SF 1442 CONTINUATION SHEET
EQ10PCB-1-18-0042
ITEM
NUMBER
DESCRIPTION QUANITY UNIT
OF
ISSUE
UNIT PRICE AMOUNT
CLIN 0001 Design – BLM Space Renovations
Contractor shall provide all supplies, material, equipment and labor required for design in accordance with attached Scope of Work and documents referenced in the Scope of Work (SOW).
1 LS $ $
CLIN 0002 Construction – BLM Space Renovations ~ Construction including new walls, doors, and sound attenuation
Contractor shall provide all supplies, material, equipment and labor required for design in accordance with attached Scope of
CLIN 0003 Construction – BLM Space Renovations ~ Physical Access
Control System (PACS) including card readers, controllers, and
PC
Contractor shall provide all supplies, material, equipment and
CLIN 0004 Construction – BLM Space Renovations ~ Clerestory Relites for
Cadastral
Contractor shall provide all supplies, material, equipment and
OVERALL TOTAL (add CLINs) $
**NOTE 1: Vendor must Submit pricing for all Contract Line Item Numbers (CLINs) and in Construction Specification Institute (CSI) Format to include copies of any sub-contractor quotes/proposals.**
**NOTE 2: Per Washington Administrative Code: WAC 458-20-190, the Federal Government is exempt from paying sales tax.
See link for details: http://apps.leg.wa.gov/wac/default.aspx?cite=458-20-190
Individual(s) Authorized to Bind the Company:
The following individual(s) are authorized to Negotiate/Bind our Company/Partnership/Corporation on a Contract and to execute any resulting Contract Modification (signature authority is located on the 1442):
Name of person completing this form (authorized to negotiate with GSA)
Title/Position
Phone Number
DUNS Number
Tax ID Number
NOTE: If after contract award there are required changes to this list, the Contractor may change them by issuance of a letter to the Contracting Officer on company letterhead. The letter may be sent via email and will be retained in the contract file. It is not necessary that the contract be modified each time the list is revised.
(End of Continuation Sheet) http://apps.leg.wa.gov/wac/default.aspx?cite=458-20-190