Task Assignment Summary
This is a Task Assignment Notification Form under DEP Contract No. HW555, issued by the Florida Department of Environmental Protection (FDEP). The contract is executed with GHD Services, Inc., a contractor represented by Brian Moore, with Kevin Kane serving as the DEP Contract Manager. The work is being performed at the Sta-Brite Cleaners facility located at 1155 Washington Boulevard North, Sarasota, Sarasota County, Florida, identified as DEP Site ERIC_5445.
The task assignment (DC013J) authorizes GHD Services, Inc. to conduct groundwater sampling and monitoring at the Sta-Brite Cleaners site in accordance with a May 2021 scope of work and cost proposal. The scope includes two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring, which encompasses sampling at four locations (one monitor well MW005 and three existing wells DW002, DW003, and DW004) with analysis for volatile organic halocarbons and total organic carbon. The work includes groundwater depth-to-water measurements, IDW disposal, and preparation of a Groundwater Monitoring Report. The final deliverable is due November 17, 2021, with overall task assignment completion by February 18, 2022. The total task assignment value is $3,631.76 on a fixed-price basis, with invoice submission permitted upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. The contract is structured as a fixed-price task assignment with no retainage applied.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 N/ADC013J
GHD Services, Inc.
Brian Moore
(850) 245-8971Kevin Kane
ERIC_5445
Sta-Brite Cleaners
1155 Washington Blvd N, Sarasota, Sarasota County
Monitoring
GHD Services, Inc. will conduct groundwater sampling in accordance with the May 2021 scope of work and cost proposal. Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
11/17/2021
02/18/2022
$ 3,631.76 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.14 14:27:58 -04'00'
Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.14 14:28:13 -04'00'
Aaron Cohen Digitally signed by Aaron Cohen Date: 2021.05.14 15:02:24 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2021.05.15 08:25:28 -04'00'
$ 3,631.76
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 11/17/2021
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 3,631.76
$ 3,631.76
HW555
DC013J
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW555 Contract File Sta-Brite Cleaners
ERIC_5445
Sarasota, Sarasota County
FROM: Kevin Kane, Contract Manager
DATE: May 14, 2021
SUBJECT: Task Assignment Summary
HW555 DC013J
Monitoring
This Task Assignment is for GHD to conduct groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at 4 locations. Samples will be analyzed for VOHs and TOC. IDW disposal is anticipated and is also covered under this subtask.
Following completion of field sampling, a Groundwater Monitoring Report will be prepared and submitted to FDEP. All groundwater sampling will be conducted in accordance with FDEP SOPs and groundwater depth to water measurements will be gathered prior to sampling at all available wells.
This work will be conducted in line with the scope of work included in the GHD proposal, received May 14, 2021.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is November 17, 2021 and the completion date for the Task Assignment is February 18, 2022.
The final cost total for Task Assignment DC013J is $3,631.76
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/14/21
Task #: DC013J SubTask 1 Project Management SubTask 6
Site: Stabrite Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 1.41 1.414 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$40.00 Professional Engineer/Geologist ES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$28.85 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician PM 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 3.25 3.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 27.66 1.414 26.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $887.07 $98.56 $788.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,002.39 $111.37 $891.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $248.38 $27.60 $220.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $226.20 $25.13 $201.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,364.04 $262.66 $2,101.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $44.36 $4.93 $39.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/14/21
Task #: DC013J SubTask 1 Project Management SubTask 6
Site: Stabrite Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $95.00 $95.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $95.00 $95.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $9.50 $9.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $104.50 $104.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $400.00 $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $460.00 $460.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $292.95 $292.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $325.45 $325.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,395.35 $267.59 $3,127.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $236.41 $26.27 $210.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $3,631.76 $293.86 $3,337.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Sta-brite Cleaners
PROJECT NUMBER: 090115
FDEP NO: 589600764 ERIC_5445
SUBTASK: Groundwater Monitoring
DATE: 5/14/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer BM Conclusions/Recommendation 1
Professional Geologist GE Order sample kit/prepare field scope of work 1 Professional Geologist GE Contact property owner 0.5 Professional Geologist GE Coordinate IDW disposal 1 Professional Geologist GE Verify COC/field notes following sampling 0.5 Professional Geologist GE Summarize previous assessment and remediation 1 Professional Geologist GE Groundwater Sampling Scope of Work and analysis 1 Professional Geologist GE Groundwater field sampling parameters 1 Professional Geologist GE Groundwater flow (one map) 1 Professional Geologist GE Groundwater analytical summary 1 Professional Geologist GE QA/QC 1 Professional Geologist GE Conculstion/Recommendations 1
Junior Technician SA Mob/Demob 3 Junior Technician SA Water Levels (all wells - 11 total) 1 Junior Technician SA Groundwater Sampling (4 wells) 6
CADD Design PM Prepare groundwater flow figure 1 CADD Design PM Prepare groundwater analytical figure 1
Staff Assistant SS Data Entry (11 water levels/5 monitor wells) 0.5 Staff Assistant SS Summary tables (gw elevation, quality, analytical) 0.75 Staff Assistant SS Publish report / generate pdf 2
3.25
TOTAL LABOR 26.25
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Gulf Coast IDW Disposal $95 drum 1 $95.00
TOTAL SUBS $95.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOCs EPA Method 8021 $100.00 4 $400.00 Sample Shipping Large Cooler - two day $60.00 1 $60.00
TOTAL LAB $460.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 1 $32.50 Sub-Total $32.50
Groundwater Sampling Kit $208.55 Day 1 $208.55 Poly Tubing/HDPE $0.25 ft 72 $18.00 Silicon Tubing 3/16 x 3/8 $2.05 ft 4 $8.20 Drum $58.20 drum 1 $58.20
Sub-Total $292.95
TOTAL EQUIPMENT $325.45
TA_013J\sub 2 Page 3 5/14/20212:21 PM
COST PROPOSAL FOR TASK DC013J
Stabrite Cleaners, 589600764
Groundwater Monitoring
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
A dual-phase remedial system was operated at the subject site in order to remediate chlorinated solvent impacts present beneath the subject facility within soil and groundwater.
Based on the presence of residual PCE and PCE breakdown products in the former source area, GHD recommended the completion of pilot study activities that were implemented and included both bioremediation and bioaugmentation.
GHD implemented additional biostimulation using EOS as recommended in the approved RAP Modification and conducted baseline sampling at three wells including MW003, MW004, and MW005. Six groundwater monitoring events followed the implementation of the biostimulation injections and indicated a decrease in the presence of PCE and PCE breakdown products. GHD recommended and FDEP approved continued Groundwater Monitoring at the site.
Subtask 1: Project Management Includes all activities associated with groundwater sampling and report preparation.
Subtask 2: Groundwater Monitoring Task assignment DC013J includes groundwater sampling at one (1) monitor well (MW005) and three (3) existing MPE wells DW002, DW003, and DW004. Groundwater analysis will include volatile organic halocarbons and Total Organic Carbon (TOC). All sampling will be in accordance with the approved RAP Modification and FDEP SOPs. Although monitoring well MW009 was recommended for sampling in Bill Linn’s comments dated August 7, 2015, the well was not located during the previous sampling events. Further, the area of the monitor well is covered with new asphalt. All groundwater sampling will be conducted in accordance with FDEP SOPs and groundwater depth to water measurements will be gathered prior to sampling at all available wells.
Following groundwater sampling and receipt of analytical data, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
Groundwater Monitoring Report 11/17/21
Gulf Coast Vacuum Truck Services 1744 Williams Ditch Rd
Cantonment, FL 32533 US
+1 8504500058 accounting@gcvts.net
Estimate
ADDRESS
GHD
ESTIMATE 1040
DATE 04/15/2021
DATE SERVICE DESCRIPTION QTY RATE AMOUNT
Drum Disposal Disposal of of 1 drum of contaminated water.
1 95.00 95.00
Island Cleaners - Sanibel TOTAL $95.00
Accepted By
Accepted Date
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
April 15, 2021
Re: Non-Hazardous Drum Disposal Quote – South and Central Florida
Mr. Moore:
The price for disposal of drums of non-hazardous soil or groundwater located in south and central
Florida will be $100.00 per drum, total, for both transportation and disposal.
Pricing for the Florida Keys will be quoted separately on a case-by-case basis.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/14/21 Thu 5/27/21
2 Subtask 1: Project Management
124 days Fri 5/28/21 Wed 11/17/21
3 Subtask 2: Groundwater Monitoring
56 days Wed 9/1/21 Wed 11/17/21
4 Field Work Preparation 2 wks Wed 9/1/21 Tue 9/14/21
5 Groundwater Sampling 1 day Mon 9/27/21Mon 9/27/21
6 Groundwater Monitoring Report
6 wks Thu 10/7/21 Wed 11/17/21
5/2 5/9 5/16 5/23 5/30 May June
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Stabrite Cleaners facility located in Sarasota, Sarasota County
Project: TA_013J Date: Thu 5/13/21
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/14/21 Thu 5/27/21
2 Subtask 1: Project Management
124 days Fri 5/28/21 Wed 11/17/21
3 Subtask 2: Groundwater Monitoring
56 days Wed 9/1/21 Wed 11/17/21
4 Field Work Preparation 2 wks Wed 9/1/21 Tue 9/14/21
5 Groundwater Sampling 1 day Mon 9/27/21Mon 9/27/21
6 Groundwater Monitoring Report
6 wks Thu 10/7/21 Wed 11/17/21
6/6 6/13 6/20 6/27 7/4 July
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Stabrite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/14/21 Thu 5/27/21
2 Subtask 1: Project Management
124 days Fri 5/28/21 Wed 11/17/21
3 Subtask 2: Groundwater Monitoring
56 days Wed 9/1/21 Wed 11/17/21
4 Field Work Preparation 2 wks Wed 9/1/21 Tue 9/14/21
5 Groundwater Sampling 1 day Mon 9/27/21Mon 9/27/21
6 Groundwater Monitoring Report
6 wks Thu 10/7/21 Wed 11/17/21
7/11 7/18 7/25 8/1 8/8 August
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Stabrite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/14/21 Thu 5/27/21
2 Subtask 1: Project Management
124 days Fri 5/28/21 Wed 11/17/21
3 Subtask 2: Groundwater Monitoring
56 days Wed 9/1/21 Wed 11/17/21
4 Field Work Preparation 2 wks Wed 9/1/21 Tue 9/14/21
5 Groundwater Sampling 1 day Mon 9/27/21Mon 9/27/21
6 Groundwater Monitoring Report
6 wks Thu 10/7/21 Wed 11/17/21
Gabrie
8/15 8/22 8/29 9/5 9/12 September
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Stabrite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/14/21 Thu 5/27/21
2 Subtask 1: Project Management
124 days Fri 5/28/21 Wed 11/17/21
3 Subtask 2: Groundwater Monitoring
56 days Wed 9/1/21 Wed 11/17/21
4 Field Work Preparation 2 wks Wed 9/1/21 Tue 9/14/21
5 Groundwater Sampling 1 day Mon 9/27/21Mon 9/27/21
6 Groundwater Monitoring Report
6 wks Thu 10/7/21 Wed 11/17/21 elle Enos
Skylar Albritton
9/19 9/26 10/3 10/10 10/17 October
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Stabrite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/14/21 Thu 5/27/21
2 Subtask 1: Project Management
124 days Fri 5/28/21 Wed 11/17/21
3 Subtask 2: Groundwater Monitoring
56 days Wed 9/1/21 Wed 11/17/21
4 Field Work Preparation 2 wks Wed 9/1/21 Tue 9/14/21
5 Groundwater Sampling 1 day Mon 9/27/21Mon 9/27/21
6 Groundwater Monitoring Report
6 wks Thu 10/7/21 Wed 11/17/21 Brian Moore,Gabr
10/24 10/31 11/7 11/14 11/21 November
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Stabrite Cleaners facility located in Sarasota, Sarasota County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .