CN-370000-HW555-DC019L.pdf

PDF 654 KB Posted

Attached to
Master Agreement FL|HW555|3626b1bfe23ad9cb6d0c11811d472cb2
Contract number
HW555
Issued by
Florida

About this file

This is a Task Assignment Notification Form for a Florida Department of Environmental Protection (FDEP) contract (HW555) with GHD Services, Inc. The task assignment (DC019L) pertains to remedial action and operation and maintenance activities at McNatt's Cleaners, a dry cleaning facility located at 6210 North Florida Avenue, Tampa, Hillsborough County, Florida (FDEP Site #ERIC_4716). The contract is managed by Kevin Kane as the FDEP Contract Manager, with Brian Moore serving as the contractor representative for GHD Services, Inc.

The task assignment requires GHD Services, Inc. to conduct six months of operation and maintenance (O&M) of an existing Soil Vapor Extraction (SVE) system and quarterly groundwater sampling from June 4, 2021, through April 29, 2022. The work consists of three subtasks: (1) Project Management, (2) Semi-Annual O&M including quarterly site visits and groundwater sampling for volatile organic halocarbons, total recoverable petroleum hydrocarbons, total organic carbon, ammonia, and dissolved gases, and (3) Utilities for six months of SVE system operation. The total task assignment value is $13,884.64, comprised of a Fixed Price component of $9,684.64 (Subtasks 1 and 2) and a Cost Plus Fixed Fee component of $4,320.00 (Subtask 3, consisting of $4,200.00 in utilities cost reimbursement and a $120.00 handling fee). Key deliverables include quarterly field notes and analytical data (due 7/26/21), an Annual Remedial Action Status Report (due 12/2/21), and paid utility invoices (due 1/28/22). No retainage is specified, and the task assignment was executed on June 1, 2021.

View the file

Other files

File Type Posted
CN-370000-HW555-CO2.pdf PDF
CN-370000-HW555-DC002L.pdf PDF
CN-370000-HW555-DC004G.pdf PDF
CN-370000-HW555-DC010H.pdf PDF
CN-370000-HW555-DC010J.pdf PDF
CN-370000-HW555-DC010M.pdf PDF
CN-370000-HW555-DC013J.pdf PDF
CN-370000-HW555-DC014I.pdf PDF
CN-370000-HW555-DC015B.pdf PDF
CN-370000-HW555-DC019A.pdf PDF
CN-370000-HW555-DC01ACO3.pdf PDF
CN-370000-HW555-DC020M.pdf PDF
CN-370000-HW555-DC027H.pdf PDF
CN-370000-HW555-DC02BCO1.pdf PDF
CN-370000-HW555-DC02BCO2.pdf PDF
CN-370000-HW555-DC02HCO3.pdf PDF
CN-370000-HW555-DC02HCO5.pdf PDF
CN-370000-HW555-DC02ICO2.pdf PDF
CN-370000-HW555-DC02N.pdf PDF
CN-370000-HW555-DC031H.pdf PDF
CN-370000-HW555-DC034E.pdf PDF
CN-370000-HW555-DC034I.pdf PDF
CN-370000-HW555-DC035D.pdf PDF
CN-370000-HW555-DC035K.pdf PDF
CN-370000-HW555-DC039C.pdf PDF
CN-370000-HW555-DC039F.pdf PDF
CN-370000-HW555-DC03E.pdf PDF
CN-370000-HW555-DC03F.pdf PDF
CN-370000-HW555-DC03G.pdf PDF
CN-370000-HW555-DC040H.pdf PDF
CN-370000-HW555-DC041B.pdf PDF
CN-370000-HW555-DC043C.pdf PDF
CN-370000-HW555-DC045G.pdf PDF
CN-370000-HW555-DC049G.pdf PDF
CN-370000-HW555-DC049H.pdf PDF
CN-370000-HW555-DC051A.pdf PDF
CN-370000-HW555-DC052G.pdf PDF
CN-370000-HW555-DC063E.pdf PDF
CN-370000-HW555-DC07D.pdf PDF
CN-370000-HW555-DC09HCO6.pdf PDF
CN-370000-HW555-DC09K.pdf PDF
CN-370000-HW555-DC09M.pdf PDF
CN-370000-HW555-DC10FCO2.pdf PDF
CN-370000-HW555-DC10I.pdf PDF
CN-370000-HW555-DC11DCO1.pdf PDF
CN-370000-HW555-DC11DCO2.pdf PDF
CN-370000-HW555-DC11E.pdf PDF
CN-370000-HW555-DC11F.pdf PDF
CN-370000-HW555-DC12B.pdf PDF
CN-370000-HW555-DC12BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 N/ADC019L

GHD Services, Inc.

Brian Moore

(850) 245-8971Kevin Kane

ERIC_4716

McNatt's Cleaners

6210 North Florida Avenue, Tampa, Hillsborough County

Operation and Maintenance (O&M)

GHD Services, Inc. will conduct 6 months of O&M and quarterly groundwater sampling in accordance with the May 2021 scope of work and cost proposal.

The payment of utility invoices associated with O&M activities under this Task Assignment is the only portion of this Task Assignment which is Cost Plus.

Paid Utility Invoices

01/28/2022

04/29/2022

$ 9,684.64 $ 0.00 $ 4,200.00 $ 0.00

$ 0.00

Kevin Kane Digitally signed by Kevin Kane Date: 2021.06.01 14:41:49 -04'00'

Kevin Kane Digitally signed by Kevin Kane Date: 2021.06.01 14:42:12 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.06.02 07:22:44 -04'00'

Brian Moore Digitally signed by Brian Moore Date: 2021.06.02 08:30:23 -04'00'

$ 13,884.64

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Remedial Action Status Report 12/02/2021

Paid Utility Invoices 01/28/2022

Upon completion of 6 months O&M activities and FDEP approval of Remedial Action Status Report - Subtasks 1+2 $ 9,564.64

Upon FDEP Approval of Paid Utility Invoices:

Utilities (Cost Plus Fixed Fee) not to exceed $4,200 Utilities Handling Fee: $120 - Subtask 3

$ 4,320.00

$ 13,884.64

HW555

DC019L

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW555 Contract File

McNatt’s Cleaners

ERIC_4716

Tampa, Hillsborough County

FROM: Kevin Kane, Contract Manager

DATE: June 1, 2021

SUBJECT: Task Assignment Summary

HW555 DC019L

Operation and Maintenance

GHD Services, Inc. (GHD) will conduct 6 months O&M of the existing Soil Vapor Extraction (SVE) system and groundwater sampling. Due to elevated methane levels, continuous operation of the existing SVE system is required. Specific subtasks are detailed below:

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtasks 2: Six Months O&M GHD personnel will conduct quarterly site visits to perform routine SVE system O&M activities to verify system operation, record operational data including meter and gauge readings, and adjust flow and vacuum/pressure settings to maximize methane mitigation. GHD personnel will conduct OVA readings and vapor influent sampling quarterly. In addition, quarterly groundwater sampling for volatile organic halocarbons (VOHs), total recoverable petroleum hydrocarbons (TRPH), total organic carbon (TOC), ammonia, and dissolved gases will be conducted.

Upon completion of the first quarterly sampling event, a quarter 1 Electronic O&M Summary will be submitted to the Department. The Electronic O&M Summary will include analytical data, field notes, and updated figures. Upon completion of the second quarterly sampling event, a Remedial Action Status Report will be generated and submitted to the Department. The report will also include field notes, analytical data, and recommendations for future site rehabilitation.

Subtask 3: Utilities (6 months) Estimated utility costs for six months of SVE system operation are $4,200.00 for electricity. Cost for utility bill handling are $120.00 ($20.00 per month).

This work will be conducted in line with the scope of work included in the GHD proposal, received May 28, 2021.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is January 28, 2022, and the completion date for the Task Assignment is April 29, 2022.

The final cost total for Task Assignment DC019L is $13,884.64.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 06/01/21

Task #: DC019L SubTask 1 Project Management SubTask 6

Site: McNatts Cleaners SubTask 2 Semi-Annual O&M SubTask 7

Activity/Phase: O&M SubTask 3 Utilities SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 2.89 2.891 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$44.21 Professional Engineer/Geologist JH 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$21.14 Junior Technician BJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 22.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.16 Junior Technician WJ 7.75 7.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 61.64 2.891 58.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,813.49 $201.50 $1,611.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $2,049.25 $227.70 $1,821.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $507.78 $56.42 $451.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $462.44 $51.38 $411.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,832.96 $537.00 $4,295.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $90.68 $10.08 $80.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 06/01/21

Task #: DC019L SubTask 1 Project Management SubTask 6

Site: McNatts Cleaners SubTask 2 Semi-Annual O&M SubTask 7

Activity/Phase: O&M SubTask 3 Utilities SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $4,200.00 $0.00 $4,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $4,200.00 $0.00 $4,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $120.00 $0.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,320.00 $0.00 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,882.00 $2,882.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $208.00 $208.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,090.00 $3,090.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $808.70 $808.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $873.70 $873.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $13,401.34 $547.08 $8,534.26 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $483.30 $53.70 $429.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $13,884.64 $600.78 $8,963.86 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : McNatts Cleaners

PROJECT NUMBER: 090128

FDEP NO: ERIC_4716

SUBTASK: Semi-Annual O&M

DATE: 6/1/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer BM Conclusions Recommendations 2

Professional Engineer JH Prepare field scope of work and order sample kit (2 quarters) 1 Professional Engineer JH Review field package and coc (2 quarters) 1 Professional Engineer JH Summarize field parameters and procedures for 2 sampling events 2 Professional Engineer JH Groundwater flow evaluation (shallow/deep) 2 Professional Engineer JH Groundwater Analytical results (VOHs - 1 event) 3 Professional Engineer JH Groundwater Analytical results (performance and UIC) 4 Professional Engineer JH QA/QC 2 Professional Engineer JH Conclusions/Recommendations 1

Junior Technician SA Mob/Demob (quarterly and annual sampling) 1.5 Junior Technician SA O&M for SVE System (2 quarters) 6 Junior Technician SA Groundwater Sampling (quarterly - 5 wells) 7.5 Junior Technician SA Water Levels (all wells - 32 total) 2.5 Junior Technician SA Groundwater Sampling (3 wells) 4.5

Junior Technician WJ Mob/Demob 0.75 Junior Technician WJ Water Levels (all wells - 32 total) 2.5 Junior Technician WJ Groundwater Sampling (3 wells) 4.5

7.75

CADD Design PM Groundwater Flow Maps (shallow and deep) 2.5 CADD Design PM Groundwater Analytical Results (1 event VOCs) 1.5

Staff Assistants SS Input field data (11 gw samples total) 1.5 Staff Assistants SS Update summary tables (parameters, water level, analytical) 2 Staff Assistants SS Prepare RASR (pdf and hard copy) 2 Staff Assistants SS Update GIS/ADaPT 1.5

TOTAL LABOR 58.75

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 2 $194.00

TOTAL VEHICLE $194.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 6 $396.00

TRPH FL-PRO $84.00 10 $840.00

Ammonia SM4500 $21.00 10 $210.00 Dissolved gases RSK 175 $160.00 6 2 $1,280.00

TOC 9060 $26.00 6 $156.00

Sample Shipping Large cooler (overnight) $104.00 2 $208.00

TOTAL LAB $3,090.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 2 $65.00 Sub-Total $65.00

Groundwater Sampling Kit $208.55 day 3 $625.65 Poly Tubing (HDPE) $0.25 ft 349 $87.25 Silicon Tubing $2.00 ft 11 $22.00 vacuum gauges $19.40 day 2 $38.80 anemometer $17.50 day 2 $35.00

Sub-Total $808.70

TOTAL EQUIPMENT $873.70

TA_019L.xlsx\sub 2 Page 3 6/1/202111:53 AM

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 3

SITE : McNatts Cleaners

PROJECT NUMBER: 090128

FDEP NO: ERIC_4716

SUBTASK: Utilities

DATE: 6/1/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

TRAVEL TYPE RATE UNIT USEAGE Miles Free

TOTAL VEHICLE $0.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TECO Power $700 Month 6 $4,200.00 Handling Fee $20 Month 6 $120.00

TOTAL SUBS $4,320.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Sub-Total $0.00

Sub-Total $0.00

TOTAL EQUIPMENT $0.00

TA_019L.xlsx\sub 3 Page 4 6/1/202111:53 AM

COST PROPOSAL FOR TASK DC019L

McNatt’s Cleaners, 299501069

6 Months O&M

1. INTRODUCTION:

GHD submitted a Remedial Action Plan (RAP) Modification in March 2017 that was approved by the Department. Based on the results of recent performance monitoring, it appeared that carbon and nutrient limitations again existed in the subsurface that were inhibiting further reductive dechlorination processes. As recommended and approved by FDEP, GHD completed an additional remedial injection event consistent with the RAP Modification in late January 2021 (Task DC019K). Task DC019L includes 6 additional months of SVE system operation (to mitigate methane accumulation) and quarterly groundwater monitoring (to evaluate remedial performance).

Subtask 1-Project Management Includes all tasks associated with project management for the continued SVE system operations and quarterly groundwater monitoring.

Subtask 2 – Semi-Annual monitoring During semi-annual monitoring, SVE system performance will be verified during quarterly site visits. Specifically, GHD personnel will verify system operations and collect vacuum and flow data for the overall system and at each individual well leg. No soil vapor sampling has been recommended as part of the semi-annual monitoring.

Groundwater monitoring will be conducted Quarterly in order to evaluate UIC, dissolved gas, and total organic carbon concentration trends. Sampling will be conducted in accordance with FDEP SOPs. Monitor wells MW001, MW009, MW020, MW021, and MW029 will be sampled and analyzed for total recoverable petroleum hydrocarbons (TRPH), ammonia, TOC, and the dissolved gases ethane, ethene, and methane. Dissolved gas analysis is recommended in order to evaluate the potential for methane gas accumulation beneath and in the vicinity of the subject drycleaner. Quality Control samples will be collected for the dissolved gas analysis and will include an equipment blank and a blind field duplicate. During the second quarterly groundwater sampling event, groundwater samples will be collected from the wells referenced above along with MW005 for volatile organic halocarbon analysis.

Following receipt of analytical data, a Remedial Action Status Report will be prepared. The Report will include a summary of analytical data for the 2 quarters of monitoring and recommendations for additional monitoring and/or SVE operations.

Subtask 3 – Six months of utilities (July 2021 through December 2021) In accordance with the approved RAP Modification, GHD will continue SVE operations during quarterly monitoring in order to mitigate the potential for methane accumulation. The SVE system will operate with all wells open and the system will be checked during periodic monitoring visits. Costs associated with 6 months of utilities are included in Subtask 5. The necessity for continued SVE operation will be evaluated following collection of dissolved gas samples each quarter.

Deliverables:

Deliverable Deliverable Due Date

Quarter 1 field notes and analytical data 7/26/21

Annual Remedial Action Status Report, field notes, analytical data 12/2/21

Paid Utility Receipts (July 2021 through December 2021), includes cost reimbursement of $4,200 and handling fee of $120 1/28/22

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 1 wk Fri 5/28/21 Thu 6/3/21

2 Subtask 1: Project Manageme130 days Fri 6/4/21 Thu 12/2/21

3 Subtask 2: Semi‐Annual O&M130 days Fri 6/4/21 Thu 12/2/21

4 Field Work Preparation 2 wks Mon 6/28/21 Fri 7/9/21

5 O&M and GW Sampling 1 day Mon 7/12/21 Mon 7/12/21

6 Field Work Preparation 2 wks Fri 10/1/21 Thu 10/14/21

7 O&M and GW Sampling 1 day Thu 10/14/21 Thu 10/14/21

8 Remedial Action Status Repo6 wks Fri 10/22/21 Thu 12/2/21

9 Subtask 3: Utilities (6 month6.5 mons Fri 6/4/21 Thu 12/2/21

5/16 5/23 5/30 6/6 6/13 6/20 June

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC019L at the McNatts Cleaners facility located in Tampa, Hillsborough County

Project: TA_019L Date: Fri 5/28/21

Task Name Duration Start Finish

1 LOE Submittal/Approval 1 wk Fri 5/28/21 Thu 6/3/21

2 Subtask 1: Project Manageme130 days Fri 6/4/21 Thu 12/2/21

3 Subtask 2: Semi‐Annual O&M130 days Fri 6/4/21 Thu 12/2/21

4 Field Work Preparation 2 wks Mon 6/28/21 Fri 7/9/21

5 O&M and GW Sampling 1 day Mon 7/12/21 Mon 7/12/21

6 Field Work Preparation 2 wks Fri 10/1/21 Thu 10/14/21

7 O&M and GW Sampling 1 day Thu 10/14/21 Thu 10/14/21

8 Remedial Action Status Repo6 wks Fri 10/22/21 Thu 12/2/21

9 Subtask 3: Utilities (6 month6.5 mons Fri 6/4/21 Thu 12/2/21

Jeremy Hess

Skylar Albritton

6/27 7/4 7/11 7/18 7/25 8/1 July August

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC019L at the McNatts Cleaners facility located in Tampa, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 1 wk Fri 5/28/21 Thu 6/3/21

2 Subtask 1: Project Manageme130 days Fri 6/4/21 Thu 12/2/21

3 Subtask 2: Semi‐Annual O&M130 days Fri 6/4/21 Thu 12/2/21

4 Field Work Preparation 2 wks Mon 6/28/21 Fri 7/9/21

5 O&M and GW Sampling 1 day Mon 7/12/21 Mon 7/12/21

6 Field Work Preparation 2 wks Fri 10/1/21 Thu 10/14/21

7 O&M and GW Sampling 1 day Thu 10/14/21 Thu 10/14/21

8 Remedial Action Status Repo6 wks Fri 10/22/21 Thu 12/2/21

9 Subtask 3: Utilities (6 month6.5 mons Fri 6/4/21 Thu 12/2/21

8/8 8/15 8/22 8/29 9/5 9/12 September

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC019L at the McNatts Cleaners facility located in Tampa, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 1 wk Fri 5/28/21 Thu 6/3/21

2 Subtask 1: Project Manageme130 days Fri 6/4/21 Thu 12/2/21

3 Subtask 2: Semi‐Annual O&M130 days Fri 6/4/21 Thu 12/2/21

4 Field Work Preparation 2 wks Mon 6/28/21 Fri 7/9/21

5 O&M and GW Sampling 1 day Mon 7/12/21 Mon 7/12/21

6 Field Work Preparation 2 wks Fri 10/1/21 Thu 10/14/21

7 O&M and GW Sampling 1 day Thu 10/14/21 Thu 10/14/21

8 Remedial Action Status Repo6 wks Fri 10/22/21 Thu 12/2/21

9 Subtask 3: Utilities (6 month6.5 mons Fri 6/4/21 Thu 12/2/21

Jeremy Hess

Skylar Albritton,Will Jah

9/19 9/26 10/3 10/10 10/17 10/24 1 October N

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC019L at the McNatts Cleaners facility located in Tampa, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 1 wk Fri 5/28/21 Thu 6/3/21

2 Subtask 1: Project Manageme130 days Fri 6/4/21 Thu 12/2/21

3 Subtask 2: Semi‐Annual O&M130 days Fri 6/4/21 Thu 12/2/21

4 Field Work Preparation 2 wks Mon 6/28/21 Fri 7/9/21

5 O&M and GW Sampling 1 day Mon 7/12/21 Mon 7/12/21

6 Field Work Preparation 2 wks Fri 10/1/21 Thu 10/14/21

7 O&M and GW Sampling 1 day Thu 10/14/21 Thu 10/14/21

8 Remedial Action Status Repo6 wks Fri 10/22/21 Thu 12/2/21

9 Subtask 3: Utilities (6 month6.5 mons Fri 6/4/21 Thu 12/2/21

Jahns

Brian Moore,J

10/31 11/7 11/14 11/21 11/28 12/5 1 November December

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC019L at the McNatts Cleaners facility located in Tampa, Hillsborough County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .