CN-370000-HW561-DC01L.pdf

PDF 835 KB Posted

Attached to
Master Agreement FL|HW561|9da97b3024ac9529ec6b9d50686cc80a
Contract number
HW561
Issued by
Florida

About this file

This is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW561. The task assignment is issued to Golder Associates, Inc., with Matt Crews as the contractor representative and Ben Grubbs serving as the DEP Contract Manager. The assignment is designated as Task Assignment DC001L, Module D000, with no associated grant number. The work is classified under the phase "Other - Site Review Meeting" and covers all assigned sites.

The task authorizes Golder to deploy two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes. The work consists of two subtasks: Subtask 1 involves project management calculated automatically based on total direct labor hours, and Subtask 2 encompasses the 2021 Site Review Meeting preparation and attendance. The total task assignment value is $3,550.70, comprising 26 labor hours allocated as fixed price compensation. The final deliverable—Site Review Meeting Notes—is due on February 9, 2021, with the period of performance extending through March 31, 2021. The cost structure includes $1,165.12 in direct labor costs, $2,009.83 in overhead (172.50%), and $58.25 in other direct costs, plus a $317.50 completion fee. Payment is scheduled upon submittal and FDEP approval of the Site Review Meeting Notes, as detailed in the Deliverables and Invoice Schedule Attachment.

View the file

Other files

File Type Posted
CN-370000-HW561-A1.pdf PDF
CN-370000-HW561-A3.pdf PDF
CN-370000-HW561-A6.pdf PDF
CN-370000-HW561-A7.pdf PDF
CN-370000-HW561-DC001H.pdf PDF
CN-370000-HW561-DC001J.pdf PDF
CN-370000-HW561-DC003ICO.pdf PDF
CN-370000-HW561-DC003K.pdf PDF
CN-370000-HW561-DC005K.pdf PDF
CN-370000-HW561-DC008G.pdf PDF
CN-370000-HW561-DC010B.pdf PDF
CN-370000-HW561-DC011C.pdf PDF
CN-370000-HW561-DC012B.pdf PDF
CN-370000-HW561-DC013G.pdf PDF
CN-370000-HW561-DC014C.pdf PDF
CN-370000-HW561-DC016C.pdf PDF
CN-370000-HW561-DC016H.pdf PDF
CN-370000-HW561-DC016J.pdf PDF
CN-370000-HW561-DC016M.pdf PDF
CN-370000-HW561-DC019F.pdf PDF
CN-370000-HW561-DC019I.pdf PDF
CN-370000-HW561-DC019R.pdf PDF
CN-370000-HW561-DC019T.pdf PDF
CN-370000-HW561-DC019U.pdf PDF
CN-370000-HW561-DC01ACO1.pdf PDF
CN-370000-HW561-DC01GCO1.pdf PDF
CN-370000-HW561-DC01GCO2.pdf PDF
CN-370000-HW561-DC01GCO7.pdf PDF
CN-370000-HW561-DC01GCO8.pdf PDF
CN-370000-HW561-DC01GCO9.pdf PDF
CN-370000-HW561-DC020DC2.pdf PDF
CN-370000-HW561-DC020H.pdf PDF
CN-370000-HW561-DC022H.pdf PDF
CN-370000-HW561-DC023H.pdf PDF
CN-370000-HW561-DC027B.pdf PDF
CN-370000-HW561-DC027C.pdf PDF
CN-370000-HW561-DC027D.pdf PDF
CN-370000-HW561-DC02C.pdf PDF
CN-370000-HW561-DC04DCO1.pdf PDF
CN-370000-HW561-DC04DCO2.pdf PDF
CN-370000-HW561-DC04E.pdf PDF
CN-370000-HW561-DC04F.pdf PDF
CN-370000-HW561-DC04H.pdf PDF
CN-370000-HW561-DC04HCO1.pdf PDF
CN-370000-HW561-DC04I.pdf PDF
CN-370000-HW561-DC04N.pdf PDF
CN-370000-HW561-DC04OCO2.pdf PDF
CN-370000-HW561-DC05J.pdf PDF
CN-370000-HW561-DC05M.pdf PDF
CN-370000-HW561-DC05N.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Site Review Meeting Notes 02/09/2021

Subtasks 1 & 2: Submittal and FDEP approval of Site Review Meeting Notes $ 3,550.70

$ 3,550.70

HW561

DC001L

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

To: HW561 Contract Negotiation File From: Ben Grubbs, Project Manager Date: January 21, 2021 Subject: Negotiation Summary

HW561 DC001L

This Task Assignment authorizes Golder to have two personnel attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the January 21, 2021, Cost Estimate.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: 2021 Site Review Meeting Golder will have two personnel attend the Annual Site Review Meeting with FDEP and submit meeting notes.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $3,550.70 with 26 labor hours.

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Golder Associates, Inc.

Date: 1/21/2021

Task #: DC001L SubTask 1 Project Management SubTask 6

Site: All Assigned Sites SubTask 2 2021 Site Review Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$49.47 Project Manager (MCC) 3 2.6 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - LV6 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Sci/Eng.- LV5 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Sci/Eng.- LV5 0 0 0 0 0 0 0 0 0 0

$49.47 Project Sci/Eng - LV4 (MCC) 16 16 0 0 0 0 0 0 0 0 $42.96 Project Sci/Eng - LV4 (RM) 4 4 0 0 0 0 0 0 0 0

$0.00 Sci/Eng - LV1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Draftsperson - LD3 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Draftsperson - LD2 0 0 0 0 0 0 0 0 0 0 $0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Technician - LT3 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Technician - LT2 0 0 0 0 0 0 0 0 0 0 $0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0

$24.10 Staff Admin - LA2 (AS) 3 3 0 0 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 26 3 23 0 0 0 0 0 0 0 0

Direct Labor $1,165.12 $129.46 $1,035.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $2,009.83 $223.32 $1,786.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,174.95 $352.78 $2,822.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $58.25 $6.47 $51.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates, Inc.

Date: 1/21/2021

Task #: DC001L SubTask 1 Project Management SubTask 6

Site: All Assigned Sites SubTask 2 2021 Site Review Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $3,233.20 $359.25 $2,873.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $317.50 $35.28 $282.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $3,550.70 $394.53 $3,156.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : All Assigned Sites SUBTASK: 2021 Site Review Meeting

DATE: 1/21/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (M. Crews) Preparation/updating of site summaries. Site summary final deliverable. 12

Senior Sci/Eng (M. Crews) 4 hour meeting 4

Senior Project Sci/Eng (R. Mongillo) 4

Staff Admin (A.Shportun) Site summary handout preparation 3

TOTAL LABOR 23

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

4 hour meeting

FINAL --7/24/96