CN-370000-HW555-DC034P.pdf
PDF 902 KB Posted
- Contract number
- HW555
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) contract HW555, executed on March 19, 2020. The contract is between FDEP and GHD Services, Inc., with Billy Hessman serving as the DEP Contract Manager and Brian Moore as the Contractor Representative. The work is located at Michael the Cleaner site (FDEP Site ERIC_5434) at 1760 Main Street, Sarasota, Sarasota County, Florida, and is designated as an Assessment phase project under Task Assignment DC034P, Module D000.
GHD Services, Inc. will conduct soil and soil gas sampling in accordance with a March 2020 scope of work and cost proposal, with deliverables including a Supplemental Site Assessment Report due June 25, 2020. The task is structured as a Fixed Price agreement with a total not-to-exceed amount of $11,214.13, with no retainage. Work includes two subtasks: Project Management and Soil Assessment, encompassing eight soil borings near suspected underground storage tanks (USTs), installation of five MAGS (Multi-level Analyzer for Gases) piezometers, soil and soil gas sampling with laboratory analysis for volatile organic compounds and polycyclic aromatic hydrocarbons, and report preparation. The period of performance extends from the task assignment execution through October 30, 2020, with invoice submission authorized upon completion of site assessment activities and FDEP approval of the final report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 NADC034P
GHD Services, Inc.
Brian Moore
850-245-8972Billy Hessman
ERIC_5434
Michael the Cleaner
1760 Main Street, Sarasota, Sarasota County
Assessment
GHD Services, Inc. will conduct soil and soil gas sampling in accordance with the March 2020 scope of work and cost proposal. A Supplemental Site Assessment Report will be generated.
Supplemental Site Assessment Report
06/25/2020
10/30/2020
$ 11,214.13 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.19 14:20:07 -04'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.19 14:20:22 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.03.19 14:58:04 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2020.03.20 09:08:25 -04'00'
$ 11,214.13
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Supplemental Site Assessment Report 06/25/2020
Upon completion of site assessment activities and FDEP approval of the Supplemental Site Assessment Report $ 11,214.13
$ 11,214.13
HW555
DC034P
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
To:
From:
Date:
HW555 Contract File Michael the Cleaner
ERIC_5434
Tampa, Hillsborough County
Billy Hessman, Project Manager
March 19, 2020
Subject: Negotiation Summary
HW555 DC034P
Assessment
GHD Services, Inc. will conduct soil and soil gas sampling. Specific subtasks are detailed below.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtasks 2: Soil Assessment Subtask 2 includes costs associated with soil and soil gas assessment in the vicinity of suspected USTs. A total of eight borings will be advanced at the FDEP approved locations. Upon completion of soil and MAGS sampling, a Supplemental Site Assessment Report will be generated and submitted to the Department.
This work will be conducted in accordance with the scope of work included in the GHD proposal, received March 19, 2020.
The final cost total for Task Assignment DC034P is $11,214.13.
FDEP COST ESTI MATEContractor: GHD Services Inc.
Date: 03/19/20
Task #: DC034P SubTask 1 Project Management SubTask 6
Site: Michael the Cleaner SubTask 2 Soil Assessment SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 2.64 2.642 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$47.12 Professional Engineer/Geologist ES 10.50 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$22.76 Senior Technician WM 19.00 19.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 19.00 19.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician SM 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 3.50 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 58.64 2.642 56.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,657.83 $184.20 $1,473.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,873.35 $208.15 $1,665.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $464.20 $51.58 $412.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $422.75 $46.97 $375.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,418.13 $490.90 $3,927.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $82.89 $9.21 $73.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTI MATEContractor: GHD Services Inc.
Date: 03/19/20
Task #: DC034P SubTask 1 Project Management SubTask 6
Site: Michael the Cleaner SubTask 2 Soil Assessment SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $314.00 $314.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $508.00 $508.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $4,656.00 $4,656.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $208.00 $208.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,864.00 $4,864.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $834.30 $834.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $899.30 $899.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $10,772.32 $500.11 $10,272.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $441.81 $49.09 $392.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $11,214.13 $549.20 $10,664.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Michael the Cleaners
PROJECT NUMBER: 096207
FDEP NO: ERIC_5434
SUBTASK: Soil Assessment
DATE: 3/19/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer BM Conclusions/Recommendations 1
Professional Geologist ES Specify laboratory data deliverable/Sample Kit 1 Professional Geologist ES Field sampling SOW/coordinate site access 1 Professional Geologist ES QA/QC field and laboratory data 1 Professional Geologist ES Project Background 1 Professional Geologist ES Summarize Soil Boring Advancement 1 Professional Geologist ES Summarize Soil Analytical Results 2 Professional Geologist ES Summarize MAGS 1 Professional Geologist ES QA/QC Laboratory Data 1.5 Professional Geologist ES Conclusions/Recommendations 1
10.5
Senior Technician WM Mob/demob 3 Senior Technician WM Advance Soil Boring (6 total) 6 Senior Technician WM Install 5 MAGS Wells 5 Senior Technician WM Conduct MAGS 5
Junior Techncian SA Mob/demob 3 Junior Techncian SA Advance Soil Boring (6 total) 6 Junior Techncian SA Install 5 MAGS Wells 5 Junior Techncian SA Conduct MAGS 5
Drafting Technician SM Update site plan with boring/mags locations 1 Drafting Technician SM Depict soil and mags data 2
Staff Assistant ET Data Entry (8 soil borings/5 MAGS) 1.5 Staff Assistant ET Document Preparation/Publishing 2
3.5
TOTAL LABOR 56
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 2 $194.00
TOTAL VEHICLE $194.00
PER DIEM TYPE RATE UNIT USEAGE Miles Free
Hotel $85.00 day 2 $170.00 Per Diem $36.00 day 4 $144.00
TOTAL VEHICLE $314.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOCs (soil) EPA 8260 $66.00 16 $1,056.00 PAHs (soil) EPA 8270 SIM $100.00 16 $1,600.00
VOCs (soil gas) TO-15 $200.00 5 $1,000.00 Petroleum (soil gas) EPA-18 (APH) $200.00 5 $1,000.00
Sample Shipping Large Cooler (overnight) $104.00 2 $208.00
TOTAL LAB $4,864.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 2 $65.00 Sub-Total $65.00
Air Sampling Pump $25.25 Day 1 $25.25 Regenerative Blower $92.15 Day 1 $92.15 Portable generator $66.00 Day 1 $66.00 Vacuum Gages $19.40 Day 1 $19.40 Tedlar Bags $14.55 Each 5 $72.75 Well Screen (5 feet, 2-inch, 0.010-slot) $18.95 each 5 $94.75 Well Point (2-inch) $5.45 each 5 $27.25 Boltdown Manhole (6") $24.30 Each 5 $121.50 Soil sampling kit (through concrete) $208.55 Day 1 $208.55 PID/FID $106.70 Day 1 $106.70
Sub-Total $834.30
TOTAL EQUIPMENT $899.30
Copy of TA_034P (002).xlsx\sub 2 Page 3 3/19/20202:18 PM
COST PROPOSAL FOR TASK DC034P
<Michael The Cleaners/FDEP #58-9502384>
< Soil Assessment>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD is currently conducting Soil Vapor Extraction (SVE) operations in order to mitigate shallow soil impacts. During the initial assessment of the site, a Ground Penetrating Radar (GPR) survey was conducted in the northern portion of the site that identified potential underground storage tanks (USTs). Task assignment DC034P includes completion of soil borings and MAGS in the vicinity of the suspected USTs.
Subtask 1: Project Management Subtask 1 includes all activities associated with project management of soil sampling and MAGS activities near the suspected USTs at the site.
Subtask 2: Soil Sampling and MAGS Subtask 2 includes the advancement of eight (8) soil borings near the suspected UST locations (see attached sampling plan). The soil borings will be advanced with a hand auger following concrete coring. Soil samples will be gathered at 1 foot intervals to the water table (approximately 4 ft bls). Soil samples will be screened in the field with a PID and representative soil samples from 0-2 and 2-4 ft bls will be collected and submitted for laboratory confirmation analysis. The soil samples will be analyzed for the presence of volatile organic compounds (EPA Method 8260) and polycyclic aromatic hydrocarbons (PAHs) by EPA Method 8270.
Following soil sampling MAGS piezometers will be installed at 5 of the 8 proposed locations (see attached sampling plan). The MAGS points will be installed to depths of 3-3.5 ft bls and will be constructed with 2.5-3 ft of 2-inch diameter PVC well screens and casing blank. The MAGS piezometers will be finished inside 6-inch diameter bolt-down manholes.
Following installation, MAGS will be conducted through the use of a regenerative blower. The blower will be operated for approximately 30 minutes at each location and flow and vacuum measurements will be recorded. At the conclusion of MAGS, soil vapor samples will be collected at each location. The samples will be submitted for volatile organics analysis by Method TO-15 and air phase hydrocarbon (APH) fractions.
Upon receipt of the soil and MAGS data, the results will be summarized and submitted to the FDEP along with field notes and laboratory analytical data. The information will be provided as a Supplemental Site Assessment Report.
Deliverables:
Deliverable Deliverable Due Date
Supplemental Site Assessment Report 6/25/20
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
M T W T F S S M T W T F 5, '20 Mar 22, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Project: TA_034P Date: Tue 3/17/20
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
S S M T W T F S S M T W Mar 29, '20 Apr 5, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
T F S S M T W T F S S M Apr 12, '20 Apr 19, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
Ed Siersema
William McKinn
William M
T W T F S S M T W T F S Apr 26, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20 ney,Skylar Albritton
McKinney,Skylar Albritton
S M T W T F S S M T W T May 3, '20 May 10, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
Ed Siersema
F S S M T W T F S S M T May 17, '20 May 24, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
W T F S S M T W T F S S May 31, '20 Jun 7, '
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20
M T W T F S S M T W T F 20 Jun 14, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 3/17/20 Mon 4/6/20
2 Subtask 1: Project Management
58 days Tue 4/7/20 Thu 6/25/20
3 Subtask 2: Soil Assessme58 days Tue 4/7/20 Thu 6/25/20
4 Field Work Preparation3 wks Tue 4/7/20 Mon 4/27/20
5 Soil Borings 1 day Wed 4/29/20 Wed 4/29/20
6 MAGS 1 day Thu 4/30/20 Thu 4/30/20
7 Data Evaluation 2 wks Fri 5/8/20 Thu 5/21/20
8 Supplemental Site Assessment Report
6 wks Fri 5/15/20 Thu 6/25/20 Brian Moore,Ed Siersema,Saman
S S M T W T F S S M T W Jun 21, '20 Jun 28, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC034P at the Michael the Cleaner site located in Sarasota, Sarasota County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Copy of TA_034P (002).pdf |
| Cost Estimate |
| sub 2 |
File details come from the government source that posted it. Updated .