CN-370000-HW561-DC015i.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW561|9da97b3024ac9529ec6b9d50686cc80a
Contract number
HW561
Issued by
Florida

About this file

This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under contract HW561 for environmental remediation services at the Former Princeton Cleaners site in Jacksonville, Duval County, Florida. The task assignment DC015i authorizes Golder Associates Inc. to conduct semi-annual groundwater monitoring activities. The contracting parties include FDEP (represented by Ben Grubbs, Contract Manager), Golder Associates Inc. (represented by Matt Crews and Donald Miller), and the site property at 9550 Baymeadows Road, Jacksonville, Florida (ERIC Site #4577).

The scope of work comprises four subtasks: Project Management ($988.37), Groundwater Monitoring and IDW Management for November 2020 ($5,113.93), Groundwater Monitoring and IDW Management for May 2021 ($3,545.14), and Reporting ($2,648.51), with a total task assignment value of $12,295.95 using a fixed-price fee schedule. The work involves sampling from ten monitoring wells (AMW001, AMW004, GMW001S through GMW007S, and GMW002I) for chlorinated volatile organic compounds using EPA Method 8260B, on-site treatment of investigation-derived waste using Golder's aqueous treatment system, and delivery of a Groundwater Monitoring Report with FDEP GIS table updates and ADaPT deliverables. The task assignment period extends from execution through October 29, 2021, with retainage of $0.00 and invoicing contingent upon FDEP approval of deliverables at three milestone dates: December 31, 2020, June 30, 2021, and August 18, 2021.

View the file

Other files

File Type Posted
CN-370000-HW561-A2.pdf PDF
CN-370000-HW561-A4.pdf PDF
CN-370000-HW561-A5.pdf PDF
CN-370000-HW561-A9.pdf PDF
CN-370000-HW561-CO4.pdf PDF
CN-370000-HW561-DC003G.pdf PDF
CN-370000-HW561-DC014G.pdf PDF
CN-370000-HW561-DC014M.pdf PDF
CN-370000-HW561-DC016I.pdf PDF
CN-370000-HW561-DC018I.pdf PDF
CN-370000-HW561-DC019M.pdf PDF
CN-370000-HW561-DC019S.pdf PDF
CN-370000-HW561-DC01D.pdf PDF
CN-370000-HW561-DC01G.pdf PDF
CN-370000-HW561-DC01GCO4.pdf PDF
CN-370000-HW561-DC020E.pdf PDF
CN-370000-HW561-DC021A.pdf PDF
CN-370000-HW561-DC021F.pdf PDF
CN-370000-HW561-DC023CO2.pdf PDF
CN-370000-HW561-DC025i.pdf PDF
CN-370000-HW561-DC026C.pdf PDF
CN-370000-HW561-DC028A.pdf PDF
CN-370000-HW561-DC028C.pdf PDF
CN-370000-HW561-DC028F.pdf PDF
CN-370000-HW561-DC029A.pdf PDF
CN-370000-HW561-DC02D.pdf PDF
CN-370000-HW561-DC02ECO1.pdf PDF
CN-370000-HW561-DC033B.pdf PDF
CN-370000-HW561-DC03C.pdf PDF
CN-370000-HW561-DC03D.pdf PDF
CN-370000-HW561-DC03E.pdf PDF
CN-370000-HW561-DC03FCO1.pdf PDF
CN-370000-HW561-DC03HCO1.pdf PDF
CN-370000-HW561-DC03HCO2.pdf PDF
CN-370000-HW561-DC03JCO1.pdf PDF
CN-370000-HW561-DC03KCO1.pdf PDF
CN-370000-HW561-DC03L.pdf PDF
CN-370000-HW561-DC04C.pdf PDF
CN-370000-HW561-DC04L.pdf PDF
CN-370000-HW561-DC04M.pdf PDF
CN-370000-HW561-DC04o.pdf PDF
CN-370000-HW561-DC05CCO2.pdf PDF
CN-370000-HW561-DC05I.pdf PDF
CN-370000-HW561-DC05JCO2.pdf PDF
CN-370000-HW561-DC06CCO1.pdf PDF
CN-370000-HW561-DC080CO2.pdf PDF
CN-370000-HW561-DC08B.pdf PDF
CN-370000-HW561-DC08LCO2.pdf PDF
CN-370000-HW561-DC08N.pdf PDF
CN-370000-HW561-DC08NCO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW561

D000 N/ADC015i

Golder Associates

Matt Crews

(850) 245-8992Ben Grubbs

ERIC_4577

Princeton Cleaners

9550 Baymeadows Rd, Jacksonville, Duval

Monitoring

This Task Assignment authorizes Golder to conduct semi-annual groundwater monitoring activities in accordance with the October 15, 2020, Scope of Work and Cost Estimate.

Groundwater Monitoring Report and ADaPT/GIS update

08/18/2021

10/29/2021

$ 12,295.95 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2020.10.20 16:09:47 -04'00'

Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2020.10.20 16:09:56 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.10.20 18:59:43 -04'00'

Donald Miller Digitally signed by Donald Miller Date: 2020.10.21 15:39:12 -04'00'

$ 12,295.95

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater monitoring field and IDW treatment documentation and laboratory report via e-mail 12/31/2020

Subtask 3: Groundwater monitoring field and IDW treatment documentation and laboratory report 06/30/2021

Subtask 4: Groundwater Monitoring Report and ADaPT/GIS update 08/18/2021

Subtask 2: Submittal and FDEP approval of Groundwater monitoring field and IDW treatment documentation and laboratory report via e-mail $ 5,113.93

Subtask 3: Submittal and FDEP approval of Groundwater monitoring field and IDW treatment documentation and laboratory report $ 3,545.14

Subtasks 1 & 4: Submittal and FDEP approval of Groundwater Monitoring Report and ADaPT/GIS update $ 3,636.88

$ 12,295.95

HW561

DC015i

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

To: HW561 Contract Negotiation File Princeton Cleaners Jacksonville, Duval County

ERIC_ 4577

From: Ben Grubbs, Project Manager Date: October 20, 2020 Subject: Negotiation Summary HW561 DC015i

This Task Assignment authorizes Golder to conduct semi-annual groundwater monitoring activities in accordance with the October 15, 2020, Scope of Work and Cost Estimate.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Groundwater Monitoring and IDW Management (November 2020) Golder will collect groundwater samples from monitoring wells AMW001, AMW004, GMW001S, GMW002S, GMW003S, GMW004S, GMW005S, GMW006S, GMW007S, and GMW002I. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs).

Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum before being treated with Golder’s aqueous IDW treatment system and disposed of on site.

Subtask 3: Groundwater Monitoring and IDW Management (May 2021) Golder will collect groundwater samples from monitoring wells AMW001, AMW004, GMW001S, GMW002S, GMW003S, GMW004S, GMW005S, GMW006S, GMW007S, and GMW002I. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for VOCs. IDW will be temporarily stored in a 55-gallon drum before being treated with Golder’s aqueous IDW treatment system and disposed of on site.

Subtask 4: Reporting Golder will submit the Groundwater Monitoring Report and ADaPT and GIS deliverables to

FDEP.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $12,295.95 with 85.5 labor hours.

MEMORANDUM

Princeton Cleaners October 20, 2020 Page Two

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

November 2019 P13-82530

Contractor: Golder Associates Inc.

Date: 10/15/2020

Task #: DC015i SubTask 1 Project Management SubTask 6 Site: SubTask 2 Groundwater Monitoring and IDW Management (Nov 202 SubTask 7

Activity/Phase: Semi-annual Mon SubTask 3 Groundwater Monitoring and IDW Management (May 202SubTask 8 roject Manager: Ben Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.96 Project Manager (RFM) 7.5 7.5 $0.00 Practice Leader - LV7 0.0 0 0 0 0 0 0 0 0 0

$57.70 Senior Consultant - LV6 (JB) 4.0 1.0 0 3 0 0 0 0 0 0 $0.00 Senior Sci/Eng.- LV5 0 0.0 0.0 0 0 0 0 0 0 0

$42.96 Sr. Project Sci/Eng - LV4 (RFM) 19 7.0 0 12 0 0 0 0 0 0 $40.33 Sr. Project Sci/Eng - LV4 (JT) 4.0 2.0 0.0 2 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (JS) 22.0 11.0 11.0 0 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (KF) 24 12.0 12 0 0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 4.0 2.0 0.0 2 0 0 0 0 0 0 $0.00 Staff Draftsperson - LD2 0 0.0 0 0 0 0 0 0 0 0 $0.00 Draftsperson - LD1 0 0.0 0 0 0 0 0 0 0 0 $0.00 Senior Technician - LT3 0.0 0.0 0 0 0 0 0 0 0 0 $0.00 Staff Technician - LT2 0 0.0 0 0 0 0 0 0 0 0 $0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0

$24.10 Staff Admin - LA2 (AS) 1.0 0 0.0 1 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 85.5 7.5 35.0 23.0 20 0 0 0 0 0 0

Direct Labor $2,918.90 $324.32 $1,120.14 $605.36 $869.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $5,035.10 $559.45 $1,932.24 $1,044.25 $1,499.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,954.00 $883.77 $3,052.38 $1,649.61 $2,368.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $145.95 $16.22 $56.01 $30.27 $43.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTIMATE

Former Princeton Cleaners

REV: 02/03 Page 1 of 5

November 2019 P13-82530

Contractor: Golder Associates Inc.

Date: 10/15/2020

Task #: DC015i SubTask 1 Project Management SubTask 6 Site: SubTask 2 Groundwater Monitoring and IDW Management (Nov 202 SubTask 7

Activity/Phase: Semi-annual Mon SubTask 3 Groundwater Monitoring and IDW Management (May 202SubTask 8 roject Manager: Ben Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

FDEP COST ESTIMATE

Former Princeton Cleaners

Travel Vehicle Rental $388.00 $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $388.00 $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,452.00 $726.00 $726.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $126.00 $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,578.00 $789.00 $789.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,024.20 $512.10 $512.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $345.40 $172.70 $172.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,434.60 $717.30 $717.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,500.55 $899.99 $4,808.69 $3,380.18 $2,411.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $795.40 $88.38 $305.24 $164.96 $236.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,295.95 $988.37 $5,113.93 $3,545.14 $2,648.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 2 of 5

SITE : Former Princeton Cleaners SUBTASK 2: Groundwater Monitoring and IDW Management (Nov 2020)

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (J. Brown) 1

Sr Project Sci/Eng (R. Mongillo) 7

Staff Sci/Eng (K. Fraley) 12

Staff Sci/Eng (J. Spengler) 11

Project Sci/Eng (B. Lucero) CADD figures. 2

Sr Sci/Eng (J. Thomas) 2

TOTAL LABOR 35

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Miscellaneous Expendables $32.50 Per Day 1 $32.50

Shallow Groundwater Sampling Kit $208.55 Per Day 2 $417.10 Tubing, poly/HDPE $0.25 Per Foot 300 $75.00 Tubing, silicon 3/16 x 3/8 $2.00 Per Foot 10 $20.00 Drum, 55-gallon $58.20 Each 1 $58.20 Portable Compressor $48.50 Per Day 1 $48.50 Generator, 5 kW $66.00 Per Day 1 $66.00

TOTAL EQUIPMENT $717.30

VEHICLE TYPE RATE UNIT USAGE

Truck $97.00 Per Day 1 $97.00 Truck Covid-19 $97.00 Per Day 1 $97.00

TOTAL VEHICLE $194.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs EPA Method 8260B $66 10 1 $726.00

Sample Shipping Small $63 1 $63.00

TOTAL LAB $789.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USAGE

TOTAL $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

Update FDEP GIS tables, run data checker, create and edit error report, review and annotate error report (10 data points x 8 min/point = 80 minutes), and submit FDEP GIS tables; submit ADaPT deliverables.

Round trip travel (1 hour). Water levels, instrument calibration, sampling (9 hours). IDW treatment (1 hour).

Field event preparation (1 hour). Round trip travel (1 hour). Water levels, instrument calibration, and sampling (9 hours). IDW treatment (1 hour).

Scope of work: Sample 10 wells (AMW001, AMW004, GMW001S, GMW002S, GMW003S, GMW004S, GMW005S, GMW006S, GMW007S, and GMW002I) with 2 field staff. Treat IDW on-site for 1 hour and spread on pavement after treating all purge water. Samples and trip blank analyzed for chlorinated VOCs by EPA Method 8260B.

Submit email deliverable.

Senior review of e-mail deliverable

10/15/2020

Obtain site access to sample wells (1 hour). Email report that includes sampling field forms, laboratory report, updated data tables and figures and a brief interpretation of the monitoring results (6 hours).

FINAL --7/24/96

SUBTASK 3: Groundwater Monitoring and IDW Management (May 2021)

DATE: 10/15/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Staff Sci/Eng (K. Fraley) 12

Staff Sci/Eng (J. Spengler) 11

TOTAL LABOR 23

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Miscellaneous Expendables $32.50 Per Day 1 $32.50

Shallow Groundwater Sampling Kit $208.55 Per Day 2 $417.10 Tubing, poly/HDPE $0.25 Per Foot 300 $75.00 Tubing, silicon 3/16 x 3/8 $2.00 Per Foot 10 $20.00 Drum, 55-gallon $58.20 Each 1 $58.20 Portable Compressor $48.50 Per Day 1 $48.50 Generator, 5 kW $66.00 Per Day 1 $66.00

TOTAL EQUIPMENT $717.30

VEHICLE TYPE RATE UNIT USAGE

Truck $97.00 Per Day 1 $97.00 Truck Covid-19 $97.00 Per Day 1 $97.00

TOTAL VEHICLE $194.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs EPA Method 8260B $66 10 1 $726.00

Sample Shipping Small $63 1 $63.00

TOTAL LAB $789.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USAGE

TOTAL $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

Scope of work: Sample 10 wells (AMW001, AMW004, GMW001S, GMW002S, GMW003S, GMW004S, GMW005S, GMW006S, GMW007S, and GMW002I) with 2 field staff. Treat IDW on-site for 1 hour and spread on pavement after treating all purge water. Samples and trip blank analyzed for chlorinated VOCs by EPA Method 8260B.

Field event preparation (1 hour). Round trip travel (1 hour). Water levels, instrument calibration, and sampling (9 hours). IDW treatment (1 hour).

Round trip travel (1 hour). Water levels, instrument calibration, sampling (9 hours). IDW treatment (1 hour).

SUBTASK 4: Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (J. Brown) 3

Sr. Project Sci/Eng (R. Mongillo) 12

Sr Sci/Eng (J. Thomas) 2

Senior Draftperson (B. Lucero) CADD figures. 2

Staff Admin (A. Strayer) 1

TOTAL LABOR 20

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

Reporting, data entry, report tables and figures, author groundwater monitoring report.

Reporting: report formatting, document production, binding and shipping. Create pdf for

OCULUS.

Groundwater monitoring report senior review, conclusions and recommendations

Update FDEP GIS tables, run data checker, create and edit error report, review and annotate error report (10 data points x 8 min/point = 80 minutes), and submit FDEP GIS tables; submit ADaPT deliverables.

LEVEL OF EFFORT/EXPENSE WORKSHEET

10/15/2020

FINAL --7/24/96

Golder Associates Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256

T: +1 904 363-3430 +1 904 363-3445

Golder and the G logo are trademarks of Golder Associates Corporation golder.com

VIA EMAIL

October 15, 2020 P13-82530

Mr. Ben Grubbs Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE COST PROPOSAL FOR SEMI-ANNUAL GROUNDWATER MONITORING

FORMER PRINCETON CLEANERS

9550 BAYMEADOWS ROAD SUITE #33

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY ID NUMBER: ERIC_4577

PROPOSED TASK ASSIGNMENT: DC015I

Dear Mr. Grubbs:

Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (FDEP) with this cost proposal for semi-annual groundwater monitoring at the above-referenced site. Golder recommended in the March 2020 Site Assessment Report (SAR), subsequently approved by the FDEP in an electronic mail correspondence dated June 30, 2020, that Natural Attenuation Monitoring (NAM) activities to be completed initially on a semi-annual frequency for the first year with all the wells being sampled and analyzed for chlorinated VOCs.

This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below divided into four subtasks.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager (Ralph F. Mongillo Jr.). The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.

Mr. Ben Grubbs P13-82530

Florida Department of Environmental Protection October 15, 2020

SUBTASK 2 – GROUNDWATER MONITORING AND IDW MANAGEMENT

(NOVEMBER 2020)

In November 2020, Golder will collect groundwater samples from the following ten monitoring wells: AMW001, AMW004, GMW001S, GMW002S, GMW003S, GMW004S, GMW005S, GMW006S, GMW007S, and GMW002I.

The attached Figure 8 from the 2020 SAR shows the chlorinated volatile organic compound (VOC) concentrations in the nine shallow zone and one intermediate zone surficial aquifer wells.

Prior to groundwater sampling, the water level depth will be measured at the previously mentioned monitoring wells to the top of the well casing using an electronic water level indicator to determine groundwater elevations and flow direction. Groundwater samples will be collected from the wells in accordance with FDEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program (NELAP)-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B. For quality assurance purposes, one trip blank will accompany each sample cooler for laboratory analysis of chlorinated VOCs using EPA Method 8260B.

Golder will temporarily store purge water generated from the groundwater sampling event in a 55-gallon steel drum used to containerize the purge water and treat the investigation derived waste (IDW) on site using Golder’s IDW treatment system. Based on the historical IDW characterization data, the treated purge water will be assumed to be below the regulatory standards. Therefore, Golder will spread the treated aqueous IDW on an impervious surface in locations sufficiently distant from any storm water drains to prevent runoff into the drains. The empty 55-gallon drum will be removed from the site.

An interim deliverable will be submitted via e-mail following completion of the Subtask 2 field activities and receipt of the associated laboratory analytical report. The deliverable will include field documentation, laboratory analytical report, data tables, VOC analytical figures, a brief summary of the results, and recommendations for further assessment, if necessary.

SUBTASK 3 – GROUNDWATER MONITORING AND IDW MANAGEMENT (MAY 2021)

In May 2021, Golder will collect groundwater samples from the same ten monitoring wells that were sampled in November 2020. Prior to groundwater sampling, the water level depths will be measured at each monitoring well to the top of the well casing using an electronic water level indicator to determine groundwater elevations and flow direction. Groundwater sampling and IDW management activities will be conducted using the same methodology described above for the November 2020 sampling event.

SUBTASK 4 – REPORTING

A Groundwater Monitoring Report documenting the results from the November 2020 and May 2021 groundwater sampling events will be completed including a description of sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. After each event, Golder will update the FDEP GIS tables with the new water level data, field parameter measurements, and chlorinated VOC data; run the FDEP data checker on the completed tables; and submit the updated tables and error report. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.

HEALTH AND SAFETY

Golder will update the existing site-specific Health and Safety Plan for the field work, as needed. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A job safety briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed work is $12,295.95. Golder will tentatively schedule the sampling events for November 2020 and May 2021. Each groundwater sampling event is estimated to be completed in one day with two field personnel. The LOE/CEF cost sheets are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule:

Task Proposed Cost

Proposed Schedule/Deliverables

Subtask 1 - Project Management $988.37 August 18, 2021

Subtask 2 – Groundwater Monitoring and IDW Treatment (November 2020)

$5,113.93 December 31, 2020 (Field documentation and Laboratory Report via email)

Subtask 3 – Groundwater Monitoring and IDW Treatment (May 2021)

$3,545.14 June 30, 2021 (Field Documentation and Laboratory Report)

Subtask 4 – Reporting $ 2,648.51 August 18, 2021 (Groundwater Monitoring Report, GIS tables, ADaPT deliverables)

Total/Completion Date $12,295.95 October 29, 2021

Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Golder Associates Inc.

Ralph F. Mongillo Jr., PG Jesse C. Brown, PE Senior Project Geologist Senior Engineer and Associate

RFM/JCB/as

Attachments: Figure 8 Chlorinated VOC Concentrations in the Shallow and Intermediate Zones of the Surficial

Aquifer Attachment A Level of Effort Sheets and Cost Estimate Form

G:\Projects\DEP-Drycleaning\Projects\Jax\Princeton\DC15i - Semi Annual Sampling\Proposals and Task Assignments\Proposal\DC015i - Princeton GW Mon Proposal.docx

DRYER

DROP

OFF

AREA

G G

GRASS

SEWER MH

G

G

G G

G

G

G

G G

G G G

ASPHALT

LAUNDRY

MART

TAP

ROOM

MY PLACE

BAR-N-GRILL

SIDEWALK WITH OVERHANG

S

FAN

DRYER

CLEANING

MACHINE

SHIRT

PRESS

PRESS

MACHINE

DOOR

DOOR

DOOR

CLOTHING

COUNTER

TILE

FLOOR

BOILER

ROOM

1/2

PRESS

BATH

ROOM

G G

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

G

G

S S

S S S

S S

S S

G

G

G

G

G

G

G

G

E

E

E

E

E

E

E

E

E

E

E

E

E

E

G

A T

T

C

O M

A

T

M

G

P R

I N

C

E T

N

S

Q

U

A R

E

B L V

D

E

A S

T

BOLLARDS

ELECTRIC

MANHOLE

SS

GMW005S

GMW004S

GMW003S

GMW001S

GMW002I

GMW002S

GRASS

AMW004

AMW001

GMW007S

GMW006S

i n

FDEP-DC015

Control No.

FDEPDC015-B008

FIGURE

2019-01-24

BCL

RFM

RFM

DJM

2019 SITE ASSESSMENT REPORT

FORMER PRINCETON CLEANERS

9550 BAYMEADOWS ROAD, JACKSONVILLE, FL

FLORIDA DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED VOC CONCENTRATIONS IN THE SHALLOW AND

INTERMEDIATE ZONES OF THE SURFICIAL AQUIFER

(SEPTEMBER 11, 2019 AND MARCH 2020)

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

I F

H

M

E A

S U

R E

M E

N

D

E

S

N

M

A T

W

A

T

O

W N

T

E

Z

E

H

A

B

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h j a c k s o n v i l l e d r a f t i n g F i l e F

D E

P F

D E

P D

C D

C

N o

P r i n c e t o n

C l e a n e r s B

S

A R

A c t i v e

D r a w i n g s

F i l e

N a m e

F

D E

P D

C B d w g

SCALE

0 10 20

FEET

B

A

GMW001S

9/11/2019

PCE 0.36 U

TCE 0.29 U

Cis 1,2 DCE

0.33 I

GMW002S

9/11/2019

PCE 12

TCE 7.9

Cis 1,2 DCE 2.9

GMW002I

9/11/2019

PCE 0.36 U

TCE 0.29 U

Cis 1,2 DCE

0.24 U

AMW004

9/11/2019

PCE 0.36 U

TCE 0.29 U

Cis 1,2 DCE

0.24 U

AMW001

9/11/2019

PCE 0.36 U

TCE 0.29 U

Cis 1,2 DCE

0.24 U

GMW003S

9/11/2019

PCE 0.36 U

TCE 0.39 I

Cis 1,2 DCE

0.24 U

GMW004S

9/11/2019

PCE 71

TCE 8.0

Cis 1,2 DCE 1.0

GMW005S

9/11/2019

PCE 19

TCE 3.1

Cis 1,2 DCE

0.67 I

GMW007S

3/4/2020

PCE 0.36 U

TCE 0.29 U

Cis 1,2 DCE

0.24 U

GMW006S

3/4/2020

PCE 0.36 U

TCE 0.29 U

Cis 1,2 DCE

0.24 U

OVERHEAD POWER LINE

ELECTRIC

E

GAS

G

SEWER MANHOLE

S

WATER

W

BURIED UTILITY

LEGEND

GMW002I

REFERENCE(S)

1. AERIAL IMAGERY SOURCE: GOOGLE EARTH PRO 2010, IMAGE DATED 12.17.18.

IMAGE GEOREFERENCED BY GOLDER AND INTENDED FOR INDICATIVE

PURPOSES ONLY.

2. SURVEY DATA FROM BANKS & BANKS CONSULTING, INC, DATED SEPT. 06, 2019

NOTE(S)

1. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT DETECTED.

2. VOC - VOLATILE ORGANIC COMPOUNDS.

3. ANALYTICAL RESULTS ARE MEASURED IN MICROGRAMS PER LITER (µg/L).

4. SCREEN INTERVAL DEPTHS MEASURED IN FEET BELOW GROUND SURFACE

(ft-bgs).

5. TCE = TRICHLOROETHENE

6. PCE = TETRACHLOROETHENE

7. CIS 1,2 DCE = Cis 1,2 DICHLOROETHENE

8. BOLD FONT INDICATES CONCENTRATION WAS DETECTED ABOVE THE METHOD

DETECTION LIMIT (MDL).

9. SHADED CELL AND BOLD FONT INDICATES CONSTITUENT CONCENTRATION

EXCEEDANCE OF THE FDEP GCTL.

10. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777, TABLE I

OF THE FLORIDA ADMINISTRATIVE CODE (FAC).

GMW001S

Sample ID

9/11/2019

Date Sampled

PCE 3

TCE 3

Cis 1,2 DCE

CONCENTRATIONS

PARAMETERS

AECOM SHALLOW SURFICIAL AQUIFER

MONITORING WELL LOCATION

GMW002S

GOLDER SHALLOW WELL LOCATION

(SURFICIAL AQUIFER MONITORING)

GOLDER INTERMEDIATE WELL LOCATION

(SURFICIAL AQUIFER MONITORING)

A

BAYMEADOWS COMMONS, LTD

10866 WILSHING BLVD., 11th FLOOR

LOS ANGELES, CA 90024

B

COJ PUBLIC WORKS DEPARTMENT

214 N HOGAN STREET, 10th FLOOR

JACKSONVILLE, FL 32202

PROPERTY BOUNDARY

STARWOOD CAPITAL GROUP

400 GALLERIA PKWY SUITE 1450

ATLANTA, GA 30339

C

C

AutoCAD SHX Text

ELEC. TRANS

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .