CN-370000-HW555-DC009o.pdf
PDF 906 KB Posted
- Contract number
- HW555
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. HW555 under Task Assignment DC009o. The contract involves GHD Services, Inc., a contractor, with Brian Moore serving as the contractor representative. Kevin Kane is the FDEP Contract Manager, and the task is assigned to the West Side Cleaners site located at 5036 W. Colonial Drive, Orlando, Orange County, Florida (DEP Site #ERIC_5025). The task falls under the monitoring phase of the indefinite delivery contract vehicle.
GHD Services, Inc. will conduct annual groundwater monitoring activities in accordance with the May 2021 scope of work and cost proposal. The work comprises two subtasks: Subtask 1 (Project Management) calculated at 12.5 percent of direct labor, and Subtask 2 (Groundwater Monitoring), which includes standard groundwater sampling at six monitoring wells and passive diffusion bag sampling at seven additional wells. All samples will be analyzed for volatile organic halocarbons by EPA Method 8260. The final deliverable is a Groundwater Monitoring Report due September 9, 2021, with task completion scheduled for December 10, 2021. The task assignment is structured as a Fixed Price contract with a total not-to-exceed amount of $6,140.62, with no retainage. Invoice payment of the full amount is due upon completion of groundwater monitoring activities and FDEP approval of the Groundwater Monitoring Report. No option periods or renewals are specified in the documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 N/ADC009o
GHD Services, Inc.
Brian Moore
(850) 245-8971Kevin Kane
ERIC_5025
West Side Cleaners
5036 W. Colonial Drive, Orlando, Orange
Monitoring
GHD Services, Inc. will conduct groundwater monitoring in accordance with the May 2021 scope of work and cost proposal. Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
09/09/2021
12/10/2021
$ 6,140.62 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.27 09:24:54 -04'00'
Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.27 09:25:21 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.06.01 12:47:59 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2021.06.01 14:56:53 -04'00'
$ 6,140.62
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 09/09/2021
Upon completion of groundwater monitoring activities and FDEP approval of Groundwater Monitoring Report $ 6,140.62
$ 6,140.62
HW555
DC009o
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW555 Contract File West Side Cleaners
ERIC_5025
Orlando, Orange County
FROM: Kevin Kane, Contract Manager
DATE: May 27, 2021
SUBJECT: Task Assignment Summary
HW555 DC009o Monitoring
GHD Services, Inc. will conduct groundwater monitoring. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring Standard groundwater sampling will be conducted at 6 monitoring wells. Additional sampling will be conducted at 7 monitor wells via passive diffusion bags. All samples will be submitted to a certified lab for testing and analyzed for VOHs by EPA Method 8260.
IDW disposal is anticipated for this sampling event and has been accounted for under this subtask. All available site wells (31 total) will also be sampled for water level measurements. Upon completion of groundwater sampling, a Groundwater Monitoring Report will be prepared and submitted to FDEP. Report will include field notes, analytical results, and recommendations.
This work will be conducted in line with the scope of work included in the GHD proposal, received May 21, 2021.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is September 9, 2021, and the completion date for the Task Assignment is December 10, 2021.
The final cost total for Task Assignment DC009o is $6,140.62.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/26/21
Task #: DC009o SubTask 1 Project Management SubTask 6
Site: West Side Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 2.40 2.397 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$44.21 Professional Engineer/Geologist JH 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$21.14 Junior Technician BJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 52.40 2.397 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,504.00 $167.11 $1,336.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,699.52 $188.83 $1,510.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $421.12 $46.79 $374.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $383.52 $42.61 $340.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,008.16 $445.34 $3,562.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $75.20 $8.36 $66.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/26/21
Task #: DC009o SubTask 1 Project Management SubTask 6
Site: West Side Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $95.00 $95.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $95.00 $95.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $9.50 $9.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $104.50 $104.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $858.00 $858.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $918.00 $918.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $504.45 $504.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $536.95 $536.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,739.81 $453.70 $5,286.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $400.81 $44.53 $356.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $6,140.62 $498.23 $5,642.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : West Side Cleaners
PROJECT NUMBER: 090132
FDEP NO: 489502256 ERIC_5025
SUBTASK: Groundwater Monitoring
DATE: 5/26/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer BM Conclusions and Recommendations 1
Professional Engineer JH Order sample kit/develop field scope of work/contact property owner 1.5 Professional Engineer JH Verify COC after sampling/review results when received 1 Professional Engineer JH Coordinate IDW Disposal 1 Professional Engineer JH Site Assessment/Remediation Background 1 Professional Engineer JH Groundwater Sampling Scope of Work 1.5 Professional Engineer JH Groundwater Field Parameter Summary 1 Professional Engineer JH Water Level evaluation (shallow / deep) 2 Professional Engineer JH Groundwater analytical results evaluation (shallow / deep) 3 Professional Engineer JH QA/QC 1 Professional Engineer JH Conclusion and Recommendations 1
Junior Technician SA Mob/Demob (from Orlando) 1 Junior Technician SA Water Levels (all wells - 31 total) 2.5 Junior Technician SA Sample 3 wells 4.5 Junior Technician SA Sample diffusion bags (7 wells) 3
Junior Technician WO Mob/Demob (from Tampa) 4 Junior Technician WO Water Levels (all wells - 31 total) 2.5 Junior Technician WO Sample 3 wells 4.5 Junior Technician WO Sample diffusion bags (7 wells) 3
CADD Design PM Groundwater elevation and flow (shallow/deep) 2 CADD Design PM Groundwater Analytical Maps (shallow/deep) 2
Staff Assistants SS Data Entry (31 water levels/13 well samples) 2 Staff Assistants SS Summary tables (elevation, analytical) 1.5 Staff Assistants SS Publish Report/generate pdf 1 Staff Assistants SS GIS/Adapt update 1.5
TOTAL LABOR 50.0
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Gulf Coast IDW disposal $95.00 drum 1 $95.00
TOTAL SUBS $95.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
EPA method 8260 VOHs $66.00 13 $858.00 mple shipping (Two Day - large cooler) $60.00 1 $60.00
TOTAL LAB $918.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 1 $32.50 Sub-Total $32.50
Diffusion sampler each (small well) $22.35 each 7 $156.45 Groundwater Sampling Kit $208.55 day 1 $208.55 Poly Tubing $0.25 ft 277 $69.25 Silicon Tubing $2.00 ft 6 $12.00 Drum $58.20 drum 1 $58.20
Sub-Total $504.45
TOTAL EQUIPMENT $536.95
TA_009o.xlsx\sub 2 Page 3 5/26/20214:51 PM
COST PROPOSAL FOR TASK DC009o < West Side Cleaners, 489502256 ERIC_5025>
Groundwater Monitoring
1. INTRODUCTION:
A Soil Vapor Extraction (SVE) system was operated at the West Side Cleaners site until late 2015. At that time, the system was shutdown and soil confirmation sampling was conducted.
Since the drycleaner was still active and utilized PCE in its operation, continued system shutdown was recommended along with periodic groundwater monitoring. Task DC009o includes annual groundwater monitoring in accordance with GHD recommendations and Department approval dated September 22, 2020.
Subtask 1: Project Management Includes all tasks associated with project management for completion of groundwater sampling and reporting.
Subtask 2: Groundwater Monitoring Subtask 2 includes annual groundwater sampling in July 2021. Prior to groundwater sampling, depth to water measurements will be gathered from all available site monitor wells (31 total). During the previous sampling in July 2019, GHD personnel installed passive diffusion bags (PDB) at select site monitor wells. As such, PDB sampling is proposed at seven
(7) site monitor wells including MW014, MW018, MW021, MW023, MW024, MW026, and MW027. In addition to the use of existing PDBs, GHD will also sample monitoring wells MW003, MW005, MW007, MW009, MW015, and MW028 using conventional methods per FDEP recommendations. These wells do not contain diffusion bags. All samples will be submitted to a Florida-certified laboratory and analyzed for the presence of volatile organic halocarbons by EPA Method 8260.
Upon receipt of analytical data, a summary report will be prepared. The summary report will include a detail of field sampling methodology, a summary of groundwater elevation data and flow interpretations, as well as a summary of groundwater analytical results. The report will also include conclusions and recommendations for additional monitoring and/or remedial activities.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 9/9/21
Gulf Coast Vacuum Truck Services 1744 Williams Ditch Rd
Cantonment, FL 32533 US
+1 8504500058 accounting@gcvts.net
Estimate
ADDRESS
GHD
ESTIMATE 1040
DATE 04/15/2021
DATE SERVICE DESCRIPTION QTY RATE AMOUNT
Drum Disposal Disposal of of 1 drum of contaminated water.
1 95.00 95.00
Island Cleaners - Sanibel TOTAL $95.00
Accepted By
Accepted Date
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
April 15, 2021
Re: Non-Hazardous Drum Disposal Quote – South and Central Florida
Mr. Moore:
The price for disposal of drums of non-hazardous soil or groundwater located in south and central
Florida will be $100.00 per drum, total, for both transportation and disposal.
Pricing for the Florida Keys will be quoted separately on a case-by-case basis.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/21/21 Thu 6/3/21
2 Subtask 1: Project Management
71 days Thu 6/3/21 Thu 9/9/21
3 Subtask 2:
Groundwater Monitoring
51 days Thu 7/1/21 Thu 9/9/21
4 Field Work Preparation2 wks Thu 7/1/21 Wed 7/14/21
5 Groundwater Sampling1 day Thu 7/22/21 Thu 7/22/21
6 Groundwater Monitoring Report
6 wks Fri 7/30/21 Thu 9/9/21
5/9 5/16 5/23 5/30
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC009o at the Westside Cleaners facility located in Orlando, Orange County
Project: TA_009o Date: Fri 5/21/21
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/21/21 Thu 6/3/21
2 Subtask 1: Project Management
71 days Thu 6/3/21 Thu 9/9/21
3 Subtask 2:
Groundwater Monitoring
51 days Thu 7/1/21 Thu 9/9/21
4 Field Work Preparation2 wks Thu 7/1/21 Wed 7/14/21
5 Groundwater Sampling1 day Thu 7/22/21 Thu 7/22/21
6 Groundwater Monitoring Report
6 wks Fri 7/30/21 Thu 9/9/21
6/6 6/13 6/20 6/27 3rd Quart
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC009o at the Westside Cleaners facility located in Orlando, Orange County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/21/21 Thu 6/3/21
2 Subtask 1: Project Management
71 days Thu 6/3/21 Thu 9/9/21
3 Subtask 2:
Groundwater Monitoring
51 days Thu 7/1/21 Thu 9/9/21
4 Field Work Preparation2 wks Thu 7/1/21 Wed 7/14/21
5 Groundwater Sampling1 day Thu 7/22/21 Thu 7/22/21
6 Groundwater Monitoring Report
6 wks Fri 7/30/21 Thu 9/9/21
Jeremy Hess
Skylar Albritton,Will
7/4 7/11 7/18 7/25 ter
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC009o at the Westside Cleaners facility located in Orlando, Orange County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/21/21 Thu 6/3/21
2 Subtask 1: Project Management
71 days Thu 6/3/21 Thu 9/9/21
3 Subtask 2:
Groundwater Monitoring
51 days Thu 7/1/21 Thu 9/9/21
4 Field Work Preparation2 wks Thu 7/1/21 Wed 7/14/21
5 Groundwater Sampling1 day Thu 7/22/21 Thu 7/22/21
6 Groundwater Monitoring Report
6 wks Fri 7/30/21 Thu 9/9/21 iam Ouchie
8/1 8/8 8/15 8/22
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC009o at the Westside Cleaners facility located in Orlando, Orange County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 5/21/21 Thu 6/3/21
2 Subtask 1: Project Management
71 days Thu 6/3/21 Thu 9/9/21
3 Subtask 2:
Groundwater Monitoring
51 days Thu 7/1/21 Thu 9/9/21
4 Field Work Preparation2 wks Thu 7/1/21 Wed 7/14/21
5 Groundwater Sampling1 day Thu 7/22/21 Thu 7/22/21
6 Groundwater Monitoring Report
6 wks Fri 7/30/21 Thu 9/9/21 Brian Moore,Jeremy Hess,Peter McLea
8/29 9/5 9/12 9/19
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC009o at the Westside Cleaners facility located in Orlando, Orange County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .