify materials to be retained and stored with Construction Project Manager. Verify storage location with Construction Project Manager.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Store items in a safe location protected from construction and site activities.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
END OF SECTION 024119
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
ROUGH CARPENTRY 061000 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 061000 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wood products.
2. Dimension lumber framing.
1.2 DELIVERY, STORAGE, AND HANDLING
A. Stack wood products flat with spacers beneath and between each bundle to provide air circulation. Protect wood products from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS
A. Lumber: Comply with DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry wood products.
3. Dress lumber, S4S, unless otherwise indicated.
2.2 WOOD-PRESERVATIVE-TREATED LUMBER
A. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or that does not comply with requirements for untreated material.
B. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
ROUGH CARPENTRY 061000 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
2.3 DIMENSION LUMBER FRAMING
A. Non-Load-Bearing Interior Partitions by Grade:
1. Grade: Construction or No. 2.
2. Application: All interior partitions.
3. Species:
a. Hem-fir (north); NLGA.
2.4 PLYWOOD BACKING PANELS
A. Equipment Backing Panels: Plywood, DOC PS 1.
1. Grade: Exterior, A-C.
2.5 FASTENERS
A. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC70.
PART 3 - EXECUTION
3.1 INSTALLATION OF ROUGH CARPENTRY, GENERAL
A. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.
B. Plywood Backing Panels: Install backing panels by fastening to studs; coordinate locations with utilities requiring backing panels. Install fire-retardant-treated plywood backing panels with classification marking of testing agency exposed to view.
C. Sort and select lumber so that natural characteristics do not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.
D. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. Table 2304.10.1, "Fastening Schedule," in ICC's "International Building Code"
(IBC).
2. ICC-ES evaluation report for fastener.
E. Use steel common nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
ROUGH CARPENTRY 061000 - 3
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
splitting wood. Drive nails snug but do not countersink nail heads unless otherwise indicated.
3.2 INSTALLATION OF WALL AND PARTITION FRAMING
A. General: Provide single bottom plate and double top plates using members of 2-inch nominalthickness whose widths equal that of studs, except single top plate may be used for non-load-bearing partitions . Fasten plates to supporting construction unless otherwise indicated.
1. For interior partitions and walls, provide 2-by-4-inch nominal- size wood studs spaced 16 inches o.c. unless otherwise indicated.
B. Construct corners and intersections with three or more studs , except that two studs may be used for interior non-load-bearing partitions.
C. Frame openings with multiple studs and headers. Provide nailed header members of thickness equal to width of studs. Support headers on jamb studs.
END OF SECTION 061000
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
HOLLOW METAL FRAMES 081213 - 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 081213 - HOLLOW METAL FRAMES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Standard interior hollow metal frames.
B. Related Requirements:
1.2 ACTION SUBMITTALS
A. Product Data: For each type of specified product.
1. Include construction details, material descriptions, and finishes.
2. Include information indicating compliance with performance requirements indicated.
B. Shop Drawings:
1. Elevations of each frame type.
2. Frame details for each frame type, including dimensioned profiles and base-metal thicknesses.
3. Locations of reinforcement and preparations for hardware.
4. Details of each wall opening condition.
5. Details of frame anchors, joints, field splices, and connections.
C. Product Schedule: For hollow metal frames, prepared by or under the supervision of supplier, using same reference numbers for details and openings used on the Drawings and in schedules. Coordinate with doors and final door hardware schedule.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Deliver hollow metal frames palletized, packaged, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic, canvas, or other material that can entrap moisture.
B. Store hollow metal frames vertically under cover at Project site with head up. Place on minimum 4-inch- high wood blocking.
F4060901
COOS BAY DISTRICT 7
OFFICE REMODEL
Coos Bay, Oregon
HOLLOW METAL FRAMES 081213 - 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain hollow metal frames from single manufacturer.
2.2 ACCESSORIES
A. Frame Anchors: ANSI/SDI 250.4; steel sheet; minimum base-metal thickness required by door and frame standard indicated.
1. Interior Locations: ASTM A1008/A1008M or ASTM A1011/A1011M; hot-dip galvanized in accordance with ASTM A153/A153M, Class B.
2. Jamb Anchors: Of minimum size and type required by door and frame standard indicated, and suitable for performance level indicated.
a. Quantity: Minimum of three anchors per jamb, with one additional anchor for frames with no floor anchor. Provide one additional anchor for each 24 inches of frame height above 7 ft..
2.3 MATERIALS
A. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.
B. Cold-Rolled Steel Sheet: ASTM A1008/A1008M, Commercial Steel (CS), Type B;
suitable for exposed applications.
C. Inserts, Bolts, and Fasteners: Hot-dip galvanized in accordance with ASTM A153/A153M.
D. Glazing: Comply with requirements in Section 088000 "Glazing."
2.4 FABRICATION
A. Hollow Metal Frames:
1. Welded Frames: Fabricate in one piece except where handling and shipping limitations require multiple sections. Where frames are fabricated in sections, provide alignment plates or angles, at each joint, fabricated from metal of same or greater thickness as frames.
2. Refer to Section 099124 for finish coating.
3. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers.