CN-370000-HW556-DC001J.pdf
PDF 527 KB Posted
- Contract number
- HW556
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form (DC001J) issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW556 to Cardno, Inc., with HSW Engineering, Inc. as a subcontractor. The task assignment was authorized by Walsta Jean-Baptiste, DEP Contract Manager, with contractual authority provided by William E. Burns, Jr. The assignment pertains to multiple sites within Florida under the Drycleaning Solvent Cleanup Program and relates to an annual site review meeting scheduled for October 22, 2020.
The task assignment covers participation in the annual site review meeting for projects related to Contract HW556, with primary deliverables consisting of a meeting agenda with associated site data due October 12, 2020, and meeting minutes from the October 22, 2020 annual site review meeting due November 5, 2020. The total contract value is $8,853.89 on a fixed-price basis, with no retainage, cost reimbursement, or fee schedule components. The task assignment is structured on a fixed-price model covering 51 total labor hours, including senior-level personnel from both contractors for meeting preparation, attendance, and minutes preparation. The period of performance extends through January 29, 2021, with invoice payment contingent upon FDEP approval of the meeting notes. No travel costs, subcontractor services, or other direct costs beyond $146.69 in miscellaneous expenses are included.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW556
D000 NADC001J
Cardno, Inc.
W. Bruce Moore
850-245-8705Walsta Jean-Baptiste
Multiple
Multiple
Multiple
Other - Site Review Meeting
This Task Assignment is for Cardno and HSW to participate in the annual site review meeting for projects related to Contract HW556 in accordance with the Cardno scope of work, cost estimate form, and schedule.
Site review meeting notes from October 22, 2020 Annual Site Review Meeting (submitted electronically)
11/05/2020
01/29/2021
$ 8,853.89 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2020.08.20 09:38:31 -04'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2020.08.20 09:38:38 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.08.20 10:39:38 -04'00'
Eric Meyers Digitally signed by Eric Meyers Date: 2020.08.20 15:27:00 -04'00'
$ 8,853.89
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Submit site review meeting agenda and associated site data (submitted electronically) 10/12/2020
Submit site review meeting notes from October 22, 2020 Annual Site Review Meeting (submitted electronically) - Subtasks 1 and 2 11/05/2020
FDEP approval of site review meeting notes from October 22, 2020 Annual Site Review Meeting (submitted electronically) - Subtasks 1 and 2 $ 8,853.89
$ 8,853.89
HW556
DC001J
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: HW556 Contract File FROM: Walsta Jean-Baptiste, Contract Manager SUBJECT: Annual Site Review Meeting DC001J DATE: August 20, 2020
This Task Assignment is for Cardno and HSW to participate in the annual site review meeting for projects related to Contract HW556 in accordance with the Cardno scope of work, cost estimate form, and schedule.
There are no changes to the proposed costs.
The meeting cost is justified because it will expedite site activity related to assessment, remediation, operation and maintenance, and site closure. A site meeting agenda and related site data will be submitted prior to the meeting. The early submittal allows the WSCS technical group to review data prior to the meeting. Multiple engineers or geologists from both Cardno and HSW will participate in the meeting and help prepare the agenda but costs are limited to one senior person each from Cardno and HSW.
The total cost related to this Task Assignment is $8,853.89 with 51 hours.
FDEP COST ESTI MATEContractor: CARDNO, Inc.
Date: 8/19/2020
Task #: HW556 DC001J SubTask 1 Project Management SubTask 6
Site: SubTask 2 2020 Site Review Meeting and Minutes SubTask 7
Activity/Phase: 2020 Site Review Meeting SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
CARDNO, Inc.
$42.31 Project Manager (EM) 4 3.5 $55.29 Senior Geologist (BM) 20 20 0 0 0 0 0 0 0 0 $42.31 Project Engineer (EM) 2 2 0 0 0 0 0 0 0 0
HSW Engineering, Inc.
$45.20 Project Manager (NSB) 4 3.9 $66.35 Principal (SDF) 20 20 0 0 0 0 0 0 0 0 $45.20 Senior Engineer (NSB) 2 2 0 0 0 0 0 0 0 0
Total Hours 51 7 44 0 0 0 0 0 0 0 0
CARDNO, Inc.
Direct Labor $1,339.22 $148.80 $1,190.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 169.58% $2,271.05 $252.34 $2,018.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (CARDNO) $3,610.27 $401.14 $3,209.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
HSW Engineering, Inc.
Direct Labor $1,594.58 $177.18 $1,417.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 170.00% $2,710.79 $301.21 $2,409.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (HSW) $4,305.37 $478.39 $3,826.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $7,915.64 $879.53 $7,036.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $146.69 $16.30 $130.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Multiple
FDEP: Jean-Baptiste/Cardno: Meyers
REV: 05/2015 CEF: CARDNO HSW Page 1
FDEP COST ESTI MATEContractor: CARDNO, Inc.
Date: 8/19/2020
Task #: HW556 DC001J SubTask 1 Project Management SubTask 6
Site: SubTask 2 2020 Site Review Meeting and Minutes SubTask 7
Activity/Phase: 2020 Site Review Meeting SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Multiple
FDEP: Jean-Baptiste/Cardno: Meyers
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,062.33 $895.83 $7,166.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $791.56 $87.95 $703.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,853.89 $983.78 $7,870.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 2
SITE : Annual Site Review Meeting
FDEP NO: Numerous
SUBTASK: 2020 Site Review Meeting and Minutes
DATE: 8/19/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist BM Meeting Preparation and Review Meeting 20
Project Engineer EM Meeting Preparation and Review Meeting and Meeting Minutes 2
Principal SDF Meeting Preparation and Review Meeting 20
Senior Engineer NSB Meeting Preparation and Review Meeting and Meeting Minutes 2
TOTAL LABOR 44
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries
Cardno
2420 Lakeshore Drive Suite 100 Tallahassee
FL 32312 USA
Phone +1.850.385.8232 Fax 850.385.8233 www.cardno.com
August 19, 2020
Ms. Walsta Jean-Baptiste
Florida Department of Environmental Protection
Waste Site Cleanup Section
Drycleaning Solvent Cleanup Program
2600 Blairstone Road, MS 4520
Tallahassee, FL 32399-2400
Subject: Task Assignment Request for the HW556 Annual Site Review Meeting
Task Assignment Number HW556-DC001J
Dear Walsta:
Cardno Inc. (Cardno) and HSW Engineering, Inc. (HSW) are pleased to submit this Task Assignment Request for the HW556 Annual Site Review Meeting. The Annual Site Review Meeting is scheduled for October 22, 2020. The
Annual Site Review Meeting will be conducted electronically through Microsoft Teams.
Subtask 1: Project Management
Costs associated with this subtask are calculated at 12.5% of the direct labor costs of the remaining subtasks.
Subtask 2: Annual Site Review Meeting
Prior to the Annual Site Review Meeting, Cardno and HSW will prepare a summary (electronic and/or hardcopy) of each site tasked to Cardno/HSW including a brief background, soil and groundwater conditions, site assessment activities, remedial action activities, and proposed path forward.
Cardno anticipates Bruce Moore and myself, and HSW anticipates Steven Folsom and Nick Barnes, will prepare documentation and attend the meeting.
Following the Annual Site Review Meeting, Cardno and HSW will prepare meeting minutes summarizing each site, site conditions, and agreed path forward.
Schedule
Based on conducting the Annual Site Review Meeting on October 22, 2020, Cardno requests the following deliverable and invoice schedule.
Subtasks 1 and 2: Annual Site Review Meeting Notes and Summary
Deliverable Date: November 20, 2020
Period of Performance Through: January 31, 2021
If you have questions regarding this proposal, please contact me at (850) 629-2702 or by email
(eric.meyers@cardno.com).
Sincerely, Eric Meyers
Project Manager
For Cardno mailto:eric.meyers@cardno.com
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| 2020 Site Review Costs DC001J.pdf |
| Cost Estimate |
| Sub 2 |