CN-370000-HW556-BF04BCO1.pdf
PDF 763 KB Posted
- Contract number
- HW556
- Issued by
- Florida
About this file
This is a Task Assignment Notification Change Order Form for DEP Contract No. HW 556, Change Order No. 1, issued by the State of Florida Department of Environmental Protection. The contract involves Cardno TBE as the contractor, with Roger Register serving as the contractor representative and Joe McGarrity as the DEP Contract Manager. The work is being performed at the 3D Oil Site in South Daytona Beach, Florida.
The change order modifies the scope of work by reducing the monitoring well (MW) installation scope from three wells to two wells, while increasing the ground water sample analyses from three to six samples. The task assignment and deliverable end dates have been extended 30 days to October 30, 2014. The scope modifications result in a net cost increase of $343.04, comprising a $577.09 credit for well reduction and an $810.04 increase for additional laboratory analyses. The original task amount of $88,856.63 has been increased to $89,199.67 with all change orders applied. The final deliverable is a Draft and Final Limited Source Removal Report due by October 30, 2014. Invoice milestones include submission of field notes ($71,665.22) and submission of the draft and final report ($17,534.45), with a total contract cost of $89,199.67.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .