14.0_GSA_Dust_Control_Procedures.pdf
PDF 165 KB Posted
- Solicitation number
- EQ10PCB-1-18-0042
About this file
GSA Dust Control
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANCHORAGE FEDERAL BUILDING DUST CONTROL SPECIFICATION
Indoor Air Quality Control Requirements
Part 1 – General
1.1 SECTION INCLUDES
A. 1.03 Dust Control
1.2 DESCRIPTION OF REQUIREMENTS
A. Specific minimum administrative and procedural actions are specified in this section. These requirements have been included for specific purposes as indicated.
B. A written plan outlining the contractor’s methods of meeting the Dust Control specification must be submitted to GSA for approval. The plan shall include, but not be limited to, construction barrier locations, exit path routing, temporary signage design and locations, proposed materials, negative air routing, and proposed cleaning equipment.
1.3 DUST CONTROL
A. BARRIERS
1. The contractor shall provide appropriate barriers to isolate the construction area from occupied areas. Barriers must enclose entire work area to completely isolate it from all surrounding areas. The barriers shall be constructed:
a. To be tightly sealed from wall to wall and floor to structure above. This includes areas above suspended ceilings, unless ceilings are not to be disturbed, in which case, seal will occur at ceiling level.
b. Out of the following materials:
1. For projects with little anticipated noise and no hot work, 6-mil fire-retardant (Rexam StarTex or approved equal) visqueen with zipper openings. Use appropriate mini-enclosure for all ceiling work outside of contained workspace.
2. Elevator openings, if not for a dedicated construction elevator, must be sealed air tight to the work area.
3. All work area entrances must have tacky mats present at all times. Mats must be clean, intact and maintained on a constant basis.
4. Adjacent floor areas directly outside the work area must be vacuumed or wet mopped at appropriate intervals to eliminate tracking and dust migration.
Contractor to provide vacuum cleaners and all cleaning equipment.
5. Prior to removal of any barriers, all debris must be removed, the work area wet mopped, vacuumed, and all surfaces wiped down.
6. All vacuums used for final cleaning of the work area must be equipped with HEPA filtration.
C. AIR DISTRIBUTION
1. The contractor shall provide all necessary equipment, including appropriate negative air machines and temporary ductwork to maintain a negative air pressure relationship, for all areas under construction or contained within the
ANCHORAGE FEDERAL BUILDING DUST CONTROL SPECIFICATION
construction barriers, to surrounding areas. Unless exempted by the GSA Project Manager and Contracting Officer in writing negative pressurization of the workspace is required at all times. Or control dust at the source when the area is not occupied.
a. Work area ventilation must be 100% exhausted to the exterior of the building unless provided written permission by owner to tie into building ventilation exhaust.
b. All negative air machines must have filtration in place. Pre-filters must be maintained to prevent airflow restriction and dust accumulation.
c. Discharge hoses, vented to an approved location, must be in place and intact at all times.
d. Penetrations or openings to barrier enclosing the negative pressure area must be tightly sealed at the end of each day.
2. Supply and exhaust air grills serving the building HVAC systems must be covered and sealed to prevent airflow at all times.
1.4 MATERIALS AND MATERIAL HANDLING
A. Selection of Materials
1. Prior to start of construction, contractor must submit Material Safety Data
Sheets on all paints, glues, mastics, epoxies, adhesives, cleaning products, etc. prior to start of construction for review by the GSA Project Manager.
2. All dirty materials including new materials, debris, and tools must be covered or wrapped when transported through the building.
3. Debris removal must occur in an exterior chute or through approved routes and only at specified times. After each period of debris removal, the traffic and material corridor shall be cleaned and wet mopped from entrance to work area to disposal area as necessary. Conveyances used for debris removal must be clean and covered.
4. At the end of each workday, work area must have all debris removed and floors cleaned.
5. Any material capable of absorbing moisture must be fully dried within 48 hours of becoming wet. If material, either new or existing, inside or out of the work area, becomes wet as a result of the contractors actions and is unable to be dried to an “as-new” condition within 48 hours, the contractor shall remove the material within the same 48 hour period. Materials removed from the work area for this reason must be replaced with new material at contractor expense.
PART 2 – PRODUCTS
(Not Applicable)
PART 3 – EXECUTION
(Not Applicable)
END OF SECTION
ANCHORAGE FEDERAL BUILDING DUST CONTROL CONSTRUCTION
MONITORING CHECKLIST
Inspector: Date: ______Time: ______ Areas Inspected:
I. Requirements Met?
Y or N
Action Taken Comments
Isolation of the Construction area Appropriate barrier in place for project.
Visqueen Plasterboard and framed door Smoke tight
All barriers must be built of materials that will not contribute to the development or spread of fire
Barriers are appropriate for work being done.
Wall to wall Floor to ceiling tile Floor to floor slab above Barriers are sealed:
No tears or penetrations All joints to patient care areas sealed Elevator shaft visqueen sealed Small Construction Zone: visqueen barrier present and sealed floor to ceiling Door frames gasketed:
Doors are self-closing Gaskets are intact Adjacent ceiling areas and tiles intact Tacky mat:
Present at work site entrance Clean and intact Adjacent floor area clean, no tracking Vacuumed and wet mopped as needed Other isolation issues:
II. Removal of Air from Work Area Construction Area: negative pressure with respect to occupied areas. 100% exhaust air. Log manometer reading >.02” Filtered negative air machine:
In place and on Filter(s) clean Discharge hose(s) intact Building supply and exhaust air grills covered with visqueen or thick plastic.
Inspector: Date: ______Time: ______ Areas Inspected:
I. Requirements Met?
Y or N
Action Taken Comments
Other air issues:
III. Material/Tool Management MSDS’ available for all materials present at work site.
Debris removed through chute or at specified times to keep flammable/ combustible load to a minimum.
Debris carriers clean and covered during transport through hospital.
Small items (tools) transported through hospital covered or wrapped End of Day: project floors clean and debris removed.
Prior to removal of construction barriers, all debris is removed, work site is wet mopped, vacuumed and all surfaces wiped down.
All wet materials (carpet, ceiling tile, insulation, sheetrock etc.) are dried within 48 hours or removed from site.
Additional Hazard Surveillance rounds completed Other Material Issues:
IV. Traffic, Egress, Fire Protection Exits and egress paths are:
Clear and unobstructed Marked appropriately with signage Temporary egress routes: staff must be instructed of any temporary egress route changes.
Temporary evacuation routes are posted Appropriate signage is in place Training has been accomplished Training has been documented
Inspector: Date: ______Time: ______ Areas Inspected:
I. Requirements Met?
Y or N
Action Taken Comments
Fire Alarm, Suppression and Detection systems are:
In place and operational Inspected and tested If out of service, temporary and equivalent systems are in place and:
Tested and inspected Fire watch is implemented Permits are issued for sprinkler valve closures
Additional fire-fighting equipment is available and personnel are trained in its use.
Hot work permits are issued for torch use and:
Fire watch implemented No smoking policy is communicated and enforced.
As necessary, additional fire drills (at least 2/quarter/shift) are implemented.
Access to emergency services is free and unobstructed.
V. Occupied Area (When construction is in occupied area) Appropriate Barriers and Protection:
Sealed, intact, and floor to ceiling Sticky mats in place and functioning Adjacent areas clean and wet mopped Daily check of patient rooms and adjacent areas for wet/soiled ceiling tiles, carpet, drywall etc.
Other Occupied area issues:
File details come from the government source that posted it.