CN-370000-HW555-DC004K.pdf
PDF 626 KB Posted
- Contract number
- HW555
- Issued by
- Florida
About this file
This Task Assignment Notification Form documents work conducted under Florida Department of Environmental Protection (FDEP) Contract No. HW555 between the state and GHD Services, Inc. The task assignment, designated DC004K, is managed by FDEP Contract Manager Kevin Kane and involves groundwater monitoring services at the Warrington Village (formerly Big B Cleaners) site located at 401 North Navy Boulevard in Warrington, Escambia County, Florida. The site is identified as ERIC_4656 in FDEP's tracking system, and Brian Moore serves as the contractor representative.
The task assignment covers annual groundwater sampling and monitoring activities conducted in accordance with a May 2021 scope of work and cost proposal from GHD Services, Inc. Work includes two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring, which encompasses collection of groundwater samples from diffusion bags at 15 monitoring wells across four geological zones, water level measurements from 40 wells, and laboratory analysis of samples for volatile organic halocarbons using EPA Method 8021. The final deliverable, a Groundwater Monitoring Report, was due September 2, 2021, with task completion scheduled for December 3, 2021. The fixed-price contract value is $7,012.21, with no retainage, cost reimbursement, or additional fees. Invoice payment is contingent upon completion of groundwater sampling activities and FDEP approval of the final Groundwater Monitoring Report. The cost estimate includes labor ($4,418.78), travel expenses ($599.00), laboratory analysis ($1,050.00), field equipment ($419.65), and a completion fee ($441.88).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 N/ADC004K
GHD Services, Inc.
Brian Moore
(850) 245-8971Kevin Kane
ERIC_4656
Warrington Village (Former Big B Cleaners)
401 North Navy Boulevard, Warrington, Escambia County
Monitoring
GHD Services, Inc. will conduct groundwater sampling in accordance with the May 2021 scope of work and cost proposal. A Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
09/02/2021
12/03/2021
$ 7,012.21 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.11 08:29:01 -04'00'
Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.11 08:29:21 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.05.11 10:59:02 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2021.05.11 11:38:42 -04'00'
$ 7,012.21
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 09/02/2021
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 7,012.21
$ 7,012.21
HW555
DC004K
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW555 Contract File Warrington Village (Former Big B Cleaners)
ERIC_4656
Warrington, Escambia County
FROM: Kevin Kane, Contract Manager
DATE: May 11, 2021
SUBJECT: Task Assignment Summary
HW555 DC004K
Monitoring
This Task Assignment is for GHD to conduct annual groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring Groundwater samples will be collected from diffusion bags at 15 different wells across the shallow, intermediate-shallow, intermediate, and deep zones. Following collection, samples will be analyzed for VOHs by EPA Method 8021. GHD will also record water levels from all available monitoring wells screened in the intermediate-shallow and deep zones (40 total). Following receipt of analytical results, a Groundwater Monitoring Report will be generated.
This work will be conducted in line with the scope of work included in the GHD proposal, received May 10, 2021.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is September 2, 2021 and the completion date for the Task Assignment is December 3, 2021.
The final cost total for Task Assignment DC004K is $7,012.21.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/10/21
Task #: DC004K SubTask 1 Project Management SubTask 6
Site: Warrington Village (former Big B SubTask 2 Groundwater Sampling SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 2.64 2.643 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$49.00 Professional Engineer/Geologist KC 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$28.85 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.08 Junior Technician SC 32.00 32.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician PM 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 59.64 2.643 57.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,658.08 $184.23 $1,473.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,873.63 $208.18 $1,665.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $464.26 $51.58 $412.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $422.81 $46.98 $375.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,418.78 $490.97 $3,927.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $82.90 $9.21 $73.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/10/21
Task #: DC004K SubTask 1 Project Management SubTask 6
Site: Warrington Village (former Big B SubTask 2 Groundwater Sampling SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $308.00 $308.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $599.00 $599.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $990.00 $990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,050.00 $1,050.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $354.65 $354.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $419.65 $419.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,570.33 $500.18 $6,070.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $441.88 $49.10 $392.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,012.21 $549.28 $6,462.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Warrington Village (Former Big B Cleaners)
PROJECT NUMBER: 090125
FDEP NO: 179700278 ERIC_4656
SUBTASK: Groundwater Sampling
DATE: 5/10/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer BM Conclusions/Recommendations 1
Professional Geologist KC Coordinate field sampling kit/site access 0.5 Professional Geologist KC Verify COC and analysis 0.5 Professional Geologist KC Historical assessment/remedial summary 1 Professional Geologist KC Field sampling methodology/analysis 1 Professional Geologist KC Groundwater flow evaluation (shallow, int shallow, intermediate) 3 Professional Geologist KC Groundwater Analytical (shallow, int shallow, int/deep) 3 Professional Geologist KC QA/QC laboratory data 1 Professional Geologist KC Conclusions/Recommendations 1
Junior Technician SC Mob/Demob (from Jacksonville) 10 Junior Technician SC Water Levels (All Wells - 40 total) 8 Junior Technician SC Groundwater Sampling (14 wells) - 15 samples 14
Drafting Technician PM Groundwater flow (shallow, int shallow, int) 3 Drafting Technician PM Groundwater analytical (shallow, int shallow, int, deep) 4
Staff Assistants SS Data Entry (40 water levels 14 well samples) 2 Staff Assistants SS Document Preparation/Publishing generate pdf 2 Staff Assistants SS GIS/ADAPT Update 2
TOTAL LABOR 57
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 3 $291.00
TOTAL VEHICLE $291.00
PER DIEM TYPE RATE UNIT USEAGE Miles Free
Hotel $100.00 night 2 $200.00 Per Diem $36.00 day 3 $108.00
TOTAL VEHICLE $308.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOHs (Groundwater) $66.00 15 $990.00
Sample Shipping 2 day large cooler $60.00 1 $60.00
TOTAL LAB $1,050.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 2 $65.00 Sub-Total $65.00
Water Level Indicator $19.40 day 1 $19.40 Diffusion Bag Sampler (2" Well) $22.35 each 15 $335.25
Sub-Total $354.65
TOTAL EQUIPMENT $419.65
TA_004K\sub 2 Page 3 5/10/20213:53 PM
COST PROPOSAL FOR TASK DC004K
<Warrington Cleaners, 179700278 ERIC_4656>
< Annual Groundwater Sampling>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
Following redevelopment of the site as a Walmart Supercenter, GHD completed the installation of replacement groundwater monitoring wells at the Warrington Village Shopping Center (former Big B Cleaners) site in Pensacola, Escambia County. Task DC004K includes annual groundwater monitoring in accordance with GHD recommendations and FDEP approval dated August 31, 2020.
Subtask 1: Project Management Subtask 1 includes all activities associated with the management of groundwater sampling and reporting at the Warrington Village Site.
Subtask 2: Groundwater Monitoring Task DC004K includes groundwater monitoring in June 2021. The monitoring wells proposed for the sampling event include:
Shallow Zone
MW004, MW117, MW123 & MW125
Intermediate-Shallow Zone
MW047, MW048, MW050, MW108, MW111, MW125 & IW016
Intermediate Zone
MW107, MW110, & MW124
Deep Zone
MW007
Sampling will include gathering samples from diffusion bags only. Additionally, GHD will gather water levels from all of available monitoring wells screened in the intermediate-shallow and deep zones (40 total). All groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8021.
Upon receipt of analytical data, GHD will prepare a groundwater monitoring report summarizing sampling activities and results of the groundwater analysis. The report will include conclusions regarding current groundwater quality and a schedule for additional testing.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 9/2/21
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 5/10/21 Fri 5/21/21
2 Subtask 1: Project Management
74 days Mon 5/24/21 Thu 9/2/21
3 Subtask 2:
Groundwater Monitoring
49 days Sat 6/26/21 Thu 9/2/21
4 Field Work Preparation2 wks Sat 6/26/21 Thu 7/8/21
5 Groundwater Sampling3 days Mon 7/12/21 Wed 7/14/21
6 Groundwater Monitoring Report
6 wks Fri 7/23/21 Thu 9/2/21
5/2 5/9 5/16 5/23 ay
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004K at the Warrington Village (former Big B) facility located in Warrington, Escambia County
Project: TA_004K Date: Mon 5/10/21
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 5/10/21 Fri 5/21/21
2 Subtask 1: Project Management
74 days Mon 5/24/21 Thu 9/2/21
3 Subtask 2:
Groundwater Monitoring
49 days Sat 6/26/21 Thu 9/2/21
4 Field Work Preparation2 wks Sat 6/26/21 Thu 7/8/21
5 Groundwater Sampling3 days Mon 7/12/21 Wed 7/14/21
6 Groundwater Monitoring Report
6 wks Fri 7/23/21 Thu 9/2/21
5/30 6/6 6/13 6/20 June
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004K at the Warrington Village (former Big B) facility located in Warrington, Escambia County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 5/10/21 Fri 5/21/21
2 Subtask 1: Project Management
74 days Mon 5/24/21 Thu 9/2/21
3 Subtask 2:
Groundwater Monitoring
49 days Sat 6/26/21 Thu 9/2/21
4 Field Work Preparation2 wks Sat 6/26/21 Thu 7/8/21
5 Groundwater Sampling3 days Mon 7/12/21 Wed 7/14/21
6 Groundwater Monitoring Report
6 wks Fri 7/23/21 Thu 9/2/21
Kenneth Caldwell
Steven Custer
6/27 7/4 7/11 7/18 July
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004K at the Warrington Village (former Big B) facility located in Warrington, Escambia County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 5/10/21 Fri 5/21/21
2 Subtask 1: Project Management
74 days Mon 5/24/21 Thu 9/2/21
3 Subtask 2:
Groundwater Monitoring
49 days Sat 6/26/21 Thu 9/2/21
4 Field Work Preparation2 wks Sat 6/26/21 Thu 7/8/21
5 Groundwater Sampling3 days Mon 7/12/21 Wed 7/14/21
6 Groundwater Monitoring Report
6 wks Fri 7/23/21 Thu 9/2/21
7/25 8/1 8/8 8/15 August
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004K at the Warrington Village (former Big B) facility located in Warrington, Escambia County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 5/10/21 Fri 5/21/21
2 Subtask 1: Project Management
74 days Mon 5/24/21 Thu 9/2/21
3 Subtask 2:
Groundwater Monitoring
49 days Sat 6/26/21 Thu 9/2/21
4 Field Work Preparation2 wks Sat 6/26/21 Thu 7/8/21
5 Groundwater Sampling3 days Mon 7/12/21 Wed 7/14/21
6 Groundwater Monitoring Report
6 wks Fri 7/23/21 Thu 9/2/21 Brian Moore,Kenneth Caldwell,Peter
8/22 8/29 9/5 9/12 September
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004K at the Warrington Village (former Big B) facility located in Warrington, Escambia County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .