CN-370000-HW561-DC03L.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW561|9da97b3024ac9529ec6b9d50686cc80a
Contract number
HW561
Issued by
Florida

About this file

This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW561 with contractor Golder Associates Inc. for groundwater monitoring services at the former Coin Laundry Equipment of Jacksonville site located at 1692 Hammond Boulevard in Jacksonville, Duval County, Florida. The task assignment is identified as DC003L and is managed by FDEP Contract Manager Ben Grubbs with contractor representative Matt Crews and Donald Miller from Golder Associates Inc.

The task assignment authorizes Golder to conduct biennial groundwater monitoring activities in accordance with the February 11, 2021 Scope of Work and Cost Estimate. The scope comprises four subtasks: (1) Project Management; (2) Annual Groundwater Sampling and Investigation-Derived Waste (IDW) Treatment involving collection of samples from nine monitoring wells and analysis for chlorinated volatile organic compounds using EPA Method 8260B; (3) COVID-19 related costs for vehicle rental to maintain social distancing; and (4) Reporting including preparation of a Biennial Groundwater Monitoring Report and updates to FDEP GIS tables and Automated Data Processing Tool (ADaPT) deliverables. The total task assignment value is $7,236.35 on a fixed price basis with no retainage. Invoicing is structured in three phases: Subtask 2 for $3,984.70 due upon submittal and FDEP approval by April 23, 2021; Subtask 3 for $97.00 due upon submittal and FDEP approval by April 23, 2021; and Subtasks 1 and 4 combined for $3,154.65 due upon submittal and FDEP approval by May 21, 2021. The period of performance extends through July 30, 2021.

View the file

Other files

File Type Posted
CN-370000-HW561-A2.pdf PDF
CN-370000-HW561-A4.pdf PDF
CN-370000-HW561-A5.pdf PDF
CN-370000-HW561-A9.pdf PDF
CN-370000-HW561-CO4.pdf PDF
CN-370000-HW561-DC003G.pdf PDF
CN-370000-HW561-DC014G.pdf PDF
CN-370000-HW561-DC014M.pdf PDF
CN-370000-HW561-DC015i.pdf PDF
CN-370000-HW561-DC016I.pdf PDF
CN-370000-HW561-DC018I.pdf PDF
CN-370000-HW561-DC019M.pdf PDF
CN-370000-HW561-DC019S.pdf PDF
CN-370000-HW561-DC01D.pdf PDF
CN-370000-HW561-DC01G.pdf PDF
CN-370000-HW561-DC01GCO4.pdf PDF
CN-370000-HW561-DC020E.pdf PDF
CN-370000-HW561-DC021A.pdf PDF
CN-370000-HW561-DC021F.pdf PDF
CN-370000-HW561-DC023CO2.pdf PDF
CN-370000-HW561-DC025i.pdf PDF
CN-370000-HW561-DC026C.pdf PDF
CN-370000-HW561-DC028A.pdf PDF
CN-370000-HW561-DC028C.pdf PDF
CN-370000-HW561-DC028F.pdf PDF
CN-370000-HW561-DC029A.pdf PDF
CN-370000-HW561-DC02D.pdf PDF
CN-370000-HW561-DC02ECO1.pdf PDF
CN-370000-HW561-DC033B.pdf PDF
CN-370000-HW561-DC03C.pdf PDF
CN-370000-HW561-DC03D.pdf PDF
CN-370000-HW561-DC03E.pdf PDF
CN-370000-HW561-DC03FCO1.pdf PDF
CN-370000-HW561-DC03HCO1.pdf PDF
CN-370000-HW561-DC03HCO2.pdf PDF
CN-370000-HW561-DC03JCO1.pdf PDF
CN-370000-HW561-DC03KCO1.pdf PDF
CN-370000-HW561-DC04C.pdf PDF
CN-370000-HW561-DC04L.pdf PDF
CN-370000-HW561-DC04M.pdf PDF
CN-370000-HW561-DC04o.pdf PDF
CN-370000-HW561-DC05CCO2.pdf PDF
CN-370000-HW561-DC05I.pdf PDF
CN-370000-HW561-DC05JCO2.pdf PDF
CN-370000-HW561-DC06CCO1.pdf PDF
CN-370000-HW561-DC080CO2.pdf PDF
CN-370000-HW561-DC08B.pdf PDF
CN-370000-HW561-DC08LCO2.pdf PDF
CN-370000-HW561-DC08N.pdf PDF
CN-370000-HW561-DC08NCO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW561

D000 N/ADC003L

Golder Associates

Matt Crews

(850) 245-8992Ben Grubbs

ERIC_4627

Coin Laundry Equipment of Jacksonville

1692 Hammond Blvd, Jacksonville, Duval

Monitoring

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the February 11, 2021, Scope of Work and Cost Estimate.

Biennial Groundwater Monitoring Report and ADaPT/GIS update

05/21/2021

07/30/2021

$ 7,236.35 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.02.18 09:00:32 -05'00'

Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.02.18 09:00:44 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.02.18 10:00:06 -05'00'

Donald Miller Digitally signed by Donald Miller Date: 2021.02.18 10:54:03 -05'00'

$ 7,236.35

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater monitoring lab report and field and IDW treatment documentation 04/23/2021

Subtask 3: Field documentation of COVID-19 safety precautions via E-mail Deliverable 04/23/2021

Subtask 4: Biennial Groundwater Monitoring Report and ADaPT/GIS update 05/21/2021

Subtask 2: Submittal and FDEP approval of groundwater monitoring lab report and field and IDW treatment documentation $ 3,984.70

Subtask 3: Submittal and FDEP approval of field documentation of COVID-19 safety precautions via E-mail Deliverable $ 97.00

Subtasks 1 & 4: Submittal and FDEP approval of Biennial Groundwater Monitoring Report and ADaPT/GIS update $ 3,154.65

$ 7,236.35

HW561

DC003L

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

To: HW561 Contract Negotiation File Coin Laundry Equipment of Jacksonville Jacksonville, Duval County

ERIC_ 4627

From: Ben Grubbs, Project Manager Date: February 18, 2021 Subject: Negotiation Summary

HW561 DC003L

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the February 11, 2021, Scope of Work and Cost Estimate.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Biennial Groundwater Monitoring and IDW Treatment Golder will collect groundwater samples from monitoring wells MW001I, MW001D, MW006I, MW007I, and MW012I – MW016I. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum before being treated with Golder’s aqueous IDW treatment system and disposed of on site.

Subtask 3: COVID-19 Costs Costs related to the use of extra vehicles so that Golder can maintain social distancing during the COVID-19 pandemic are covered under this subtask for invoicing purposes.

Subtask 4: Reporting Golder will submit the Biennial Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.

The original Task Assignment totaled $7,286.10 with 53 labor hours but after negotiations and corrections with contractor costs are reflected as below:

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $7,236.35 with 53 labor hours.

MEMORANDUM

Coin Laundry Equipment of Jacksonville February 18, 2021 Page Two

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Golder Associates Inc.

Date: 2/11/2021

Task #: DC003L SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual GW Sampling and IDW Treatment SubTask 7

Activity/Phase: SubTask 3 Covid-19 Costs SubTask 8

Project Manager: Benjamin Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.96 Project Manager (RFM) 5 4.7 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - LV6 0 0 0 0 0 0 0 0 0 0

$59.43 Senior Sci/Eng.- LV6 (JCB) 2 0 0 2 0 0 0 0 0 0 $42.96 Sr. Project Sci/Eng - LV4 (RFM) 15 3 0 12 0 0 0 0 0 0 $26.32 Project Sci/Eng - LV3 (KF) 13 13 0 0 0 0 0 0 0 0 $41.54 Project Sci/Eng - LV3 (JT) 2 0 0.0 1.5 0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 3 0 0 3 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (JS) 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Sci/Eng - LV1 0 0 0 0 0 0 0 0 0 0 $0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0

$29.98 Senior Technician - LT3 0 0 0 0 0 0 0 0 0 0 $25.10 Staff Technician - LT2 12 12 0 0 0 0 0 0 0 0

$0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0

$24.10 Staff Admin - LA2 (AS) 1 0 0 1 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 53 5 28 0.0 20 0 0 0 0 0 0

Direct Labor $1,807.40 $200.82 $772.24 $0.00 $834.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $3,117.76 $346.41 $1,332.11 $0.00 $1,439.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,925.16 $547.23 $2,104.35 $0.00 $2,273.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $90.37 $10.04 $38.61 $0.00 $41.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Annual Monitoring

Coin Laundry Laundry Equipment of Jacksonville

REV: 02/03 CEF GOLDER Page 1

Task #: DC003L SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual GW Sampling and IDW Treatment SubTask 7

Activity/Phase: SubTask 3 Covid-19 Costs SubTask 8

Project Manager: Benjamin Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Annual Monitoring

Coin Laundry Laundry Equipment of Jacksonville

Travel Vehicle Rental $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $660.00 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $764.00 $764.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $565.10 $565.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $172.70 $172.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $770.30 $770.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,743.83 $557.27 $3,774.26 $97.00 $2,315.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $492.52 $54.72 $210.44 $0.00 $227.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,236.35 $611.99 $3,984.70 $97.00 $2,542.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Coin Laundry Laundry Equipment of Jacksonville SUBTASK 2: Annual GW Sampling and IDW Treatment

DATE: 2/11/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Project Sci/Eng (R Mongillo) 3

Project Sci/Eng (K. Fraley) 13

Staff Sci/Eng (D. Burton) 12

TOTAL LABOR 28

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Miscellaneous Expendables $32.50 Per Day 1 $32.50 Shallow Groundwater Sampling Kit $208.55 Per Day 2 $417.10 Tubing, poly/HDPE $0.25 Per Foot 520 $130.00 Tubing, silicon 3/16 x 3/8 $2.00 Per Foot 9 $18.00 Drum, 55-gallon $58.20 Each 1 $58.20 Portable Compressor $48.50 Per Day 1 $48.50 Generator, 5 kW $66.00 Per Day 1 $66.00

TOTAL EQUIPMENT $770.30

VEHICLE TYPE RATE UNIT USAGE

Truck $97.00 Per Day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOC halocarbons (9 MWs, 1 TB) EPA Method 8260B $66.00 9 1 $660.00 Sample Shipping Large $104.00 1 $104.00

TOTAL LAB $764.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USAGE

TOTAL $0.00

Groundwater sampling for biennial monitoring. Mobilize and collect samples from portion of 9 wells. Round trip travel (1 hour), water levels, instrument calibration, and sampling (10 hours), IDW treatment (1 hour).

Groundwater sampling for biennial monitoring. Mobilize and collect samples from portion of 9 wells. Field event preparation (1 hour), round trip travel (1 hour), water levels, instrument calibration, and sampling (10 hours), IDW treatment (1 hour).

Arrange site access and check property ownership with RPO and adjacent offsite property owners.

Groundwater sampling scope: sample 9 wells: (Intermediate zone wells MW001I, MW006I, MW007I, MW012I, MW013I, MW014I, MW015I, MW016I, and deep zone well MW001D) with field parameters and water levels. Depth to water measurements will be collected from the 8 intermediate zone wells that will be sampled and additional intermediate zone wells MW002I, MW008I, and MW009I. IDW will be treated with Golder's aqueous treatment system and discharged on a paved surface. Groundwater will be analyzed for chlorinated VOCs by EPA Method 8260.

FINAL --7/24/96

SUBTASK 3: Covid-19 Costs

DATE: 2/11/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL EQUIPMENT 0.0

VEHICLE TYPE RATE UNIT USAGE

Truck (Covid-19 Cost) $97.00 Per Day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 4: Reporting

DATE: 2/11/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (J. Brown) 2

Senior Project Sci/Eng (R. Mongillo) 12

Project Sci/Eng (J. Thomas) 1.5

Project Sci/Eng (B. Lucero) CADD figures 3

Staff Admin (A. Shportun) 1

TOTAL EQUIPMENT 19.5

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

Report formatting, document production, binding, and shipping. Create pdf for OCULUS.

Beinnual monitoring report senior review, conclusions and recommendations.

Reporting, data entry, report tables, prepare figures, author annual monitoring report

Update FDEP GIS tables, run data checker, create and edit error report, review and annotate error report (9 data points x 8 min/point = 72 minutes), and submit FDEP GIS tables; submit ADaPT deliverables.

FINAL --7/24/96

Task #: DC003L SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual GW Sampling and IDW Treatment SubTask 7

Activity/Phase: SubTask 3 Covid-19 Costs SubTask 8

Project Manager: Benjamin Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.96 Project Manager (RFM) 5 4.7 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - LV6 0 0 0 0 0 0 0 0 0 0

$59.43 Senior Sci/Eng.- LV6 (JCB) 2 0 0 2 0 0 0 0 0 0 $42.96 Sr. Project Sci/Eng - LV4 (RFM) 15 3 0 12 0 0 0 0 0 0 $26.32 Project Sci/Eng - LV3 (KF) 13 13 0 0 0 0 0 0 0 0 $41.54 Project Sci/Eng - LV3 (JT) 2 0 0.0 1.5 0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 3 0 0 3 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (JS) 12 12 0 0 0 0 0 0 0 0

$0.00 Staff Sci/Eng - LV1 0 0 0 0 0 0 0 0 0 0 $0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0

$29.98 Senior Technician - LT3 0 0 0 0 0 0 0 0 0 0 $25.10 Staff Technician - LT2 0 0 0 0 0 0 0 0 0 0

$0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0

$24.10 Staff Admin - LA2 (AS) 1 0 0 1 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 53 5 28 0.0 20 0 0 0 0 0 0

Direct Labor $1,823.87 $202.65 $786.88 $0.00 $834.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $3,146.18 $349.57 $1,357.37 $0.00 $1,439.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,970.05 $552.22 $2,144.25 $0.00 $2,273.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $91.19 $10.13 $39.34 $0.00 $41.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Annual Monitoring

Coin Laundry Laundry Equipment of Jacksonville

REV: 02/03 CEF GOLDER Page 1

Task #: DC003L SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual GW Sampling and IDW Treatment SubTask 7

Activity/Phase: SubTask 3 Covid-19 Costs SubTask 8

Project Manager: Benjamin Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Annual Monitoring

Coin Laundry Laundry Equipment of Jacksonville

Travel Vehicle Rental $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $660.00 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $764.00 $764.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $564.65 $564.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $172.70 $172.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $769.85 $769.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,789.09 $562.35 $3,814.44 $97.00 $2,315.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $497.01 $55.22 $214.43 $0.00 $227.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,286.10 $617.57 $4,028.87 $97.00 $2,542.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

Golder Associates Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256

T: +1 904 363-3430 +1 904 363-3445

Golder and the G logo are trademarks of Golder Associates Corporation golder.com

February 11, 2021 CX21455085

Mr. Benjamin Grubbs Florida Department of Environmental Protection 2600 Blair Stone Road, MS4520 Tallahassee, FL 32399-2400

PROPOSAL FOR 2021 BIENNIAL GROUNDWATER MONITORING

FORMER COIN LAUNDRY EQUIPMENT OF JACKSONVILLE

1692 HAMMOND BOULEVARD

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY IDENTIFICATION NUMBER: ERIC_4627

PROPOSE TASK ASSIGNMENT: DC003L

Dear Mr. Grubbs, Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (FDEP) with this cost proposal for annual groundwater monitoring at the former Coin Laundry Equipment of Jacksonville (Coin Laundry) site, located in Jacksonville, Duval County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. This scope of work is subdivided into three separate subtasks, as described below.

SUBTASK 1: PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, the project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation such that the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP Drycleaning Solvent Cleanup Program requirements. The project manager will be responsible for the work being conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.

SUBTASK 2: ANNUAL GROUNDWATER SAMPLING AND IDW TREATMENT

Golder will collect groundwater samples from nine monitoring wells (MW001I, MW001D, MW006I, MW007I, MW012I, MW013I, MW014I, MW015I, and MW016I). Figures 2, 3, and 4 from the 2019 annual monitoring report, which show the potentiometric contours for the intermediate zone of the surficial aquifer and the volatile organic compound (VOC) results for the intermediate, and deep zones of the surficial aquifer, are attached.

Prior to groundwater sampling, depth-to-water measurements will be collected at the nine previously mentioned monitoring wells and existing monitoring wells MW002I, MW008I, and MW009I using an electronic water level

Mr. Benjamin Grubbs CX21455085

Florida Department of Environmental Protection February 11, 2021 indicator to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.

Groundwater samples will be collected from the wells in accordance with FDEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B. For quality assurance purposes, one trip blank will accompany each sample cooler for laboratory analysis of chlorinated VOCs using EPA Method 8260B. Upon receipt of the laboratory analytical results, Golder will evaluate the constituent concentrations to determine if off-site notification is required.

Golder will temporarily store purge water and development water generated from the monitoring well installation and groundwater sampling event in 55-gallon steel drums and treat the IDW on site using Golder’s IDW treatment system. Based on the historical IDW characterization data, the treated aqueous IDW will be assumed to be below the regulatory standards. Golder will spread the treated aqueous IDW on an impervious surface in locations sufficiently distant from any storm water drains to prevent runoff into the drains. The remaining 55-gallon drum(s) will be removed from the site following treatment.

SUBTASK 3: COVID-19 COSTS

Providing a second truck for use by a two-person field crew during a one-day field effort associated with Subtask 2 to provide protection from Covid-19.

SUBTASK 4: REPORTING

The biennial groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will also update the FDEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the FDEP data checker on the completed tables; and submit the updated tables and error reports under this subtask. Additionally, Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.

HEALTH AND SAFETY

Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

Mr. Benjamin Grubbs CX21455085

Florida Department of Environmental Protection February 11, 2021

COST AND SCHEDULE

The estimated cost to complete the proposed work is $7,286.10. Golder will tentatively schedule the sampling event to be conducted in March 2021. The groundwater sampling event is estimated to require one day on site with two field personnel. The LOE/CEF cost sheets are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule:

Table 1: Proposed Costs and Deliverable Schedule

Task Proposed Cost Proposed Schedule

Subtask 1: Project Management $617.57 June 26, 2021

Subtask 2: Annual Groundwater Sampling and IDW Treatment $4,028.87 April 23, 2021 (Field Documentation and Laboratory Report)

Subtask 3: Covid-19 Costs $97.00 April 23, 2021

Subtask 4: Reporting $2,542.66 May 21, 2021 (annual Monitoring report, GIS Tables, ADaPT Deliverables)

Total/Completion Date $7,286.10 July 31, 2021

Golder appreciates the opportunity to provide services under the Dry Cleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at 904 363-3430.

Sincerely, Golder Associates Inc.

Ralph F. Mongillo, Jr. PG Donald J. Miller, Peng Senior Project Geologist Senior Consultant and Principal

RFM/DJM/as

Attachments:

Figure 2 Potentiometric Map of the Intermediate Surficial Aquifer (3/12/2019) Figure 3 VOH Contaminants Detected in the Intermediate Surficial Aquifer Figure 4 VOH Contaminants Detected in the Lower Surficial Aquifer Attachment A LOE/CEF Cost Sheets

G:\Projects\DEP-Drycleaning\Projects\Jax\Coin Laundry\FDEPDC003-Coin Laundry\003L\Proposal\DC003L Coin Laundry 2021 Biennial Mon Proposal.docx

Revised Costs

• Subtask 1: $611.99

• Subtask 2: $3,984.70

• Total: $7,236.35

-BG

Grubbs_B Cross-Out

Grubbs_B Cross-Out

Grubbs_B Cross-Out

(68.05)

(68.20)

(68.33)

(NM)

(68.48)

(68.51)

(68.77)

(68.87)

(NM)

(NM)

(68.52)

BURIED GAS LINE

PROPERTY BOUNDARY

OVER HEAD ELECTRICAL LINES

INTERMEDIATE SURFICIAL AQUIFER

MONITORING WELL LOCATION

(SCREEN INTERVAL 20-25 FT BGS)

BURIED SEWER AND WATER LINES

UPPER SURFICIAL GROUNDWATER

ELEVATION (FT - NGVD)

GROUNDWATER CONTOUR INTERVAL

ESTIMATED GROUNDWATER FLOW DIRECTION

(DASHED WHERE INFERRED)

1. UST = UNDERGROUND STORAGE TANK

2. NM = NOT MEASURED

3. LIL CHAMP MONITORING WELLS WERE ABANDONED PRIOR TO

AUGUST 2005.

4. MW009I WAS DESTROYED WHEN USTs/DISPENSERS WERE

REMOVED FROM THE PROPERTY SOMETIME BETWEEN APRIL

2009 AND APRIL 2010.

5. GROUNDWATER MEASUREMENT FROM MW013I IS ANOMALOUS;

THEREFORE, WAS NOT USED ON THE POTENTIOMETRIC MAP.

i n

FDEP-DC003

Control No.

FDEP-DC003-G002

FIGURE

2019-03-26

BCL

RFM

RFM

JCB

COIN LAUNDRY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMETAL PROTECTION

POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE OF THE

SURFICIAL AQUIFER

(SCREENED INTERVAL 20-25 FEET BGS) - MARCH 12, 2019

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

I F

T

H

S

M

E A

S U

R E

M E

N

D

O E

S

N

A T

C

W

A

T

O

W N

T

E

Z

E

H

B

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h j a c k s o n v i l l e d r a f t i n g F i l e F

D E

P F

D E

P D

C d c n o c o i n l a u n d r y f n a m r p t a c t i v e d r a w i n g s i l e

N a m e

F

D E

P D

C G d w g

SCALE

0 20 40

FEET

LEGEND

NOTE(S)

(68.52)

AutoCAD SHX Text

DUMPSTERS

AutoCAD SHX Text

OVERHEAD ELECTRICAL LINES

AutoCAD SHX Text

UNDERGROUND ELECTRICAL LINES

AutoCAD SHX Text

SINK

AutoCAD SHX Text

WASHERS

AutoCAD SHX Text

WASHERS

AutoCAD SHX Text

LOCATION OF FORMER DRYCLEANING UNIT

AutoCAD SHX Text

SURFACE WATER DRAINAGE CULVERT

AutoCAD SHX Text

DOUBLE DOORS

AutoCAD SHX Text

NORMANDY BOULEVARD

AutoCAD SHX Text

HAMMOND BOULEVARD

AutoCAD SHX Text

UST

AutoCAD SHX Text

AREA

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

LIL CHAMP FOOD STORE

AutoCAD SHX Text

DRYERS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

HOT WATER HEATER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

GAS

AutoCAD SHX Text

SHRUBS

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FILL FLOOR DRAIN

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

WATER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FORMER LOCATION OF REMEDIAL SYSTEM EQUIPMENT

AutoCAD SHX Text

MW009II

AutoCAD SHX Text

MW002II

AutoCAD SHX Text

MW006II

AutoCAD SHX Text

MW013II

AutoCAD SHX Text

MW012II

AutoCAD SHX Text

MW014II

AutoCAD SHX Text

MW007II

AutoCAD SHX Text

MW001II

AutoCAD SHX Text

MW015II

AutoCAD SHX Text

MW008II

AutoCAD SHX Text

MW016II

AutoCAD SHX Text

SUMP

AutoCAD SHX Text

MW004S

C

D i n

FDEP-DC003

Control No.

FDEP-DC003-G003

RFM

RFM

JCB

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

A

S U

R E

M E

E

S

N

T

A

T

O

W N

T

E

Z

E

H

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h j a c k s o n v i l l e d r a f t i n g F i l e F

D E

P F

D E

P D

C d c n o c o i n l a u n d r y f n t a c t i v e d r a w i n g l e

N a m e

F

D E

P D

C G d w g

OVER HEAD ELECTRICAL LINES

PROPERTY BOUNDARY

ASPHALT CUTS

BURIED GAS LINE

BURIED SEWER AND WATER LINE

GROUNDWATER SAMPLE LOCATION

INTERMEDIATE SURFICIAL AQUIFER DPT

MONITORING WELL LOCATION

INTERMEDIATE SURFICIAL AQUIFER

PCE 3.0 ug/L ISOCONCENTRATION

CONTOUR

(SCREENED INTERVAL 20-25 FT. BGS)

A

B

ROSA JENKINS PROPERTY

M&T TRUST

8832 BRIER WAY SOUTH

8831 NORMANDY BLVD

C

FLORIDA DEPARTMENT OF

TRANSPORTATION PROPERTY

D

JUSTIN MICHAEL SHAW PROPERTY

8840 BRIER WAY SOUTH

MW014I

DATE PCE TCE

3/24/2011 2.8 0.36 U

3/22/2012

5.9

0.36 U

3/19/2013 1.7 0.66 U

3/13/2014

3.5

0.36 U

10/29/2015

5.2

0.58 U

10/26/2016

0.89 I

10/18/2017

1.2

3/12/2019

1.3 I

MW007I

DATE PCE TCE

3/24/2011

2.2

3/22/2012

1.1

3/19/2013

0.66 U

3/13/2014

0.54 I

10/29/2015

0.85 I

10/26/2016

1.8

10/18/2017

2.1

3/12/2019

1.3 I

DP014

DATE PCE TCE

9/2/2004 2.0 <1.0

8/29/2005 1.17 1.0 U

DP018

DATE PCE TCE

9/2/2004 2.0 U 2.0 U

DP015

DATE PCE TCE

9/1/2004

56.3

1.0

MW006I

DATE PCE TCE

6/5/2006 1.0 U 1.0 U

3/10/2008 1.61 0.324 U

3/20/2013

1.1

3/13/2014

0.73 I

5/17/2018

0.29 U

3/12/2019

0.29 U

DP019

DATE PCE TCE

9/2/2004 <1.0 <1.0

DP004

DATE PCE TCE

8/24/2004

59.8

2.9

DP016

DATE PCE TCE

9/1/2004 <1.0 <1.0

DP010

DATE PCE TCE

8/24/2004 <1.0 <1.0

DP020

DATE PCE TCE

9/2/2004 <1.0 <1.0

DP017

DATE PCE TCE

9/1/2004 <1.0 <1.0

DP012

DATE PCE TCE

9/1/2004 <1.0 <1.0

DP001

DATE PCE TCE

8/23/2004 <1.0 <1.0

DP011

DATE PCE TCE

8/24/2004 <1.0 <1.0

MW002I

DATE PCE TCE

9/28/2004 2.0 U 2.0 U

8/29/2005 1.0 U 1.0 U

6/5/2006 1.0 U 1.0 U

3/10/2008 0.187 U 0.324 U

DP002

DATE PCE TCE

8/24/2004

16.5

<1.0

DP021

DATE PCE TCE

9/3/2004 <1.0 <1.0

DP009

DATE PCE TCE

8/25/2004 <1.0 <1.0

DP005

DATE PCE TCE

8/25/2004 <1.0 <1.0

MW001I

DATE PCE TCE

3/24/2011

0.76 I

3/22/2012

0.69 I

3/19/2013

0.86 I

3/13/2014

2.7

10/29/2015

3.4*

10/26/2016

25 6.2

10/18/2017

36 8.6

3/12/2019

18 12

MW009I

DATE PCE TCE

9/28/2004 2.0 U 2.0 U

8/30/2005 1.42 1.0 U

6/5/2006 1.0 U 1.0 U

3/11/2008 0.187 U 0.324 U

MW012I

DATE PCE TCE

3/24/2011

6.1

0.36 U

3/22/2012

1.6

3/19/2013

0.66 U

3/13/2014

0.36 U

10/29/2015

6.1

0.29 U

10/26/2016

9.4

0.29 U

10/18/2017

7.8

0.29 U

3/12/2019

1.1 I

LCIW001

DATE PCE TCE

8/25/2004 1.3 <1.0

8/25/2004 1.13 1.0 U

MW008I

DATE PCE TCE

8/30/2005 1.0 U 1.0 U

6/5/2006 1.0 U 1.0 U

3/11/2008 0.187 U 0.324 U

3/19/2013 0.52 U 0.66 U

MW013I

DATE PCE TCE

3/24/2011 0.94 I 0.36 U

3/22/2012

6.6

0.36 U

3/19/2013 0.67 I 0.66 U

3/13/2014 0.36 U 0.36 U

10/29/2015 2.9 0.58 U

10/26/2016 2.6 0.29 U

10/18/2017 2.3 0.29 U

3/12/2019 0.36 U 0.29 U

DP008

DATE PCE TCE

9/24/2004 <1.0 <1.0

DP007

DATE PCE TCE

8/24/2004

23.3

2.1

MW015I

DATE PCE TCE

3/11/2008 0.187 U 0.324 U

3/19/2013 0.52 U 0.66 U

DP013

DATE PCE TCE

9/3/2004 <1.0 <1.0

WELL ID

DATE SAMPLED

DP002

DATE PCE TCE

10/26/2016 3 3

GCTLs

DP006

DATE PCE TCE

9/24/2004

52.7

<1.0

MW016I

DATE PCE TCE

10/29/2015 0.72 U 0.58 U

10/26/2016 0.36 U 0.29 U

10/18/2017 0.36 U 0.29 U

3/12/2019 0.36 U 0.29 U

1. DATE OF OFFSITE NOTIFICATION 8/29/2006.

2. CVOC - CHLORINATED VOLATILE ORGANIC COMPOUND

3.

* RESULT DETERMINED NOT TO EXCEED THE GCTL BASED ON

THE FDEP MEMORANDUM, DATED NOVEMBER 17, 2011.

4. MW009I WAS DESTROYED WHEN USTs/DISPENSERS WERE

REMOVED FROM THE PROPERTY SOMETIME BETWEEN APRIL

2009 AND APRIL 2010.

5. I = THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

CVOC CONTAMINANTS DETECTED IN THE INTERMEDIATE

ZONE OF THE SURFICIAL AQUIFER

(SCREENED INTERVAL 20 - 25 FEET BGS)

0 20 40

FEET

LEGEND

NOTE(S)

AutoCAD SHX Text

DUMPSTERS

AutoCAD SHX Text

OVERHEAD ELECTRICAL LINES

AutoCAD SHX Text

UNDERGROUND ELECTRICAL LINES

AutoCAD SHX Text

SINK

AutoCAD SHX Text

SUMP

AutoCAD SHX Text

WASHERS

AutoCAD SHX Text

WASHERS

AutoCAD SHX Text

LOCATION OF FORMER DRYCLEANING UNIT

AutoCAD SHX Text

SURFACE WATER DRAINAGE CULVERT

AutoCAD SHX Text

DOUBLE DOORS

AutoCAD SHX Text

NORMANDY BOULEVARD

AutoCAD SHX Text

HAMMOND BOULEVARD

AutoCAD SHX Text

UST

AutoCAD SHX Text

AREA

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

LIL CHAMP FOOD STORE

AutoCAD SHX Text

DRYERS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

HOT WATER HEATER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

GAS

AutoCAD SHX Text

SHRUBS

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FILL FLOOR DRAIN

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

WATER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FORMER LOCATION OF REMEDIAL SYSTEM EQUIPMENT

AutoCAD SHX Text

DP002

AutoCAD SHX Text

DP003

AutoCAD SHX Text

DP005

AutoCAD SHX Text

DP001

AutoCAD SHX Text

DP008

AutoCAD SHX Text

DP010

AutoCAD SHX Text

DP011

AutoCAD SHX Text

DP012

AutoCAD SHX Text

DP009

AutoCAD SHX Text

DP021

AutoCAD SHX Text

DP006

AutoCAD SHX Text

DP014

AutoCAD SHX Text

DP013

AutoCAD SHX Text

DP015

AutoCAD SHX Text

DP016

AutoCAD SHX Text

DP017

AutoCAD SHX Text

DP020

AutoCAD SHX Text

DP004

AutoCAD SHX Text

DP007

AutoCAD SHX Text

DP018

AutoCAD SHX Text

DP019

AutoCAD SHX Text

LCIW001

AutoCAD SHX Text

MW009II

AutoCAD SHX Text

MW008II

AutoCAD SHX Text

MW002II

AutoCAD SHX Text

MW001II

AutoCAD SHX Text

MW006II

AutoCAD SHX Text

MW007II

AutoCAD SHX Text

MW013II

AutoCAD SHX Text

MW012II

AutoCAD SHX Text

MW014II

AutoCAD SHX Text

MW015II

AutoCAD SHX Text

MW016II

AutoCAD SHX Text

DP001

AutoCAD SHX Text

DP015

AutoCAD SHX Text

MW002II

AutoCAD SHX Text I

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (ug/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,

TABLE I, OF THE FLORIDA ADMINISTRATIVE CODE.

3.) PCE - TETRACHLOROETHENE.

4.) TCE - TRICHLOROETHENE.

5.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED.

6.) UST - UNDERGROUND STORAGE TANK.

7.) MW010D WAS MISTAKENLY ABANDONED ALONG WITH THE LIL CHAMP

WELLS BY ANOTHER CONSULTANT PRIOR TO AUGUST 2005.

8.) CVOC - CHLORINATED VOLATILE ORGANIC COMPOUND.

MW001D

DATE PCE TCE

9/28/2004 2.0 U 2.0 U

8/29/2005 1.0 U 1.0 U

6/5/2006 1.0 U 1.0 U

3/10/2008 0.187 U 0.324 U

10/29/2015 0.72 U 0.58 U

10/26/2016 0.36 U 0.29 U

10/18/2017 0.36 U 0.29 U

3/12/2019 0.36 U 0.29 U

WELL ID

DATE SAMPLED

DP002

DATE PCE TCE

10/26/2016 3 3

GCTLs

DP021

DATE PCE TCE

9/3/2004 <1.0 <1.0

DP017

DATE PCE TCE

9/1/2004 <1.0 <1.0

DP020

DATE PCE TCE

9/2/2004 <1.0 <1.0

DP016

DATE PCE TCE

9/1/2004 <1.0 <1.0

DP004

DATE PCE TCE

9/3/2004 <1.0 <1.0

DP019

DATE PCE TCE

9/2/2004 <1.0 <1.0

DP015

DATE PCE TCE

9/1/2004 <1.0 <1.0

DP018

DATE PCE TCE

9/2/2004 <1.0 <1.0

DP014

DATE PCE TCE

9/2/2004 <1.0 <1.0

DP013

DATE PCE TCE

9/3/2004 <1.0 <1.0

DP007

DATE PCE TCE

9/3/2004 1.5 <1.0

MW010D

DATE PCE TCE

9/28/2004 2.0 U 2.0 U

DP006

DATE PCE TCE

9/3/2004 <1.0 <1.0

OVER HEAD ELECTRICAL LINES

PROPERTY BOUNDARY

ASPHALT CUTS

BURIED GAS LINE

BURIED SEWER AND WATER LINE

GROUNDWATER SAMPLE LOCATION

LOWER SURFICIAL AQUIFER DPT

MONITORING WELL LOCATION

LOWER SURFICIAL AQUIFER

(SCREENED INTERVAL 30-35 FT. BGS)

i n

FDEP-DC003

Control No.

FDEP-DC003-G004

RFM

RFM

JCB

CVOC CONTAMINANTS DETECTED IN THE LOWER ZONE OF

THE SURFICIAL AQUIFER

(SCREENED INTERVAL 30 - 35 FEET BGS)

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

A

S U

R E

M E

E

S

N

T

A

T

O

W N

T

E

Z

E

H

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h j a c k s o n v i l l e d r a f t i n g F i l e F

D E

P F

D E

P D

C d c n o c o i n l a u n d r y f n t a c t i v e d r a w i n g l e

N a m e

F

D E

P D

C G d w g

0 12.5 25

FEET

LEGEND

NOTE(S)

AutoCAD SHX Text

DUMPSTERS

AutoCAD SHX Text

OVERHEAD ELECTRICAL LINES

AutoCAD SHX Text

FORMER LOCATION OF REMEDIAL SYSTEM EQUIPMENT

AutoCAD SHX Text

UNDERGROUND ELECTRICAL LINES

AutoCAD SHX Text

SINK

AutoCAD SHX Text

SUMP

AutoCAD SHX Text

WASHERS

AutoCAD SHX Text

WASHERS

AutoCAD SHX Text

LOCATION OF FORMER DRYCLEANING UNIT

AutoCAD SHX Text

SURFACE WATER DRAINAGE CULVERT

AutoCAD SHX Text

DOUBLE DOORS

AutoCAD SHX Text

NORMANDY BOULEVARD

AutoCAD SHX Text

HAMMOND BOULEVARD

AutoCAD SHX Text

UST

AutoCAD SHX Text

AREA

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

LIL CHAMP FOOD STORE

AutoCAD SHX Text

DRYERS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

HOT WATER HEATER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

GAS

AutoCAD SHX Text

SHRUBS

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FILL FLOOR DRAIN

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

WATER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

DP021

AutoCAD SHX Text

DP006

AutoCAD SHX Text

DP014

AutoCAD SHX Text

DP013

AutoCAD SHX Text

DP015

AutoCAD SHX Text

DP016

AutoCAD SHX Text

DP017

AutoCAD SHX Text

DP020

AutoCAD SHX Text

DP004

AutoCAD SHX Text

DP007

AutoCAD SHX Text

DP018

AutoCAD SHX Text

DP019

AutoCAD SHX Text

MW010D

AutoCAD SHX Text

MW001D

AutoCAD SHX Text

MW010D

DP006

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .