Task Assignment Notification Summary
This is a Task Assignment Notification Form (WCP TAFORM 01_18) issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW555. The contract is between the FDEP and GHD Services, Inc., a contractor based in Tampa, Florida. The task assignment was executed on November 9, 2021, and is managed by DEP Contract Manager Kevin Kane and Contractor Representative Brian Moore. The work is being performed at the Former Touch of Class Cleaners site located at 7414 University Boulevard, Winter Park, Orange County, Florida (DEP Site #ERIC_4997).
The task assignment (DC010M) calls for GHD Services, Inc. to conduct groundwater monitoring and generate a Groundwater Monitoring Report in accordance with a November 2021 scope of work and cost proposal. The monitoring work includes two subtasks: Project Management and Groundwater Monitoring activities consisting of site access coordination, field work preparation, water level measurements at 20 monitor wells, groundwater sampling from shallow, intermediate, and deep wells, laboratory analysis for volatile organic compounds, and preparation of a comprehensive monitoring report with updated GIS tables and ADAPT deliverables. The fixed-price task assignment value is $6,078.23, with no retainage, cost reimbursement, or additional fees. The final deliverable—the Groundwater Monitoring Report—is due March 31, 2022, with task execution extending through June 30, 2022. The cost estimate details labor costs totaling $4,125.93, subcontractor costs of $110.00 for waste disposal, laboratory analytical costs of $654.00, field expenses of $601.30, travel costs of $97.00, and a completion fee of $412.59.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 N/ADC010M
GHD Services, Inc.
Brian Moore
(850) 245-8971Billy Hessman
ERIC_4997
Former Touch of Class Cleaners
7414 University Blvd, Winter Park, Florida 32792
Monitoring
GHD Services, Inc. will conduct groundwater monitoring in accordance with the November 2021 scope of work and cost proposal. A Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
03/31/2022
06/30/2022
$ 6,078.23 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Kevin Kane Digitally signed by Kevin Kane Date: 2021.11.09 11:06:53 -05'00'
Kevin Kane Digitally signed by Kevin Kane Date: 2021.11.09 11:07:08 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.11.09 12:18:57 -05'00'
Brian Moore Digitally signed by Brian Moore Date: 2021.11.09 17:37:45 -05'00'
$ 6,078.23
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report + Project Management 03/31/2022
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report + Project Management $ 6,078.23
$ 6,078.23
HW555
DC010M
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 11/08/21
Task #: DC010M SubTask 1 Project Management SubTask 6
Site: Former Touch of Class Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 2.47 2.468 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$40.00 Professional Engineer/Geologist ES 15.50 15.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.21 Project Engineer/Scientist DB 9.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$17.15 Junior Technician WJ 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician PM 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 5.25 5.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 49.72 2.468 47.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,548.19 $172.02 $1,376.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,749.45 $194.38 $1,555.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $433.50 $48.17 $385.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $394.79 $43.87 $350.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,125.93 $458.44 $3,667.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $77.41 $8.60 $68.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 11/08/21
Task #: DC010M SubTask 1 Project Management SubTask 6
Site: Former Touch of Class Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $594.00 $594.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $654.00 $654.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $568.80 $568.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $601.30 $601.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,665.64 $467.04 $5,198.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $412.59 $45.84 $366.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $6,078.23 $512.88 $5,565.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Former Touch of Class Cleaners
PROJECT NUMBER: 090150
FDEP NO: ERIC_4997
SUBTASK: Groundwater Monitoring
DATE: 11/8/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer BM Conclusions/Recommendations 1
Professional Geologist ES Site Access Coordination (site and Target properties) 2 Professional Geologist ES Specify laboratory data deliverable/Sample Kit 1 Professional Geologist ES Field sampling SOW/coordinate site access 1 Professional Geologist ES QA/QC field and laboratory data 1 Professional Geologist ES Project Background 1 Professional Geologist ES Groundwater Sampling Methods 1 Professional Geologist ES Profile and coordinate IDW disposal 1 Professional Geologist ES Groundwater flow evaluation (shallow, intermediate, deep) 2 Professional Geologist ES Water Quality Parameter Summary 1 Professional Geologist ES Groundwater Analtycial Results 2 Professional Geologist ES QA/QC Laboratory Data 1.5 Professional Geologist ES Conclusions/Recommendations 1
15.5
Project Engineer/Scientist DB Mob/demob (from orlando) 1.5 Project Engineer/Scientist DB Water Levels (all wells - 20 total) 1.5 Project Engineer/Scientist DB Groundwater Sampling (4 wells) 6
Junior Technician WJ Mob/demob 4 Junior Technician WJ Water Levels (all wwells - 20 total) 1.5 Junior Technician WJ Groundwater Sampling (4 wells) 6
11.5
Drafting Technician PM Prepare GW Flow maps (shallow, intermediate, deep) 3 Drafting Technician PM Prepare VOC plume figures with updated concentration data 2
Staff Assistant SS Data Entry (20 wls, and 8 monitor wells) 1.25 Staff Assistant SS Update data tables 1 Staff Assistant SS Document Preparation/Publishing 2 Staff Assistant SS Update GIS/ADAPT 1
5.25
TOTAL LABOR 47.25
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation IDW Disposal $100 drum 1 $100.00
TOTAL SUBS $100.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA 8260 $66.00 9 $594.00 Sample Shipping Large Cooler (2 day) $60.00 1 $60.00
TOTAL LAB $654.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 1 $32.50 Sub-Total $32.50
Groundwater Sampling Kit $208.55 day 2 $417.10 Poly Tubing (HDPE) $0.25 ft 310 $77.50 Silicon Tubing $2.00 ft 8 $16.00 Drum $58.20 drum 1 $58.20
Sub-Total $568.80
TOTAL EQUIPMENT $601.30
TA_010M.xlsx\sub 2 Page 1 11/8/202110:55 AM
COST PROPOSAL FOR TASK DC010M
< Former Touch of Class Cleaners - 489501391>
Groundwater Monitoring
1. INTRODUCTION:
In 2015 and 2016, GHD complete supplemental site assessment following the operation of a Soil Vapor Extraction System. The additional assessment identified groundwater impacts near the former drycleaner and on the adjacent Target property. At that time, annual groundwater monitoring was recommended. Task DC010M includes annual groundwater sampling and reporting in 2022. The previous groundwater monitoring report was submitted in March 2021 and FDEP provided approval on April 13, 2021.
Subtask 1: Project Management Includes all activities associated with project management for groundwater sampling and reporting at the Former Touch of Class Cleaners site.
Subtask 2: Groundwater Monitoring As recommended and approved by the Department following the previous sampling in February 2021, groundwater sampling is recommended at shallow wells (MW009, MW019, and MW022), intermediate depth monitor wells (MW021, MW024 and MW025), and deep wells (MW010 and MW026). Although monitor well MW027 was previously recommended for sampling, redevelopment of the adjacent property occurred and the well is presumed destroyed. Prior to sampling, depth to water measurements will be gathered from all available wells (20 total). Groundwater sampling will be conducted in general accordance with FDEP SOPs. All groundwater samples will be analyzed for the presence of VOHs at a Florida Certified laboratory.
Following receipt of analytical data, a summary report will be prepared. The summary report will include a detail of field activities along with a summary of laboratory analytical data. The monitoring report will also include recommendations regarding additional monitoring and/or remediation. Updated GIS tables will be prepared along with ADAPT Deliverables.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 3/31/22
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
March 16, 2020
Re: IP Cleaners - Miami, FL
Mr. Moore:
The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png
$95.00 per drum plus $150.00 stop charge Have a great day
Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.
P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com
From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami
Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks
Brian Moore, PE
GHD
Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect
WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION
mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
This e-mail has been scanned for viruses
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 11/8/21 Fri 11/19/21
2 Subtask 1: Project Management
94 days Mon 11/22/21 Thu 3/31/22
3 Subtask 2:
Groundwater Monitoring
87 days Wed 12/1/21 Thu 3/31/22
4 Site Access Coordinatio1 mon Wed 12/1/21 Tue 12/28/21
5 Field Work Preparation2 wks Thu 1/27/22 Wed 2/9/22
6 Groundwater Sampling1 day Thu 2/10/22 Thu 2/10/22
7 Groundwater Monitoring Report
6 wks Fri 2/18/22 Thu 3/31/22
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Nov 7, '21 Nov 14, '21 Nov 21, '21 Nov 28, '21 Dec 5, Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC010M at the Touch of Class Cleaners site located in Winter Park, Orange County
Project: TA_010M Date: Mon 11/8/21
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 11/8/21 Fri 11/19/21
2 Subtask 1: Project Management
94 days Mon 11/22/21 Thu 3/31/22
3 Subtask 2:
Groundwater Monitoring
87 days Wed 12/1/21 Thu 3/31/22
4 Site Access Coordinatio1 mon Wed 12/1/21 Tue 12/28/21
5 Field Work Preparation2 wks Thu 1/27/22 Wed 2/9/22
6 Groundwater Sampling1 day Thu 2/10/22 Thu 2/10/22
7 Groundwater Monitoring Report
6 wks Fri 2/18/22 Thu 3/31/22
Edwin Siersema
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T 5, '21 Dec 12, '21 Dec 19, '21 Dec 26, '21 Jan 2, '22
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC010M at the Touch of Class Cleaners site located in Winter Park, Orange County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 11/8/21 Fri 11/19/21
2 Subtask 1: Project Management
94 days Mon 11/22/21 Thu 3/31/22
3 Subtask 2:
Groundwater Monitoring
87 days Wed 12/1/21 Thu 3/31/22
4 Site Access Coordinatio1 mon Wed 12/1/21 Tue 12/28/21
5 Field Work Preparation2 wks Thu 1/27/22 Wed 2/9/22
6 Groundwater Sampling1 day Thu 2/10/22 Thu 2/10/22
7 Groundwater Monitoring Report
6 wks Fri 2/18/22 Thu 3/31/22
T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S Jan 9, '22 Jan 16, '22 Jan 23, '22 Jan 30, '22
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC010M at the Touch of Class Cleaners site located in Winter Park, Orange County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 11/8/21 Fri 11/19/21
2 Subtask 1: Project Management
94 days Mon 11/22/21 Thu 3/31/22
3 Subtask 2:
Groundwater Monitoring
87 days Wed 12/1/21 Thu 3/31/22
4 Site Access Coordinatio1 mon Wed 12/1/21 Tue 12/28/21
5 Field Work Preparation2 wks Thu 1/27/22 Wed 2/9/22
6 Groundwater Sampling1 day Thu 2/10/22 Thu 2/10/22
7 Groundwater Monitoring Report
6 wks Fri 2/18/22 Thu 3/31/22
Edwin Siersema
Derek Barry,Will Jahns
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 6, '22 Feb 13, '22 Feb 20, '22 Feb 27, '22 Ma
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC010M at the Touch of Class Cleaners site located in Winter Park, Orange County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 11/8/21 Fri 11/19/21
2 Subtask 1: Project Management
94 days Mon 11/22/21 Thu 3/31/22
3 Subtask 2:
Groundwater Monitoring
87 days Wed 12/1/21 Thu 3/31/22
4 Site Access Coordinatio1 mon Wed 12/1/21 Tue 12/28/21
5 Field Work Preparation2 wks Thu 1/27/22 Wed 2/9/22
6 Groundwater Sampling1 day Thu 2/10/22 Thu 2/10/22
7 Groundwater Monitoring Report
6 wks Fri 2/18/22 Thu 3/31/22 Brian Moo
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W ar 6, '22 Mar 13, '22 Mar 20, '22 Mar 27, '22 Apr 3, '22
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC010M at the Touch of Class Cleaners site located in Winter Park, Orange County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .