Summary

This is a Task Assignment Notification for Contract HW556, issued by the Florida Department of Environmental Protection (FDEP) to Cardno, Inc., for supplemental site assessment and monitoring well installation services at the Touch of Class Cleaners facility located at 6402 US Highway 41 North in Apollo Beach, Hillsborough County, Florida. The contract is managed by FDEP Contract Manager Walsta Jean-Baptiste under the Hazardous Waste Cleanup Section. The task assignment authorizes work in accordance with the HSW scope of work, cost estimate forms, bid documentation, and implementation schedule received on February 8, 2019, with an execution period through July 31, 2019.

The task assignment is structured as a fixed-price contract with a total value of $50,888.60 and includes two primary deliverables with corresponding invoice milestones. The first deliverable, due March 29, 2019, consists of documentation of supplemental site assessment activities including field logs, notes, and photographic documentation (Subtasks 2 and 3), invoiceable at $42,266.17 upon FDEP approval. The second deliverable, due April 29, 2019, comprises the Supplemental Site Assessment Report, IDW manifests, and ADaPT/GIS database updates (Subtasks 1 and 4), invoiceable at $8,622.43 upon FDEP approval. The work includes groundwater profiling activities using sonic drilling technology with up to five borings to 40 feet depth, installation of up to eight soil vapor extraction wells and four monitoring wells, and preparation of a supplemental assessment report utilizing Earth Volumetric Studio for groundwater plume visualization. No retainage is withheld, and the total task assignment value of $50,888.60 covers 172 hours of work involving project management, field activities, laboratory analysis, and report preparation.

View the file

Other files

File Type Posted
CN-370000-HW556-A2.pdf PDF
CN-370000-HW556-A3.pdf PDF
CN-370000-HW556-BF004C.pdf PDF
CN-370000-HW556-BF004C.pdf.crdownload CRDOWNLOAD file
CN-370000-HW556-BF008A.pdf PDF
CN-370000-HW556-BF04A.pdf PDF
CN-370000-HW556-BF04ACO1.pdf PDF
CN-370000-HW556-BF05BCO1.pdf PDF
CN-370000-HW556-BF05BCO3.pdf PDF
CN-370000-HW556-BF1A.pdf PDF
CN-370000-HW556-BF562A.pdf PDF
CN-370000-HW556-BF562B.pdf PDF
CN-370000-HW556-BF563A-1.pdf PDF
CN-370000-HW556-BF563A-2.pdf PDF
CN-370000-HW556-CO2.pdf PDF
CN-370000-HW556-CO4.pdf PDF
CN-370000-HW556-DC001E.pdf PDF
CN-370000-HW556-DC001G.pdf PDF
CN-370000-HW556-DC003G.pdf PDF
CN-370000-HW556-DC005C.pdf PDF
CN-370000-HW556-DC006F.pdf PDF
CN-370000-HW556-DC009B.pdf PDF
CN-370000-HW556-DC010C.pdf PDF
CN-370000-HW556-DC012G.pdf PDF
CN-370000-HW556-DC013C.pdf PDF
CN-370000-HW556-DC014B.pdf PDF
CN-370000-HW556-DC017C.pdf PDF
CN-370000-HW556-DC017D.pdf PDF
CN-370000-HW556-DC018H.pdf PDF
CN-370000-HW556-DC019C.pdf PDF
CN-370000-HW556-DC01ACO4.pdf PDF
CN-370000-HW556-DC01ACO5.pdf PDF
CN-370000-HW556-DC01ACO7.pdf PDF
CN-370000-HW556-DC01K.pdf PDF
CN-370000-HW556-DC020D.pdf PDF
CN-370000-HW556-DC025C.pdf PDF
CN-370000-HW556-DC02C.pdf PDF
CN-370000-HW556-DC02CCO1.pdf PDF
CN-370000-HW556-DC02ECO1.pdf PDF
CN-370000-HW556-DC02ECO4.pdf PDF
CN-370000-HW556-DC030A.pdf PDF
CN-370000-HW556-DC031A.pdf PDF
CN-370000-HW556-DC03ACO1.pdf PDF
CN-370000-HW556-DC03BCO1.pdf PDF
CN-370000-HW556-DC03DCO2.pdf PDF
CN-370000-HW556-DC03H.pdf PDF
CN-370000-HW556-DC04A.pdf PDF
CN-370000-HW556-DC05B.pdf PDF
CN-370000-HW556-DC05CCO3.pdf PDF
CN-370000-HW556-DC05F.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW556 Task Assignment #: DC022C

Deliverables:

Deliverable Deliverable Due Date Documenation of completion of supplemental site assessment activities including field logs, field notes, and a photographic log depicting site conditions before and after site assessment activities (submitted electronically) - Subtasks 2 and 3

29-Mar-19

Supplemental Site Assessment Report, IDW manifests, and ADaPT/GIS update (submitted electronically) - Subtasks 1 and 4 29-Apr-19

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced FDEP approval of documenation of completion of supplemental site assessment activities including field logs, field notes, and a photographic log depicting site conditions before and after site assessment activities (submitted electronically) - Subtasks 2 and

$42,266.17

FDEP approval of Supplemental Site Assessment Report, IDW manifests, and ADaPT/GIS update (submitted electronically) - Subtasks 1 and 4

$8,622.43

TOTAL COST $50,888.60

BWC TAFORM 01/18

HW556 TA DC022Cy.pdf
Deliverable & Invoice Schedule