CN-370000-HW552-DC024J.pdf
PDF 2 MB Posted
- Contract number
- HW552
- Issued by
- Florida
About this file
Summary
This Task Assignment Notification Form (WCP TAFORM 01_18) is issued under DEP Contract No. HW552 by the Florida Department of Environmental Protection (FDEP) Hazardous Waste Cleanup Section to Professional Service Industries, Inc. (PSI). The contract authorizes PSI to oversee monitoring well abandonment activities at the Williamsburg Dry Cleaners facility (ERIC_5031) located at 5458 Central Florida Parkway, Orlando, Orange County, Florida. The task assignment was executed on July 14-16, 2021, with Killian Talley serving as the DEP Contract Manager and Nana Westmark as the contractor representative.
The scope of work consists of two subtasks: Subtask 1 addresses project management with labor hours calculated automatically based on direct labor costs, and Subtask 2 involves coordinating monitoring well abandonment activities including contracting subcontractors, implementing the work plan, site restoration, and preparing a well abandonment report. The task assignment is structured as a fixed-price contract with a total value of $6,127.44 with no retainage. The deliverable—Submittal of Well Abandonment Report—is due September 24, 2021, with the task assignment execution period extending through December 17, 2021. Invoice payment is contingent upon FDEP receipt and approval of the well abandonment report. The cost estimate includes $2,039.04 in labor costs (17 hours), $3,749.90 in subcontractor costs for well drilling services, $97.00 in vehicle rental, and a completion fee of $203.91.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW552
D000 N/ADC024J
Professional Service Industries, Inc. (PSI)
Nana Westmark
850-245-8928Killian Talley
ERIC_5031
Williamsburg Dry Cleaners
5458 Central Florida Parkway, Orlando, Orange
Deletion
This Task Assignment authorizes PSI to oversee monitoring well abandonment activities in accordance with the attached scope of work, cost estimate, and bid documentation.
Submittal of Well Abandonment Report
09/24/2021
12/17/2021
$ 6,127.44 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Killian Talley Digitally signed by Killian Talley Date: 2021.07.14 10:24:34 -04'00'
Killian Talley Digitally signed by Killian Talley Date: 2021.07.14 10:25:39 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.07.16 07:12:18 -04'00'
Nana G Westmark Digitally signed by Nana G Westmark Date: 2021.07.16 09:22:34 -04'00'
$ 6,127.44
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Well Abandonment Report 09/24/2021
Subtasks 1-2: FDEP receipt and approval of Well Abandonment Report $ 6,127.44
$ 6,127.44
HW552
DC024J
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW552 Contract Negotiation File Williamsburg Dry Cleaners Orlando, Orange County
ERIC_5031
From: Killian Talley, Project Manager Date: July 14, 2021 Subject: Negotiation Summary
HW552 DC024J
Task Assignment HW552 DC024J is for PSI to oversee well abandonment activities.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Monitoring Well Abandonment Under this subtask PSI will coordinate with field staff to implement the work plan including contracting required subcontractors for abandonment activities and site restoration activities.
Subtask includes costs and labor related to monitoring well abandonment as required by the site rehabilitation completion order. National Environmental Technology has been selected as the lowest responsive and responsible bidder for this action. As part of abandonment activities affected areas will be restored to previous conditions as part of site restoration. Subtask includes costs and labor related to preparation of a well abandonment report for review and submittal to the Department.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,127.44 with 17 labor hours.
PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATE
Contractor: Chastain-Skillman, Inc.
Date: 6/10/2021
Task #: SubTask 1 Project Management SubTask 6
Site: Williamsburg Dry Cleaner SubTask 2 Abandon Wells SubTask 7
Activity/Phase: Well Abandonment SubTask 3 SubTask 8
Project Manager: Greg Lassi SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
Chastain-Skillman, Inc.
$49.76 Project Manager (GJL) 1.7 1.7
$55.50 Principal 0 0 0 0 0 0 0 0 0 0
$75.00 Division Head 0 0 0 0 0 0 0 0 0 0
$49.04 Department Head 0 0 0 0 0 0 0 0 0 0
$49.76 Sr. Consultant (GJL) 2.5 2.5 0 0 0 0 0 0 0 0
$40.29 Sr. Project Manager (CBB) 13.5 13.5 0 0 0 0 0 0 0 0
$35.50 Project Manager 0 0 0 0 0 0 0 0 0 0
$35.00 Sr. Project Engineer (Registered) 0 0 0 0 0 0 0 0 0 0
$33.00 Project Engineer 0 0 0 0 0 0 0 0 0 0
$28.00 Engineering Intern 0 0 0 0 0 0 0 0 0 0
$31.00 Project/Designer 0 0 0 0 0 0 0 0 0 0
$16.00 Engineer Aide 0 0 0 0 0 0 0 0 0 0
$37.00 Sr. Hydrogeologist/Env. Sci 0 0 0 0 0 0 0 0 0 0
$26.00 Hydrogeologist/Env. Scientist II 0 0 0 0 0 0 0 0 0 0
$20.00 Hydrogeologist/Env. Scientist I 0 0 0 0 0 0 0 0 0 0
$31.50 Sr. Industrial Hygienist (Registered) 0 0 0 0 0 0 0 0 0 0
$21.00 Industrial Hygienist I 0 0 0 0 0 0 0 0 0 0
$41.00 Land Surveyor & Mapper (Registered) 0 0 0 0 0 0 0 0 0 0
$22.50 Survey Supervisor 0 0 0 0 0 0 0 0 0 0
$44.50 2 man Survey Crew 0 0 0 0 0 0 0 0 0 0
$55.00 2 man Survey Crew w/ GPS 0 0 0 0 0 0 0 0 0 0
$22.00 GIS Specialist/Programmer 0 0 0 0 0 0 0 0 0 0
$25.25 Sr. Draftsman 0.0 0 0 0 0 0 0 0 0 0
$21.00 Draftsman 0 0 0 0 0 0 0 0 0 0
$33.50 Sr. Construction Representative 0 0 0 0 0 0 0 0 0 0
$27.50 Construction Project Representative 0 0 0 0 0 0 0 0 0 0
$11.00 Staff - Clerical 0 0 0 0 0 0 0 0 0 0
Total Hours 17.7 1.7 16.0 0.0 0 0.0 0 0 0 0 0
Professional Service Industries, Inc.
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 170.96% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sub-Total Labor (PSI) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Chastain-Skillman, Inc.
Direct Labor $751.86 $83.54 $668.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 117.20% $881.18 $97.91 $783.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 54.00% $406.00 $45.11 $360.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sub-Total Labor (C-S) $2,039.04 $226.56 $1,812.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $2,039.04 $226.56 $1,812.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $37.60 $4.18 $33.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Williamsburg P&A Proposal 061021 Page 1
FDEP COST ESTIMATEContractor: Chastain-Skillman, Inc.
Date: 6/10/2021
Task #: SubTask 1 Project Management SubTask 6
Site: Williamsburg Dry Cleaner SubTask 2 Abandon Wells SubTask 7
Activity/Phase: Well Abandonment SubTask 3 SubTask 8
Project Manager: Greg Lassi SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $3,409.00 $3,409.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,409.00 $3,409.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $340.90 $340.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $3,749.90 $3,749.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,923.54 $230.74 $5,692.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $203.91 $22.66 $181.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $6,127.44 $253.40 $5,874.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Williamsburg P&A Proposal 061021 Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Williamsburg Dry Cleaner SUBTASK: Abandon Wells
DATE: 6/10/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Consultant Technical Oversight & Site Access and Notices 1 (G. Lassi, PG) Review Field data 0.5
Sr. Project Manager travel, one round trip for plugging oversight 2 (C. Browning, PG) load, unload eqt and supplies 1 well abandonment oversight 8
Sr. Project Manager Prepare Report 2.5 Sr. Consultant Review Report 1
TOTAL LABOR 16
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USEAGE
Equipment Van $97.00 day 1 $97.00
$0.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
NET, Inc well plugging 1 $3,409 $3,409.00
TOTAL $3,409.00
HW552_DC024J_CEFLOE Page 1
June 10, 2021
MMMM DD,
www.intertek.com/building
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916
Florida Department of Environmental Protection Hazardous Waste Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Mr. Killian Talley Telephone: 850-245-8928 Email: Killian.Talley@dep.state.fl.us
Re: Proposal for Well Abandonment
Williamsburg Dry Cleaner (former) 5458 Central Florida Parkway Orlando, Florida Facility ID ERIC_5031
Dear Mr. Talley:
Professional Service Industries, Inc. (PSI) is pleased to provide this proposal to complete the well abandonment activities for the referenced location. Included with this proposal is a brief discussion of the project history, proposed scope of work, cost estimate, and a proposed schedule for completion.
PROJECT BACKGROUND
The former Williamsburg Dry Cleaners occupies a tenant space near the western end of the “Williamsburg Downs” Shopping Center. The facility is currently doing business as “All Star Dry Cleaners” with on-site cleaning using the petroleum product DF-2000. The possible solvent release was identified through a Site Screening Investigation completed by Nelson Engineering in June 1997. A Site Assessment Report was submitted by Chastain-Skillman (CS) in April 2015. The results of the assessment revealed a vadose zone source area under the south end of the tenant space and a dissolved plume extending from the building toward the south- south west. The SAR concluded with a recommendation to begin groundwater monitoring.
A Performance Base Cleanup (PBC) agreement to complete an Interim Source Removal by Soil Vapor Extraction was tasked on July 19, 2016. The SVE system was made operational on December 9, 2016 and performed as designed through August 2018. The last Remedial Action System Status Report dated August 31, 2018, concluded that the PBC goals had been met and that the system should be decommissioned and removed from the site. Following FDEP approval, the SVE system was decommissioned, and the trailer was removed from the Site on September 14, 2018.
FDEP – Williamsburg Dry Cleaners
Post Active Remediation (PARM) groundwater monitoring was completed in October 2018 and October 2019. No VOH contaminant of concern concentrations exceeded GCTLs at any of the well locations that were sampled. The FDEP Memorandum dated August 7, 2020, recommended completion of two additional quarterly groundwater monitoring events, which were conducted in September and December 2020. The final PARM report with a Site Rehabilitation Completion request for No Further Action without Controls was approved by the Department on March 15, 2021, and the SRCO was issued on May 28, 2021.
The following proposal includes costs to properly plug and abandon the remaining remediation wells and monitoring wells at the site.
PROPOSED SCOPE OF WORK
The proposed well abandonment activities will be implemented in general accordance with the FDEP’s Standard Operating Procedures for Field Activities (DEP SOP-001/01) and the site Health and Safety Plan developed for this project. CS will conduct the following activities to address the project objectives:
Plugging Requirements for Williamsburg Dry Cleaners Facility ID number ERIC_5031
Well Diameter Depth 8 " MH in 2'x2' pad
4 " MH
in 6" boring Patch with: (inch) (feet)
MW1 1 8 X Concrete MW2 1 12 X Sand MW3 1 9 X Sand MW4 1 12 X Concrete MW5 1 12 X Sand MW6 1 12 X Sand MW7 1 24 X Sand MW8 1 24 X Concrete MW9 1 39 X Concrete
MW10 1 24 X Concrete MW11 0.75 24 X concrete
VE3 2 6 X Sand VE4 2 6 X Sand VE5 2 6 X Concrete VE6 2 6 X Concrete total linear feet 224 13 2
FDEP – Williamsburg Dry Cleaners
Subcontract a licensed drilling contract to properly abandon the wells listed in the above table. All of the surface completions and manholes will be removed, and the paving restored with a smooth concrete patch. Sand will be used to backfill the pad voids in grassed areas.
CS will provide field oversight, photographic documentation, and prepare a Well Abandonment Report as the final deliverable for this project.
COST ESTIMATE AND SCHEDULE
The cost estimate for the plugging activities is included on the attached cost spreadsheet and level of effort. All PSI services will be conducted in accordance with the terms and conditions contained within FDEP Bureau of Waste Cleanup Services Consolidated Contract No. HW552.
The anticipated schedule to complete these activities following authorization to proceed is as follows:
initiating field work within twenty-one (21) days, and provide the FDEP with the well abandonment report within 45 days.
PSI appreciates the opportunity to be of service to the FDEP. We look forward to working with you on this important project. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Michael Rothenburg, PE Nana Westmark, PG, CHMM Department Manager Regional Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Consultant Name: Chastain Skillman
Site Name & Location: Williamsburg Cleaners, Orlando, FL Date: 6/3/21 FAC ID#:
PROPOSED SCOPE OF WORK:
Abandon 11 .75"-1" MW's totalling 200', well depths 8'-39'
Abandon 4-2" SVE Wells 6' each
Remove 13 pads and manholes, restore grade, remove 2 manhole lids and steel rings, concrete in place, remove and dispose of debris
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____ Sonic_____ Other_____
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation) (includes decon)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Recovery Well Diameter: 4-6" per foot $0.00 Double Cased Wells $0.00
6" Surface Casing per foot $0.00 8" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $6.00 224 $1,344.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $95.00 13 $1,235.00
Mobilization roundtrip $450.00 1 $450.00
Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $45.00 11 $495.00 Remove Manhole Lid and Steel Ring, Concrete each $35.00 2 $70.00
$0.00
$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $3,594.00
Days to Complete Scope of Work: 1 Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Kevin Bonacum, Estimator Date: 6/3/21
Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Chastain Skillman, Williamsburg Cleaners, Orlando
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .