CN-370000-HW556-DC021F.pdf
PDF 5 MB Posted
- Contract number
- HW556
- Issued by
- Florida
About this file
Task Assignment Summary
This Task Assignment Notification Form (DC021F) is issued by the Florida Department of Environmental Protection (FDEP) under Contract HW556 to Cardno, Inc. for environmental remediation services at the Former Royal Dry Cleaner site (ERIC_5453) located at 2127 S. Tamiami Trail, Venice, Sarasota County, Florida. The assignment was executed on March 12, 2021, with FDEP Project Manager Walsta Jean-Baptiste overseeing the work under Contractual Authority William E. Burns, Jr.
The task authorizes Cardno to complete additional site assessment for plume delineation purposes, specifically including the installation of three monitoring wells and supplemental groundwater sampling. The scope encompasses Subtask 1 (Project Management) and Subtask 2 (Monitoring Well Installation and Supplemental Site Assessment Letter Report). The deliverable, due June 30, 2021, includes a Supplemental Site Assessment Report with ADaPT/GIS updates, well construction logs, investigative derived waste manifests, laboratory analytical reports, and photographic documentation. The total task assignment value is $23,594.54, comprising 131 labor hours with no retainage. Subcontracted services include sonic drilling ($7,975.00 from Preferred Drilling Solutions, the lowest responsive bidder) and investigative derived waste disposal ($1,200.00 from Erwin Remediation). The period of performance extends through November 1, 2021, with invoicing contingent upon FDEP approval of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW556
D000 NADC021F
Cardno, Inc.
Eric Meyers
850-245-8705Walsta Jean-Baptiste
ERIC_5453
Former Royal Dry Cleaner
2127 S Tamiami Trail, Venice, Sarasota County
Assessment
This Task Assignment authorizes Cardno to complete additional site assessment for the purpose of completing plume delineation in accordance with the Cardno scope of work, cost estimate, bid documentation, and schedule received on March 11, 2021.
Supplemental Site Assessment Report
06/30/2021
11/01/2021
$ 23,594.54 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.03.12 11:55:22 -05'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.03.12 11:55:28 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.03.12 13:45:45 -05'00'
Eric Meyers Digitally signed by Eric Meyers Date: 2021.03.12 15:34:59 -05'00'
$ 23,594.54
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Supplemental Site Assessment Report and ADaPT/GIS update - Subtasks 1 and 2 06/30/2021
FDEP approval of Supplemental Site Assessment Report and ADaPT/GIS update - Subtasks 1 and 2 $ 23,594.54
$ 23,594.54
HW556
DC021F
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: HW556 Contract File FROM: Walsta Jean-Baptiste, Project Manager SUBJECT: Former Royal Dry Cleaner; Supplemental Site Assessment; DC021F DATE: March 12, 2021
This Task Assignment authorizes Cardno to complete additional site assessment for the purpose of completing plume delineation in accordance with the Cardno scope of work, cost estimate, bid documentation, and schedule received on March 11, 2021.
There were no changes to the proposed costs. Three bids were requested for subcontracted services with the lowest responsive bidder selected to perform the work. The handling fee was calculated correctly in accordance with Contract HW556.
The cost for this Task Assignment is $23,594.54 with 131 hours.
FDEP COST ESTIMATEContractor: CARDNO, Inc.
Date:
Task #: HW556 DC021F SubTask 1 SubTask 6
Site: SubTask 2 SubTask 7
Activity/Phase: SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
CARDNO, Inc.
$43.32 Project Manager (EM) 8 8.2 $43.32 Project Engineer (EM) 6 6 0 0 0 0 0 0 0 0 $21.60 Staff Geologist (VG) 111 111 0 0 0 0 0 0 0 0 $29.63 CADD Technician (DJD) 6 6 0 0 0 0 0 0 0 0
Total Hours 131 8 123 0 0 0 0 0 0 0 0
CARDNO, Inc.
Direct Labor $3,189.71 $354.41 $2,835.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 169.58% $5,409.11 $601.01 $4,808.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (CARDNO) $8,598.82 $955.42 $7,643.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $8,598.82 $955.42 $7,643.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $159.49 $17.72 $141.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $420.00 $420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $420.00 $420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP: W. Jean-Baptiste / Cardno: E. Meyers
3/11/2021
Project Management
Royal Cleaners (ERIC_5453) Monitoring Well Installation and Supplemental Si
Onsite Well Install (Assessment
REV: 05/2015 CEF: CARDNO HSW Page 1
FDEP COST ESTIMATEContractor: CARDNO, Inc.
Date:
Task #: HW556 DC021F SubTask 1 SubTask 6
Site: SubTask 2 SubTask 7
Activity/Phase: SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
FDEP: W. Jean-Baptiste / Cardno: E. Meyers
3/11/2021
Project Management
Royal Cleaners (ERIC_5453) Monitoring Well Installation and Supplemental Si
Onsite Well Install (Assessment
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $7,975.00 $7,975.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $1,200.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $9,175.00 $9,175.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $917.50 $917.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $10,092.50 $10,092.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,244.00 $2,244.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,244.00 $2,244.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $227.50 $227.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment $875.95 $875.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $116.40 $116.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,219.85 $1,219.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $22,734.66 $973.14 $21,761.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $859.88 $95.54 $764.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $23,594.54 $1,068.68 $22,525.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 2
SITE :
FDEP NO:
SUBTASK 2:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Engineer EM Recommendations and Conclusions, PG Certification 4 Technical Field oversight 2
Staff Geologist VU Travel time (Clearwater to Venice), 1 hour each way (8 days) 16
Monitoring well Installation, well development, and IDW oversight (1.5 day) 15
Letter Report, GIS Data Tables and ADaPT, figures and tables 20
CADD Technician DJD CAD Figures 6
TOTAL LABOR 123
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $420.00 week 1 $420.00
TOTAL VEHICLE $420.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Drilling - Earth Tech Well Installation $7,975.00 LS 1 $7,975.00 Erwin Remediation IDW Removal and Disposal $100.00 per drum 12 $1,200.00
TOTAL SUBS $9,175.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOHs (EPA 8260) (MW) $66.00 26 $1,716.00 VOHs (EPA 8260) (IDW) $66.00 8 $528.00 Shipping $104.00 0 $0.00 Ice $5.00 0 $0.00
TOTAL LAB $2,244.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Drums $58.20 per drum 2 $116.40 Shallow Groundwater Sampling Kit $834.20 per week 1 $834.20 Total Survey Station $41.75 per day 1 $41.75 Expendables $32.50 day 7 $227.50
Sub-Total $1,219.85
TOTAL EQUIPMENT $1,219.85
Royal Cleaners (ERIC_5453)
HW556 DC021F
Monitoring Well Installation and Supplemental Sit 3/11/2021
Monitoring well sampling (26 samples), IDW sampling (8 samples), DTW measurements, IDW management, TOC measurements, Sample Delivery to lab, Warehouse Mob/Demob (6 days), Cardno
2420 Lakeshore Drive
Suite 100
Tallahassee
FL 32312 USA
Phone +1.850.385.8232
Fax 850.385.8233 www.cardno.com
March 11, 2021
Ms. Walsta Jean-Baptiste
Florida Department of Environmental Protection
Waste Site Cleanup Section
Drycleaning Solvent Cleanup Program
2600 Blairstone Road, MS 4520 Tallahassee, FL 32399-2400
Subject: Task Assignment Request (HW556-DC021F) for Well Installation and
Groundwater Monitoring
Former Royal Dry Cleaners
2127 S. Tamiami Trail, Venice, Sarasota County, Florida
ERIC_5453
Dear Walsta:
Cardno Inc. (Cardno) is respectfully submitting this Task Assignment Request to install additional monitoring wells and update groundwater analytical data for the Former Royal Dry Cleaners site
(ERIC_5453). The scope of work is proposed in the following subtasks:
Subtask 1: Project Management
Costs associated with this subtask are calculated automatically at 12.5% of the direct labor costs of the remaining subtasks.
Subtask 2: Monitoring Well Installation and Supplemental Site Assessment Letter Report
This subtask is for the installation of three (3) monitoring wells (Figure 1 and Figure 2) and to perform a groundwater sampling event.
Cardno proposes three (3) monitoring wells to complete groundwater vertical and lateral delineation of impacted groundwater at the site. One monitoring well will be installed onsite, and two monitoring wells
(one upgradient and one downgradient) will be installed offsite. Offsite access to the proposed location to the northeast was previously secured. Offsite access along the northeast side of South Tamiami Trail has previously been attempted; however, no response was received by the property owners. Cardno will attempt to secure access to the properties located on the southwest side of South Tamiami Trail. The proposed monitoring well in the right of way of Jasmine Road was selected as a contingency if access to the properties along the southwest of South Tamiami Trail is not obtained.
Two (2) monitoring wells will be installed to 55 feet below land surface (ft bls) terminating in five (5) feet of 0.01-inch factory slotted screen. One (1) monitoring well will be installed to a total depth of 15 ft bls terminating in 10 feet of 0.01-inch factory slotted screen. The wells will be constructed of 2-inch diameter schedule 40 polyvinyl chloride (PVC) screen and riser pipe. The wells will be protected by an 8-inch manhole set in a 2 foot by 2 foot concrete pad.
The monitoring wells will be installed by sonic drilling technology. Upon installation, the monitoring wells will be developed until visually free of fines.
Task Assignment Request DC021F for Well Install and Groundwater Monitoring
Former Royal Dry Cleaners (ERIC_5453)
Following well development, groundwater samples from the three (3) new monitoring wells, MW-4, MW-12, DW-2, MW-1, MW-1I, MW-7I, MW-9, MW-10, MW-14, MW-15, MW-16, MW-17, MW-18, MW-20, MW-21, MW-22, MW-23, MW-31, MW-32, MW-33, MW-34, MW-35, and a sample from the
Palm Cleaners (ERIC_5433) monitoring well MW-44 will be collected for laboratory analysis of volatile organic compounds (VOCs) by United States Environmental Protection Agency (USEPA) Method 8260.
Additionally, depth to water measurements will be collected from the complete monitoring well network
(a total of 45 monitoring wells) to determine groundwater flow direction(s).
Investigative derived waste (IDW) generated from the well installation, well development, and groundwater sampling event will be containerized onsite in 55-gallon drums. Based on previously groundwater analytical data, drum composite samples will be collected for laboratory analysis for VOCs by USEPA Method 8260. It is estimated that six (6) drums will be generated during the monitoring well installation and well development, and two (2) drums during the groundwater sampling event.
An updated professional land survey is not requested at this time. Cardno will obtain the approximate top of casing of the onsite and northeast monitoring wells using the previously surveyed monitoring well network. The southwest monitoring well top of casing will not be collected due to the distance from the site and line of site.
Following completion of the well installation and groundwater sampling event, Cardno will submit a
Supplemental Site Assessment Letter Report. The report will include a summary of the monitoring well installation and sampling event, recommendations and conclusions as to the completion of site assessment, professional certification, updated tables and figures, well construction logs and permits, investigative derived waste manifests, laboratory analytical report(s), and a photographic log.
Additionally, update Geospatial Information Systems (GIS) data tables and Automated Data Processing
Tool (ADaPT) files will be submitted.
Subcontractor Selection
Monitoring well installation costs were solicited from Groundwater Protection, Inc., Earth-Tech Drilling, and Preferred Drilling Solutions. As the lowest bidder, Preferred Drilling Solutions is selected to provided sonic drilling services.
IDW generated from the well installation, well development, and purge water will be containerized onsite in 55-gallon drums. Costs for transportation and disposal were solicited from Erwin Remediation, Perma-
Fix Environmental Services, and Petrotech Southeast, Inc. As the lowest bidder, Erwin Remediation is selected to transport and dispose of IDW generated.
Subcontractor costs are included in Attachment A.
Task Assignment Request DC021F for Well Install and Groundwater Monitoring
Former Royal Dry Cleaners (ERIC_5453)
Schedule to Complete
The following deliverable and invoice schedule is based on the driller’s availability to begin work on
April 19, 2021:
Subtasks 1 and 2: Project Management and Monitoring Well
Installation and Supplemental Site Assessment Letter
Report (submitted electronically along with one hard copy) including laboratory analytical data, well construction logs and permits, IDW manifests, GIS tables, and ADaPT files
Deliverable Due Date: June 30, 2021
Period of Performance: August 31, 2021
If you have questions regarding this proposal, please contact me at (850) 629-2702 or by email
(eric.meyers@cardno.com).
Sincerely, Eric Meyers
Project Engineer
For Cardno
Enc: Figures, Att A
G
C
T
L
N
A
D
C
DW-3
DW-2
MW-4
MW-2
MW-1
MW-3
MW-5I
MW-5S
MW-10
MW-6I
MW-6S
MW-1I
MW-8I
MW-9
MW-11
MW-12
MW-13
MW-14
MW-27
MW-28
MW-15
MW-16
MW-17
MW-26
MW-18
MW-22
MW-23
MW-19 MW-20
MW-7I
MW-7S
MW-24
MW-25
MW-32
MW-31
MW-30
MW-29
MW-33
MW-34
MW-35
MW-21
DW-1
PMW
PMW
MW-044
(PALM CLEANERS)
PMW
F I L E
K
D r a f t i n g
F o r
B r a n c h
O f f i c e s F l o r i d a B r u c e R o y a l R o y a l C l e a n e r s A d w g
L A
S T
S
A V
E D
M o n a
P
L O
T T
E D
M o n a
B
Y
D a n n y D i f f e n b a c h
FIGURE 1
SITE PLAN
FORMER ROYAL DRY CLEANER
2127 S. TAMIAMI TRAIL, VENICE, FL 34293
FAC. ID. ERIC_5453
00 60' 120'
LEGEND
SHALLOW MONITOR WELL
MW-1
DEEP MONITOR WELL
DW-1
ug/L = MICROGRAMS PER LITER
FT BLS = FEET BELOW LAND SURFACE
I = REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT (MDL) AND THE LABORATORY PRACTICAL
QUANTITATION LIMIT
Q = SAMPLE ANALYZED OUTSIDE OF HOLD TIME
TCE = TRICHLOROETHENE
U = COMPOUND WAS ANALYZED FOR BUT NOT DETECTED
RESULTS IN BOLD EXCEED GROUNDWATER CLEANUP
TARGET LEVELS (GCTLs) ESTABLISHED IN CHAPTER
62-777, FLORIDA ADMINISTRATIVE CODE (FAC)
RESULTS IN BOLD EXCEED NATURAL ATTENUATION
DEFAULT CONCENTRATIONS (NADCs) ESTABLISHED IN
CHAPTER 62-777, FLORIDA ADMINISTRATIVE CODE (FAC)
ESTIMATED EXTENTS OF GCTL EXCEEDANCE (DASHED
WHERE INFERRED)
ESTIMATED EXTENTS OF NADC EXCEEDANCE (DASHED
WHERE INFERRED)
G
C
T
L
N
A
D
C
PROPOSED MONITOR WELL
PMW
SW
NE
M W
M W
S
D W
M W
I
D W
M W
M W
I
M W
S
M W
M W
I
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
X
X
M W
X
X
M W
X
X
F I L
E
K
D r a f t i n g
F o r
B r a n c h
O f f i c e s F l o r i d a B r u c e
R o y a l R o y a l
C r o s s s e c t i o n d w g
L
A S
T
S
A V
E D
M o n a
P
L O
T T
E D
M o n a
B
Y
D a n n y D i f f e n b a c h
FIGURE 2
INTERPRETIVE CROSS SECTION
TCE CONCENTRATIONS IN GROUNDWATER
TCE (µg/L) = TRICHLOROETHENE CONCENTRATION IN MICROGRAMS PER LITER
U = COMPOUND WAS ANALYZED FOR BUT NOT DETECTED
I = ANALYTE CONCENTRATION BETWEEN LABORATORY
METHOD DETECTION LIMIT AND PRACTICAL QUANTITATION LIMIT
= WATER LEVEL (2019 COMPOSITE)
= MONITORING WELL (RED = PROPOSED)
= ESTIMATED EXTENT OF PCE CONCENTRATION OF 3 (µg/L) AT THE
GROUNDWATER CLEANUP TARGET LEVEL (GCTL)
= EXISTING LAND SURFACE
= ESTIMATED EXTENT OF TCE CONCENTRATION OF 300 (µg/L) AT THE
NATURAL ATTENUATION DEFAULT CONCENTRATION (NADC)
LEGEND
FORMER ROYAL DRY CLEANER
2127 S. TAMIAMI TRAIL, VENICE, FL 34293
FAC. ID. ERIC_5453
Attachment A: Subcontractor Costs
Mobilization:
1. Install two (2) wells to 55 ft bls (screened 50-55), 2-inch, 0.01-inch factory slotted screen. Temp override casing to 45 ft bls.
2. Install one (1) well to 15 ft bls (screened 10-15), 2-inch, 0.01-inch factory slotted screen.
Unit Number of
Units Unit Cost Cost Comments Mobilization Lump Sum 1 $0.00 Sonic Daily Rate Per Day 1.5 $3,350.00 $5,025.00 Per Diem Per Day 1 $300.00 $300.00 Monitoring Well Installation Per foot 125 $12.00 $1,500.00 Well Development per 1/2 hr 3 $25.00 $75.00 Well Completion per well 3 $100.00 $300.00 Drums per drum 10 $45.00 $450.00 Permits per permit 3 $75.00 $225.00 Include costs for ROW (drilling only) Hydrant Set-up Lump Sum 1 $50.00 $50.00 Decontamination Lump Sum 1 $50.00 $50.00 Miscellaneous Lump Sum 1 $0.00
$7,975.00
1.5 Number of field days
Company Preferred Drilling Solutions Company Representative Kevin Bonacum, Estimator Date 3/8/2021
Former Royal Dry Cleaners (ERIC_5453) 2127 S Tamiami Trail, Venice, Sarasota County, FL
Monitoring Well Install
1. Install two (2) wells to 55 ft bls (screened 50-55), 2-inch, 0.01-inch factory slotted screen. Temp override casing to 45 ft bls.
2. Install one (1) well to 15 ft bls (screened 10-15), 2-inch, 0.01-inch factory slotted screen.
Unit
Number of
Units Unit Cost Cost Comments
Mobilization Lump Sum 1 $1,500.00 $1,500.00
Sonic Daily Rate Per Day 1 $4,150.00 $4,150.00
Per Diem Per Day 1 $475.00 $475.00
8" Override Casing per foot 90 $15.00 $1,350.00
Monitoring Well Installation Per foot 125 $12.00 $1,500.00
Well Development per 1/2 hr 3 $75.00 $225.00
Well Completion per well 3 $120.00 $360.00
Drums per drum 6 $60.00 $360.00
Permits per permit 3 $80.00 $240.00 Well Permits Only
Hydrant Set-up Lump Sum 1 $825.00 $825.00
Decontamination Lump Sum 1 $0.00 $0.00 Included
Miscellaneous Lump Sum 1 $0.00
$10,985.00
1 Number of field days
Company Earth Tech Drilling, Inc.
Company Representative Charles Bucher
Date 3/5/2021
Former Royal Dry Cleaners (ERIC_5453)
2127 S Tamiami Trail, Venice, Sarasota County, FL
ROW Permits & MOT provided by client if needed.
1. Install two (2) wells to 55 ft bls (screened 50-55), 2-inch, 0.01-inch factory slotted screen. Temp override casing to 45 ft bls.
2. Install one (1) well to 15 ft bls (screened 10-15), 2-inch, 0.01-inch factory slotted screen.
Unit
Number of
Units Unit Cost Cost Comments
Mobilization Lump Sum 1 $1,500.00 $1,500.00
Sonic Daily Rate Per Day 1 $4,250.00 $4,250.00
Sonic Daily Rate per 1/2 day 1 $2,500.00 $2,500.00
Per Diem Per Day 1 $325.00 $325.00
8" Override Casing per foot 90 $30.00 Included
Monitoring Well Installation Per foot 125 $10.00 $1,250.00
Well Development per 1/2 hr 3 $75.00 $225.00
Well Completion per well 3 $100.00 $300.00
Drums per drum 4 $55.00 $220.00
Permits per permit 3 $0.00 $0.00 No charge per SWFLWMD
Hydrant Set-up Lump Sum 1 $500.00 $500.00
Decontamination Lump Sum 1 $0.00 $0.00 Included
Miscellaneous Lump Sum 1 $0.00
$11,070.00
1.5 Number of field days
Company Groundwater Protection
Company Representative Todd Hodgson
Date 3/9/2011
Former Royal Dry Cleaners (ERIC_5453)
2127 S Tamiami Trail, Venice, Sarasota County, FL
ROW Permits & MOT provided by client.
408 Ditmar Street
Pensacola, FL 32503
P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To:
Mr. Eric Myers
Cardno
2420 East Lakeshore Drive – Suite 100
Tallahassee, FL 32312
August 4, 2020
Re: Drum Disposal - Non-Hazardous Dry-Cleaning Solvent Impacted Soil & Water
Mr. Myers:
The price to dispose of a 55-gallon drum of non-hazardous soil or water impacted with dry-cleaning solvents located within the State of Florida will be $100.00 per drum.
This price is a flat-rate that includes both the transportation and disposal for non-hazardous material and is valid for 12-months from the date of this letter.
If the soil or water is deemed to be hazardous additional charges will apply.
We appreciate the opportunity to work with you on this. Should you have any questions, please contact me directly at (850) 292-6511.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: Erwinremediation@gmail.com Phone: (850) 292-6511
February 4, 2019
Eric Meyers Cardno 2420 W Lakeshore Dr Suite 100 Tallahassee Fl 32303 850-629-2702
RE: Drum disposal
Dear Eric:
Petrotech Southeast, Inc. would like to take this opportunity to thank you for your interest in our services. Per your request, please find our proposal for the services you require.
Description of work: Petrotech Southeast, Inc. proposes to provide the equipment and personnel to remove IDW drums from site in Central Fl Area. Petrotech also can manage out of area pickups, Jacksonville, Tallahassee, And South Fl. Drums must be placed on hard surface, IE concrete or asphalt. Additional loading charge may apply. All non-hazardous waste material will be recycled and/or disposed of according to Florida’s Department of Environmental Protection’s regulations.
All rates are based upon standard working hours 8 AM to 5 PM Monday through Friday.
Product / Service Unit Type Unit Price
Non Haz, IDW Solid Drum Disposal with Trans and fuel charge
Per Drum $125.00
Non Haz, IDW water disposal Per Drum $105.00 Transportation out of service area Per Drum $125.00
With approved Analytical / profile. Water 8260 Volatiles, Solids 8 RCRA metals & Volatiles.
Estimate is for budgetary purpose only actual Quantities invoiced.
Payment Terms: Net 30 days.
All other Petrotech Southeast, Inc. standard terms and conditions shall apply. Any applicable taxes and fuel surcharges shall be invoiced accordingly. Quoted pricing is good for 90 days.
If you have any questions regarding this service agreement, please do not hesitate to call me 407-656-8114. Otherwise, please return a signed copy.
Best regards, PETROTECH SOUTHEAST, INC. Cardno
Mike Anderson
Mike Anderson Date Signature Date Sales Title
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Royal DC021F Costs 3112021.pdf |
| Cost Estimate |
| Royal DC021F Costs 3112021.pdf |
| Cost Estimate |
| sub 2 |
| Royal DC021F Cost Proposal 3112021.pdf |
| SONIC-work |
| 430458050 |
| 271241640 |
| 766571250 |
| Royal Cross FIG 1 FOR ERIC 3-8-2021 (1) |
| Royal Cross FIG 2 FOR ERIC 3-8-2021 |
| Royal DC021F Costs 3112021.pdf |
| Cost Estimate |
| sub 2 |
File details come from the government source that posted it. Updated .